Your Roof Calendar Can Slip a Week, So Ask Each Roofer What Moves
If your own schedule slips before tear-off, each roofer's written answer decides what moves, what it costs, and who confirms the new date.
A roof date is usually set weeks before anyone climbs a ladder, and the homeowner's own calendar keeps moving in the meantime. A visit from relatives, a delayed closing on a second property, or a medical appointment that runs long can all push the start by a few days. The question that matters is not whether your schedule will slip, because at some point it probably will. The question is what each roofer has written down about what happens next, because those answers differ more than most bids admit.
This page covers the stretch between signing a proposal and the crew's first load up the driveway. It explains what to put to each roofer, how to read the replies, and where a shift in your calendar can land on the price, the materials and the crew's time. Keys Roofing installs Atlas and Malarkey shingles, and the same questions apply to any roofer quoting a St. Louis home, whatever brand is on the pallet.
Roofer comparison
Start by asking each roofer the same plain question: if I need to move my start date by one week, what changes? Write down the answer in the roofer's own words. Some will say the date moves at no charge. Others will say the crew is booked, the shingles are on order, and the next open day is three weeks out. Both answers are useful, but they are not the same answer, and a comparison only works when the replies sit side by side.
Listen for three things in each reply. The first is whether the start moves at all, or whether the roofer holds the original date and asks you to pick a new one. The second is whether the shingle order is already placed, because an order that cannot be cancelled changes what a delay costs. The third is whether the roofer names a notice period. A reply such as "a few days is fine" is weaker than "we need five working days notice to move the crew, and we will confirm the new date in writing." The first leaves you guessing. The second gives you a number to compare.
Pay attention to where the schedule is held. Some roofers keep a standing crew on a fixed calendar, so a move may simply slide a job down the list. Others staff by job, so a move can mean a different crew entirely. Ask which one applies. If the answer is a different crew, ask whether the new crew has walked your roof, or whether the estimator's notes will be the only record they see.
Finally, compare how each roofer records the change. A moved start date should appear in writing with the old date, the new date and the reason, confirmed by email or text by someone who can make the change. A phone call that nobody writes down leaves you with two memories of one conversation. That is the same gap a homeowner runs into with any verbal promise on a roof, and the written version is the only one you can hold a roofer to later.
What it costs
Schedule changes cost money in a few places, and the bid should say where. The usual one is a restocking or holding charge on materials that were already ordered for your date. Shingles delivered to a driveway and then sent back often carry a fee, and some suppliers charge separately for a pallet that sat under a tarp for weeks. Ask each roofer whether a moved date triggers a charge, and if so, whether it is a flat amount or a percentage of the material line.
The second cost is crew time. If the roofer has to mobilize, unload and then wait, some bids bill a standby day. Others absorb it. Neither approach is wrong, but the difference should be written. Ask what a standby day costs on the bid and whether it appears as a separate line, because a single lump sum that includes "scheduling adjustments" is harder to check than one line with a rate.
The third cost is weather. A move that pushes your job from late October into December runs into shorter days, colder mornings, and a higher chance that the crew cannot nail when the deck is damp or the temperature drops below what the shingle maker allows. A roofer who says the price holds through a move may still have a cold-weather term buried in the terms. Ask for that term in writing before you agree that a move is free.
Keep an eye on the deposit as well. If you paid a deposit against a start date, ask whether it follows the job when the date moves, whether it is credited toward the final balance, and whether any part of it is kept if you cancel. Those questions belong in the same reply as the moved-date question, not in a separate conversation after the deposit has cleared.
What to ask
Use this list when you call each roofer. Put the answers side by side in one place, and mark any reply that is missing or vague. A blank answer is information too.
- If my start date moves by one week, do you hold the crew, and what notice do you need?
- Is my shingle order already placed, and can it be cancelled or held without a charge?
- What is the restocking or holding fee for materials delivered and then returned?
- Does a moved start date change the price, and where does that change appear in the bid?
- Will the same crew do the work, or will a different crew be assigned?
- What is the latest date after which the job moves into a season when you stop nailing?
- Who confirms the new date in writing, and how will I receive it?
- Where does my deposit sit if the start date changes or the job is cancelled?
Read each answer against the bid in your folder. If the reply says the date moves free but the bid lists a holding line, the two documents disagree, and you should ask which one governs. If the reply says the date moves but the crew is different, ask for the crew lead's name and whether that person has seen your house.
When you have the replies, decide which roofer can absorb a week of change without surprising you. That is usually the roofer who gave the clearest answer on the notice question, not the one with the lower number on the page. A low price that leaves the notice period blank is still an open question, and it should be treated that way until it is answered in writing.
If you have questions about a specific roof, the Keys Roofing office line is (314) 220-2333. Ask for the written version of any answer you get on the phone, so the reply sits in your folder next to the bid it describes.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.