Who Signs for the Shingle Truck at Your Door
Compare how each roofer handles the delivery ticket, the bundle count and the signed copy before the shingles reach your driveway.
A shingle delivery usually arrives before the crew does, on a flatbed or box truck, and the driver often wants a signature on a delivery ticket before the pallets come off. That signature is the first written record of what reached your property. It shows the count, the color, the bundle wrap details and the date. Most homeowners sign without reading the ticket, and then the crew reports a short count or a wrong shade a week later with nothing to point back to. This page is for the homeowner partway through choosing a roofer who wants to know how each bid handles the moment the shingles touch the driveway.
Why the delivery ticket matters more than the bid
A bid lists the number of squares and the product line. A delivery ticket lists what physically arrived. Those two documents are supposed to agree, and when they do not, the difference lands on your driveway, lawn or garage. Ask each roofer who signs the ticket on the day of delivery. Some companies have the crew lead sign, some have the supplier's driver leave the ticket in a plastic sleeve, and some expect the homeowner to be home. None of these is wrong on its own, but each one leaves a different paper trail.
Keys installs Atlas and Malarkey shingles only. A homeowner comparing Keys with another bid should look for the same things on each delivery ticket: the manufacturer name, the product line, the color name, the number of bundles, and the plant or lot code printed on the wrapper. If a competing bid names a different manufacturer in the scope than the one on the ticket, that mismatch is the first question to ask, before the crew starts.
What to check at the truck
- The bundle count against the number of squares in the written scope, with the waste allowance stated on the bid
- The color name on each bundle wrapper against the color named in the contract
- The product line and the lot or plant code, which the record in the closeout packet should match
- Any bundles that arrive wet, creased or with torn wrap, noted on the ticket before the signature
- The date and time of arrival, written on the ticket by the person who signed
Shingle bundles are heavy, and a pallet holds enough that a short count is hard to see by eye. Counting bundles on a pallet is slow, and most drivers will not wait for it. Ask each roofer whether the crew counts at the truck or counts later on the roof. A count on the roof means the discrepancy surfaces mid-job, when the crew may already have cut into the next slope.
Who signs, and who keeps the copy
The signature line on a delivery ticket is easy to treat as a formality. It is not. Whoever signs accepts the load on behalf of the property owner or the roofer, depending on how the bid is written. Compare the three common arrangements. In the first, the roofer's crew lead signs and keeps the copy, and the homeowner gets a photo or a copy later. In the second, the homeowner signs and keeps the original. In the third, the supplier's driver leaves the ticket with no signature at all, and the roofer reconciles it afterward. The third arrangement gives the homeowner the least evidence.
The ticket also tells you whether the order matches the roof. If the ticket shows fewer bundles than the squares require, the gap is either a short order or a waste allowance that was never stated. Ask each roofer to show the waste factor used in the bid, because it sets the bundle count that should appear on the ticket. A bid that adds a waste percentage without saying so makes the ticket look short when it is not, or makes the count look right when the roof will still run out.
Ask each roofer for a copy of the signed ticket within a set number of days, and write that expectation into the job file. A roofer who answers this question without hesitation has probably done it before. A roofer who says the paperwork goes in the office folder is telling you the homeowner will not see it unless they ask.
Where the bundles wait, and who checks them
The delivery question is tied to storage. Shingles left in direct sun, rain or freezing temperatures can stick together or crack at the tab cut, and St. Louis weather swings enough that a pallet can spend a cold night on a driveway. Ask each roofer where the bundles will sit between the truck and the roof, and whether anyone checks the wrap before the crew starts. A bid that says the shingles will stay on the pallet under a cover until the crew needs them is describing a plan. A bid that says nothing is describing a gap.
Keys documents damage, puts a written scope with photos and measurements in the homeowner's hands, and attends as the contractor while the homeowner deals with their own insurer. Delivery damage is a separate matter from storm damage, and a roofer should not blur the two. If bundles arrive damaged, the ticket should say so on the day, the photos should go in the file with a date, and the roofer should state in writing how the replacement is ordered and who pays for the freight. A homeowner who has that record in hand can compare the answer across bids without relying on memory.
What Missouri does and does not settle
Missouri does not license roofers at the state level, so a delivery dispute is not something a state board will sort out. It is a contract matter between the homeowner and the roofer, and the written bid is the document that decides it. Missouri law bars a roofing contractor from representing or negotiating a homeowner's insurance claim, and a roofer may not say anything about paying, waiving or covering a deductible. That bar does not touch a delivery ticket, but a roofer who offers to handle the insurer side of a shingle problem is overstepping. Read the bid for who handles which step, and keep the two conversations apart.
Questions to put to each roofer before the truck arrives
- Who signs the delivery ticket, and who keeps the signed original?
- Does the crew count bundles at the truck or on the roof?
- Which manufacturer, product line and color name will appear on the ticket, and do they match the contract?
- Where do the bundles wait, and is the pallet covered if rain or frost is forecast?
- What is written on the ticket if a bundle arrives torn, wet or in the wrong shade?
- How many days after delivery will you send me a copy of the signed ticket?
Write each answer down in the same words the roofer uses. A roofer who answers all six in writing before the truck arrives has given you a clean comparison point. A roofer who answers the first two out loud and leaves the rest for the day of delivery has given you a different kind of answer, and you should weigh it that way when the bids sit side by side. If you want the Keys answers in writing, call the office at (314) 220-2333 and ask for the delivery terms to be attached to the written scope before you sign.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.