Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Your China Cabinet Needs a Move Plan, and Each Roofer Should Name Who Makes It

Glass cabinets and their contents can shift during tear-off, so compare how each roofer plans to protect and move them before the crew starts.

A glass china cabinet against a dining room wall is easy to forget on roof day, because the work happens above it and the cabinet sits in a room that looks untouched. Tear-off sends vibration through the framing, the crew walks the upstairs floor, and a cabinet full of stemware, plates and framed photos can rock, shift or lose a door if nobody planned for it. Many older houses across St. Louis County have plaster walls and freestanding display pieces that were never meant to be moved twice in one season. The question for each roofer is the same: who empties the cabinet, who moves it if it has to move, and what gets written down if something breaks.

Roofer comparison

Put the written bids or the written answers side by side before you decide anything. Some bids say nothing about interior furniture, and silence on the page leaves the question open. Ask each roofer whether the cabinet is inside the scope or outside it, and ask for the answer in writing, even if it is a single line. A roofer who has run tear-offs on older homes will usually answer in steps rather than in promises, and steps are what you can compare.

Split the answer into three parts. The first is the empty-out step: who clears the shelves of glass and fragile items, when that happens, and where the items go. The second is the move step: whether the cabinet comes off the wall, how many people that takes, and whether the crew uses a dolly or a strap. The third is the damage step: what the crew records if a door comes off its hinges, a shelf cracks or a corner chips, and whether a photo is taken before anyone touches the piece.

A roofer who answers all three parts without hedging has usually thought about the room. A roofer who answers only the first part, or who says the crew will be careful, has left the other two parts to you. Neither answer is a verdict on the roofer's work on the roof itself, but the gap is a fact you can weigh.

Keys Roofing puts a written scope with photos and measurements in the homeowner's hands, so whatever interior line the bid carries will appear on the page you keep. If you want the conversation before you sign, the office number is (314) 220-2333.

Before the crew arrives

Photograph the room before anyone else is in it. Stand in the doorway, take the cabinet front on, then take the wall behind it from two angles. Open each door and photograph the shelves and the back panel. Note the date on the file. This is the kind of record that is cheap to make on an ordinary weekday and hard to reconstruct later, and it is useful whether the roof goes smoothly or not.

Plaster that already has hairline cracks may show them after a long day of foot traffic overhead, especially where a cabinet has sat against the same wall for decades. Photograph the wall, not only the cabinet, so that a crack that appears during the job can be compared with one that was there before. Ask the roofer how the crew will move through the upstairs hall and whether any ceiling below the work will be covered.

Summer heat in St. Louis adds one more detail. If the crew works through a hot afternoon with the windows open, dust from the tear-off can settle on the glass fronts. Ask whether the cabinet is covered at the end of each workday, and whether the crew will close the windows near it before they leave. That is not a reason to refuse the job. It is a reason to put the answer on paper.

What it costs

A cabinet move is often a labor line rather than a materials line, so it can hide inside a broader labor figure. Ask whether interior protection appears as its own item. If a bid says interior protection is included, ask what that phrase covers. Drop cloths and plastic sheeting are one thing. A second person to lift a glass-fronted case, or a dolly rented for the day, is another. Those costs belong in the number you compare.

Watch the difference between a figure and a promise. A flat amount for moving furniture is simple to read, but ask what happens if the cabinet is heavier than the estimate assumed, or if the crew has to empty it twice because the roof opens in two stages. A stated hours estimate or a unit rate lets you compare two bids on the same footing. A verbal assurance that the crew will be careful does not give you anything to compare.

If you decide to empty and move the cabinet yourself, put that decision in writing too. Note which items you will take out, and tell the roofer what time the shelves will be clear. A delay on the homeowner's side can push the crew's schedule, and that shows up later as an added charge if nobody wrote the timing down.

What to ask

  • Is the china cabinet inside the scope, and is that stated in writing?
  • Who empties the shelves, and where do the glass, china and framed photos go?
  • Does the crew pull the cabinet off the wall, and how many people does that take?
  • Is a tall cabinet anchored or strapped while it is moved?
  • Who watches the emptied items while the roof is open?
  • What gets photographed before the crew touches the cabinet, and who keeps the file?
  • If a door or shelf breaks, what is written down that same day?
  • Is the cabinet covered at the end of each workday?

Ask each roofer the same list in the same order, and write down the answers as they come. If one roofer answers in full and another answers in part, the difference tells you how far the work has been planned. Ask for the answers to appear in the written scope, not only in the phone call.

If plaster repairs turn out to be needed after the job, they are a separate line and should be quoted before the crew reaches the wall.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection