Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Who Restores Your Attic Insulation After Tear-Off

Compare how each roofer answers who puts the attic insulation back after tear-off, and get the answer in writing before you sign.

When a roof comes off, the attic under it stops being sealed from the weather for as long as the crew is working. Tear-off dust, grit, and nail debris fall between the joists, and the crew often has to step on or move the insulation on the ceiling plane to reach the rafters, the deck edges, and the vent openings. Most homeowners never think about this until the bid is signed and the first walk is over. By then, the question of who puts the insulation back has either been answered in writing or it has not.

Why the insulation belongs in the roof bid

The roof bid is the document that tells you what the job covers. Insulation is not part of the roof covering, so many bids skip it entirely. The line that matters is not only whether insulation gets disturbed but what happens to it while the job runs. In St. Louis, attics go through hard freezes in January and hot, humid stretches in July, and the insulation layer is what keeps the heated air of the house below from escaping into the cold space above the ceiling. Compressed or wet insulation loses that function. A bid that is silent on it leaves you to find out how the crew handled it after the work is finished.

Four answers to compare

Put these four questions to each roofer and write the answers down word for word. The replies usually show whether the crew has thought about the attic or only about the shingles.

  1. Which areas get walked on? Ask whether the crew will lay boards across the joists, stay on the ceiling framing, or step directly on the insulation. Boards spread the weight and keep batts from compressing. A roofer who says the crew will be careful has not answered the question.
  2. Who vacuums or cleans the dust off the insulation? Tear-off grit settles into blown-in insulation and into the fibers of batts. Find out whether cleaning is in the bid, whether it is a separate charge, and who does it before the attic hatch is closed.
  3. Who puts the vent baffles back? Baffles hold the insulation off the roof deck at the eave so air can move from the soffit into the attic. If the tear-off knocks them out and nobody replaces them, the attic can run hot in summer and collect condensation in winter.
  4. What happens to insulation that gets wet or pushed out of place? Ask how the crew handles a section that is soaked, torn, or displaced, and whether replacement is priced per square foot or as a flat line.

What to ask each roofer

The four answers above are the core. These follow-up questions make those answers usable once the crew is on your roof.

  • Will the bid list the attic insulation as its own line, or will it say nothing about it?
  • Is the attic hatch closed and covered at the end of each workday?
  • Who inspects the attic before the crew leaves the roof for the night?
  • Will the crew take dated photos of the attic floor before the first board is lifted, and again when the job ends?
  • If insulation has to be replaced, does the bid name the type and the depth?
  • Who signs off that the attic was returned to its prior condition before the final payment is due?

Reading the price line

A bid may show insulation work as a separate line, as a note saying it is included, or not at all. The third is the most common and the one to press on. Silence does not mean the work is free. It means the answer is missing. Ask the roofer to write into the scope either that insulation work is included with a stated extent, or that it is excluded and who would handle it. An exclusion is not a bad answer if it is written down, because you can then get a separate quote from a contractor who does insulation work.

Compare the lines across bids side by side. If one roofer prices baffles and cleanup and the other does not, the lower total may simply leave those items out. Put each bid on the same sheet and mark where insulation is mentioned, where it is priced, and where it is excluded. The differences will show up quickly.

If water reaches the attic during the job

Rain can reach the attic when a section of deck is open at the end of a workday. If that happens, photograph the insulation and the wet areas with a dated phone or camera before anything is moved or dried. Ask the roofer to write down what was wet, where it was, and what was done about it that day. Missouri law bars a roofing contractor from representing or negotiating a homeowner's insurance claim, and from saying anything about paying, waiving or covering a deductible, so any question about whether the water damage is covered belongs with you and your own insurer. A roofer's written note of the conditions on that day is still useful to bring into that conversation.

Get the answer before the crew arrives

Insulation questions are easy to ask before the contract is signed and hard to ask once the crew has the hatch open. Send each roofer the four questions above in writing and note how long the reply takes. A clear, specific reply that names the boards, the baffles, the cleanup and the wet-section rule is a good sign. A reply that says the crew will take care of the attic is not an answer, and it is worth a follow-up call. The office number is (314) 220-2333, and the written scope with photos and measurements is the document to hold each roofer to.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection