Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Your Own Car Needs a Spot on Roof Day, So Ask Each Roofer Where It Goes

Compare each roofer's answer on where your car sits, how you get out of the drive, and who moves it, before the trailer arrives.

On roof day, the crew's trailer, the shingle pallet and the dumpster get most of the planning. Your own car usually gets none. It is already parked where it always sits, so nobody thinks to ask about it until the trailer needs the drive, the ladder needs the side yard, or loose debris starts landing on the hood. A short set of questions about your own vehicles, asked of every roofer on your list, will show you which bids have thought about the driveway and which have only thought about their trucks.

This matters most in older St. Louis neighborhoods, where drives are narrow, lots are close together, and a second car sometimes sits on the apron because the garage holds only one. A household with two cars, a work truck, a motorcycle or a boat trailer has more to settle than a household with one sedan in the garage. Each of those vehicles is a line on the roof day plan, whether or not the bid mentions it.

Roofer comparison

Start with the drive. Ask each roofer where the trailer will sit and whether that spot needs your car to be gone. Some drives fit one car and a trailer, and some fit only a trailer if the car is in the garage. Ask whether the answer changes from day to day or stays the same all week. A roofer who says the trailer parks at the curb has told you something, and a roofer who says it needs the drive should tell you which hours that is. Write both answers down exactly as spoken.

Next, ask about the drop zone. Tear-off debris falls on the ground below the eave, and a parked car is an easy target for loose nails, shingle tabs and granules that bounce off the staging. Ask each roofer whether the crew will tarp a car inside the drop zone or ask you to move it, and who makes that call on the day. You should not be the one who discovers, at four in the afternoon, that a car is in the fall line and nobody told the crew.

Then ask how the car gets out. A trailer parked across the apron can block a car that needs to leave for a shift before the crew starts. Ask each roofer what time the crew arrives and whether a car that must leave early can still get past the trailer. An answer given in hours is more useful than one that promises the crew will be considerate with no time attached.

Ask about the other vehicles too. A boat trailer or utility trailer parked at the side of the house can block the path the crew needs for the ladder. A motorcycle chained to the side gate can end up in the way of a tool bag. Ask each roofer to walk the property with you, or to name the spot where every vehicle on the lot will sit on roof day, and to write that spot on the plan.

Compare the replies side by side. A roofer who writes the drive plan onto the bid is making a different promise from one who answers by phone and never writes it down. If two roofers give you the same answer, the comparison is settled on that line. If they give you different answers, log both, and ask the one with the vaguer answer to put a specific plan in writing before you pick.

What it costs

Moving a car is rarely a line in a roof bid, and that is the reason to ask. If the plan is that your car goes to a neighbor's drive, a rented space or a garage you do not own, the cost sits somewhere: in the bid, in your own time, or in a fee that shows up after the job. Ask each roofer to say which of those applies. If the bid says nothing, ask whether the crew moves cars at all, and if so, whether that labor is included in the price or billed separately. Write the answer on the same sheet as the number so the two can be compared.

Ask also about your own time. If you have to take a morning off so the drive is clear, or arrange a ride so a car can leave early, that is a cost of the project even though no roofer will invoice it. Some homeowners find that one roofer's start window forces them to move a car twice in one week, while another roofer's window lets the car stay put. That difference belongs in the comparison, next to the price.

Ask who pays if a car is moved and something happens to it during the move. A roofer can usually say how the crew handles a moved vehicle, but the answer belongs in writing, not in a phone call. If a tow is needed, the tow bill is a separate cost, and the bid should name who orders the tow and who pays it. Call the office at (314) 220-2333 and ask the questions that apply to your drive before you book, so you know the answer before the trailer arrives.

What to ask

Put these questions to each roofer, in this order, and log the replies beside each other:

  1. Where will the trailer sit, and does it need the drive or the curb?
  2. Which hours of roof day does my car need to be off the drive?
  3. Is my car inside the drop zone, and who decides whether it gets covered or moved?
  4. If I need to leave before the crew arrives, how do I get out?
  5. Who moves a car if it has to move, and is that labor in the price?
  6. If a moved car gets a scratch or a dent, who pays, and where is that written?
  7. What happens if a car is still in the drive at the end of the day?

Pay attention to the replies that stay vague. "We will work it out on the day" describes a plan for the crew, not for you. A specific answer names the hours, the spot and the person responsible. A vague answer usually means the question has not come up before on that crew, which tells you what to expect on the first morning.

On the day itself, move the car yourself if you can. If the street is the only option, park only where parking is legal and check the posted signs before you leave the car. Do not leave keys in a car parked on the street, and do not count on the crew to check the car for you. If the garage door opener or a second set of keys is involved, decide in advance who has them and where they will be during the day.

Finally, put the vehicle plan in the same folder as the scope and the schedule. A car plan that lives only in a text thread disappears when the phone changes hands. A written plan with the hours, the spot and the name of the person responsible is the one you can hand to a neighbor, a family member or a crew lead when the trailer pulls up.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection