
Who Shifts a Backyard Skate Ramp Before the Trailer Lands?
A backyard skate ramp is heavy plywood and steel, so compare who moves it, where it waits, and who pays if it cracks.
A backyard skate ramp is the kind of item homeowners forget until a roof trailer is backing up the drive. A typical home ramp is plywood over a wood frame, sometimes with a steel coping rail or a sheet metal lip, and a full-size bowl can weigh far more than one person can lift. If the ramp stands in the side yard or along the fence where the crew needs to walk or stage materials, the question is not whether it moves. The question is who moves it, when, and who pays if a panel cracks or a rail bends.
This page is for a homeowner who has two or three written bids in hand and needs one specific fact to decide. Keys Roofing is the contractor behind Best Roofers STL, and the office line is (314) 220-2333. The questions below are the ones that separate a bid that has thought about your yard from one that has not.
Roofer comparison
Start by asking each roofer the same question in the same words: who physically moves the ramp off the staging path, and does that move appear anywhere on the written scope? Some bids name the crew. Some say the homeowner moves items out of the work area. Some say nothing at all. A blank answer is still an answer, and it usually means the ramp will be moved by whoever is standing closest on the morning the trailer arrives.
Then ask about timing. A ramp moved the day before tear-off is one thing. A ramp moved on the morning of tear-off, with the crew waiting at the gate, is another. Each roofer should say which day they will move it, the hour they expect the path to be clear, and whether they will send a text the night before. Compare those three answers side by side. If one bid says the day before and another says on arrival, you are not comparing the same job.
Ask where the ramp waits while the roof is open. Plywood left on the lawn through a wet week can warp, and a bowl set on soft St. Louis clay can sink at one end. A better answer names a dry, flat spot, such as the patio or the driveway apron, and says who sets down any blocking or pads. Ask whether the crew will use a dolly or hand carry the sections, and whether they will bring a second person for the lift. A crew that plans for two people on a ramp section is describing the work they actually do.
Ask whether the crew will move the ramp once or twice. Some roofers need the ramp off the fence line for scaffolding, then back on the lawn for the dumpster. Each extra move is another chance for a split seam or a bent coping, so ask each roofer to count the moves they expect and to write that number into the scope.
What it costs
Moving a ramp is a labor line, and it may or may not be inside the bid price. Some roofers fold it into general site prep. Others list it as an add-on with an hourly rate or a flat fee. Ask each roofer to show you that line in writing. If the answer is that it is included, ask which page of the scope it appears on. A roofer who can point to the line is easier to hold to it later.
Damage is the bigger cost question. Plywood ramps split at the seams when they are dragged over gravel or pulled over a curb. Steel copings bend. Concrete bowls chip at the lip. Ask each roofer who pays for repairs if the crew damages the ramp while moving it, and whether that payment falls under the roofer's general liability policy or under a separate agreement. Ask them to name the carrier or the policy type in writing rather than saying the company is insured. A sentence that names a document you can request is worth more than a sentence about reputation.
Then compare the cost of your own time. If you have to move the ramp yourself, you will need a helper for anything heavier than a single section, and you will need an afternoon before the trailer arrives. Put that time on your own list, not in the roofer's bid, so you can see how much each quote leaves on your plate. Two bids with the same price can ask very different things of your Saturday.
Freeze and thaw matters here too. A ramp that is moved in late fall may sit on wet ground for weeks if the roof work slips into a cold snap. Ask each roofer what they will do if the start date moves and the ramp is still in the wrong place. The answer tells you whether the bid has a plan for delay or only a plan for the best case.
What to ask
Ask each roofer these questions and write the answers down under the roofer's name:
- Who lifts the ramp, how many people will be on the lift, and do they have a dolly or a ramp cart?
- What day and hour does the ramp need to be clear, and will you confirm that by text or email?
- Where does the ramp wait while the roof is open, and what surface is it set on?
- If a panel, rail or coping is damaged in the move, who pays, and what document says so?
- Is the move included in the price, or listed as a separate line?
- How many times will the ramp be moved, and does the scope show each move?
- Does the crew also need the fence line, the side gate path or the back patio cleared?
Read the answers back to each roofer in your own words and ask them to confirm. A roofer who says yes to a sentence you wrote is a stronger comparison point than one who gives a long reply you cannot check. If one roofer's answer changes between the first call and the second visit, log both versions and ask which one goes on the contract.
Walk the yard before you sign
Walk the yard with the roofer before you sign. Show them where the ramp sits, where the gate opens, and where the trailer can turn. Ask them to mark the ramp's new spot on the site sketch, and check that the sketch matches the bid. Concrete and asphalt in the St. Louis area heave after a hard freeze and thaw, so a spot that was flat in October may not be flat in March. Ask each roofer whether they will check the surface on the day of the move, and what they will do if it has shifted.
If the ramp is attached to the deck, a rail or the fence with fasteners, ask who removes them and who keeps them. A roofer who says the crew will take the ramp apart should also say who reassembles it, whether the reassembly is priced, and whether the screws go into a labeled bag. Small hardware left on a lawn is easy to lose, and a missing bolt can keep a ramp from standing up again.
What a clean answer looks like
A clean answer names a person, a day, a surface and a cost line. It says who pays for damage and points to a document. It does not say we will take care of it, because that phrase does not tell you who will be standing in your yard holding the plywood. Two or three roofers who answer that way make the comparison easy. One who answers with a shrug tells you the ramp will be moved by chance.
Once the answers are in writing, put them in the same folder as the scope and the photo log. When the crew arrives, the ramp question should already be settled on paper, and the only thing left to do is move the ramp to the patio and let the roofers work.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.