
Who Cleans the Crew's Paint Marks Off Your Siding?
Compare each roofer's answer on who removes the paint marks, chalk spots and sealant the crew leaves on your siding, stone and trim.
Roof day leaves marks you can see from the sidewalk. Chalk lines get snapped onto fascia and soffit, a crew member may spray a dot of paint on a stone sill or a brick course to mark a fastener line, and sealant gets smeared onto siding where a flashing meets the wall. None of this affects the roof, but it lands on the house you live in after the trucks leave. Many roof bids never say who removes it, what product gets used, or whether the cleanup is included in the price.
Roofer comparison
Put the same question to each roofer in the same words: when your crew leaves paint, chalk or sealant on siding, stone, brick, trim, a garage door or a window frame, who removes it, with what product, and at whose cost? Then ask whether that answer appears in the written scope. A roofer who says the crew cleans up as it goes should be able to point to a line in the proposal that says so. A roofer who says it is no big deal should still write down what clean up means, because the two of you may picture very different results.
The surfaces matter. Chalk brushed off a painted fascia usually leaves nothing behind, but chalk left wet on porous brick or limestone can stain, and it stains more when the spring is wet. Spray paint marking dots are harder. Many older St. Louis houses have limestone sills, stone veneer and painted wood trim, and paint that sits through a wet week can bond to the surface. Ask each roofer which product the crew uses for marking, and whether that product is safe on the materials at your address. A roofer who does not know the product name has not thought about the question yet.
Sealant is a separate problem. Roof cement and caulk used at a flashing can smear across siding or onto a painted fascia board. The fix is usually a solvent or a scrape with a plastic blade, and the bid should say which one the crew will use and who checks the result before the crew leaves the lot. Ask whether the crew lead walks the wall with you at the end of the day, and whether that walk is written into the schedule or left to chance.
Keys Roofing puts a written scope with photos and measurements in the homeowner's hands, so you can record the state of your siding and trim before the crew arrives. That photo set is the baseline you will compare against once the job is done, and it is worth making before anyone snaps a chalk line.
What it costs
Cleanup of chalk and light marks is often folded into labor, which means the bid should not show it as a separate charge. Stain removal, pressure washing or a repaint of a damaged trim board is different work, and it usually carries its own line. When you compare totals, check whether each roofer has priced the cleanup, has left it out, or has priced a repaint as an open item. A bid that leaves paint marks out entirely is not cheaper. It has moved the cost to you, and you will find it after the crew has gone.
Ask each roofer what happens if a mark is still visible at the final walk. A written answer should name who books the follow-up visit, how long you have to report the mark, and whether the fix is covered by the job or is a new charge. Some roofers will say they will return at no charge within a set number of days. Others will say they will quote it separately. Both answers can be fine, but only the written one is something you can hold them to.
Do not let the cleanup question change the roof price in your head. Cleanup is a small line that matters for two reasons: it shows whether the roofer has thought about the whole house, and it decides whether the house looks the same when the job ends.
What to ask
Put these questions to each roofer before you sign, and save the answers in writing:
- Which surfaces around the roof will the crew mark, and with what product?
- Which of those marks are removed by the crew before it leaves each day, and which wait until the final walk?
- What solvent or cleaner is used on sealant that reaches siding, stone or painted trim?
- Is cleanup inside the labor line, or is it a separate charge?
- Who walks the house with me at the end of the job, and what do we check together?
- If a mark or stain shows up after the crew leaves, how do I report it, by when, and who books the return visit?
- Does the written scope name every surface that will be touched, including stone sills, brick courses and the garage door trim?
Listen for specifics. A roofer who names a product, a time of day and a person has thought about the job. A roofer who says it will be taken care of has not yet answered the question. Write down the reply, and compare the replies side by side the same way you compare shingle lines and totals.
Before the first chalk line goes down, walk the outside of the house with your phone and photograph the siding, stone, brick and trim on each side. Include close-ups of any stone that has been painted or sealed before, because those surfaces react differently. Give the photos to the roofer and ask them to confirm, in writing, that the crew will work from them. If you want to put these questions to Keys Roofing directly, the office number is (314) 220-2333.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.