
Your Permit Clock and Your Roof Clock Are Not the Same
Each roofer's permit filing date, and what it depends on, tells you more about a realistic St. Louis roof start than the date printed on the bid.
A roof start date looks like one date on a bid, but in St. Louis County it usually depends on two separate clocks. One is the calendar the roofer keeps for crews, shingle deliveries, and dry weather. The other is the permit clock, which runs at whichever municipal desk covers your address and does not move because a crew is ready. When these two clocks are not matched in writing, a homeowner can sign in September expecting a finished roof by October and then find the start pushed into the next month with no clear reason given.
This page is for the homeowner who has two or three written bids in hand and needs one specific fact before choosing: when does each roofer actually submit the permit application, and what does that submission depend on? The answer tells you more about the realistic start than the first date printed in the proposal.
Why the permit date is not the roof date
Many St. Louis County municipalities require a permit before tear-off begins on a residential reroof. The desk reviews the application, may ask for corrections, and then issues the permit. Inspections are booked at defined stages after that. Each step depends on the office's hours, its current workload, and whether the application arrived complete on the first pass. None of that depends on the roofer's crew calendar. A roofer who says the crew is free the week of the tenth may still be waiting on a permit that was filed on the sixth and sits in a queue.
The gap matters most when a homeowner has already booked time off, arranged a dumpster pickup, or asked a neighbor to move a car. If the bid treats the permit as a formality, the homeowner carries the risk of a date that moves after everyone has adjusted their week.
Questions that show where the wait sits
- Who files the permit application, the roofer or a permit service the roofer hires, and under whose name is it filed?
- On what date does the application go in, and does the roofer have a copy with a received stamp or a confirmation number from the office?
- What does the desk usually ask for that an application can lack, such as a dimensioned site sketch, a manufacturer product data sheet, or a load note for the deck?
- Which inspection stages does the bid assume, and who requests each one from the office?
- If the desk returns the application for a correction, who makes the correction, and how many days does the bid assume that round trip will take?
A roofer with a clear answer to each of these will usually have the filing date ready without looking for it. A roofer who answers with a general statement about how the permit process is handled has not told you where the delay would start.
Read the start line as a condition
A start date with no condition attached is a hope, not a commitment. A useful start line reads as a sequence: the homeowner signs, the permit is issued, materials are ordered, and the crew starts a stated number of working days after the permit is in hand. Each of those steps should have a date or a trigger, and the roofer should be able to say which one is currently waiting on someone else.
Compare that sequence across bids. If one roofer lists a specific calendar date and another lists a condition, the difference is not always a difference in speed. The first roofer may be assuming the permit is already filed, while the second is writing the date only after the desk has responded. Ask which one is true for each bid before you decide the difference is in the crew.
Where the cost moves with the wait
Permit fees are set by each jurisdiction, and they can be calculated from the job value rather than the shingle count. A bid should show whether the permit fee is a separate line or sits inside the labor and materials. If the fee is folded in, ask the roofer to show the number. A line that says permit included, with no figure, makes it hard to tell whether a re-filing will add cost later.
Ask also who pays a second filing fee if the desk rejects the first application for a missing sketch or an unclear product listing. Many bids say nothing about this. A written answer prevents the argument that starts when the invoice arrives after the desk has already returned the packet.
Winter filings and the freeze window
St. Louis winters add a second clock. An application filed in late fall can sit through a holiday week and a cold stretch, and the crew then has to wait for temperatures that allow shingle sealant to bond and crews to work safely on the roof. A bid filed in November for a start in January is not the same plan as one filed in March for a start in April, even if both show the same dates on paper.
If the start falls near freezing weather, ask the roofer whether the bid assumes a cold-weather hold and what happens to the open roof if a permit inspection is scheduled during a freeze. The answer should name the temperature or the weather rule the roofer will use, not just say that the crew will watch the forecast.
Put both clocks on one page
Ask each roofer for a written timeline before you pick a bid. The timeline should show the date the application was filed, the date the permit was issued or the date it is expected, the date materials are ordered, the start window for roof day, and the date the final inspection is requested. Put the three timelines side by side. Where a cell is blank or reads only as soon as possible, that roofer has left the permit clock unanswered.
If you want to check a specific filing date against the office that covers your address, keep the roofer's confirmation number and the office name in your file. Keys Roofing can be reached at (314) 220-2333 to ask for the filing date on the application it submitted for your address, so that the date you hold matches the date the desk shows.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.