Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Your Roofer's Crew Cars Need a Spot Before Roof Day

Compare each roofer's answer on where crew members leave their own cars during the job, and what the bid should write down before roof day.

On roof day most of the attention goes to the trucks, the trailer and the dumpster. The crew's own cars get less thought, yet they often sit on your street for the whole working day, and on a St. Louis County block with narrow lanes and parked neighbors, a row of personal vehicles can decide whether the shingle truck gets close enough to unload. A roofer who has planned for this will tell you where those cars go before the first nail is driven. A roofer who has not planned will find out when the trailer is stuck.

This page is about that one question, so you can put each roofer's answer next to the others. Keep it on your own list beside the other items you are comparing, and write down what each company says in its own words.

Why the crew's own cars are a roof day question

A roof crew on a typical job is several people, and most of them drive in alone. In many cases their cars arrive before the trucks, either because the crew meets at a yard and rolls out together or because people drive straight to the house. Either way, the cars take the same curb and apron space that the delivery truck, the tear-off trailer, the dumpster and the magnet sweep all need. If the bid does not give those vehicles a place, the crew will pick one on its own, and the pick is usually the closest open spot.

Older parts of St. Louis County often have streets where the curb is narrow, the lots sit close together, and the cars of neighbors and visitors already fill most of the available space. Municipal rules on parking near a corner, a hydrant or a driveway apron are not the same from one city to the next, and some desks treat a parked passenger car differently from a truck or a dumpster. That is why a roofer's answer should name the spot and not just promise the crew will park respectfully.

Weather adds a second reason. A thaw in February or March can leave the grass shoulder soft, and a car that sits on it for a day can leave ruts that show up in the spring. A hail or wind forecast can also change the day. If the crew has to leave quickly to secure a tarp or to chase materials blowing around the yard, the cars need to be where they can pull out without a shuffle. A plan that works on a calm morning may fail on the afternoon of a storm day.

Neighbors notice. A car parked in front of someone's mailbox for ten hours is a complaint waiting to be made, and the person who gets the call is usually you, the homeowner, unless the bid says who takes it.

What a specific answer sounds like

A specific answer names a place. It might be an off-street spot on your own property that you have agreed to, such as the far end of the drive if the trailer and dumpster go elsewhere. It might be a particular stretch of curb on the side away from the trailer. It might be a rule that the crew carpools to the house so only one or two vehicles are present. It might also be a rule that no personal car stands on the lawn, a neighbor's apron, a fire lane, a hydrant or a corner, and that the crew will move a car at your request within a stated time.

A vague answer sounds like "we will be respectful of the neighborhood" or "our guys know where to park." Neither one tells you where a car will be at 7:30 on a Tuesday morning. A vague answer is not always a warning sign, since a small crew working from a yard may never have had to think it through. But it is not a plan, and a plan is what you are comparing.

Ask whether the answer is in the bid or only in a conversation. If it lives only in a conversation, ask for it in writing, either in the scope or in the pre-start sheet the roofer sends before day one.

Compare the answers in one place

Write each roofer's answer in the same row so the differences show at a glance. The points below cover most of what matters.

  • Where the crew's personal cars wait for the whole day, named by address or by a specific stretch of curb and not by a general area.
  • Whether any car may stand on your lawn, a neighbor's apron, a fire lane, near a hydrant or at a corner.
  • How many personal vehicles to expect on the street on a typical day, and whether the crew carpools.
  • Which spot is reserved for the trailer, the dumpster and the delivery truck, and how personal cars are kept out of it.
  • Who moves a car that blocks a truck, and how long that takes.
  • Who takes a neighbor's call about parking, and that person's direct phone number.
  • Whether the plan changes on a storm day or on a day when materials arrive late, and who tells you when it does.
  • Whether a city permit, a cone or a temporary no-parking sign is needed for the spot, and who orders it.

A roofer who answers all eight points in writing has given you more to compare than one who answers two. Mark a blank cell as blank rather than skipping the row, because a missing answer is still a result you can compare.

What it costs

Parking on a public street usually costs the homeowner nothing directly, but a parking plan can create costs that show up later. Some municipalities require a temporary no-parking sign or a cone line for a long stretch of curb, and the fee depends on the city and on how long the spot is held. Ask the city's permit desk what applies to your street, then ask the roofer whether that fee is in the bid. If the roofer says the crew will rent a spot in a lot a few blocks away, ask who pays for it, how the crew gets from the lot to your house, and whether that travel time is in the schedule.

A parking ticket on a crew car is a separate question from the job price, and the bid should say who pays it if one is issued. A bid that names no one leaves that answer to chance. Ask for it in writing, along with the rest of the site rules.

Be cautious with any bid that adds a parking or staging line you did not expect. The line may be fair, but you need to see exactly what it buys before you compare totals.

What to ask each roofer

  1. Where will the crew's personal cars be parked on each day of the job, by address or by the exact stretch of curb?
  2. Will any car stand on the lawn, a neighbor's apron, a fire lane, near a hydrant or at a corner?
  3. How many personal vehicles do you expect on the street on a typical day, and do the crew members carpool?
  4. Which spot is reserved for the trailer, the dumpster and the delivery truck, and how do you keep personal cars out of it?
  5. If a car blocks a truck, who moves it, and how long does that take?
  6. Who takes a neighbor's call about parking, and what is that person's phone number?
  7. Does the parking plan change on a storm day, and who tells me when it does?
  8. Does any city desk require a permit, a cone or a sign for the spot you chose, and who handles that request?

Keep the answers in the same folder as the scope and the crew list. If one office gives different answers on two calls, log both and ask which one is the plan. If you want to speak with someone at Keys Roofing about this, the office number is (314) 220-2333.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection