Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Who Books the City Inspection, and Who the City Calls Back

Compare how each roofer answers who books the city inspection, who the inspector calls, and who returns when an item fails.

When a roof job needs a permit, someone has to schedule the inspection, and someone has to answer the phone when the inspector calls back with a question or a failed item. On a reroof in St. Louis, that person is often not the homeowner. Two roofers can quote the same shingle and the same square count and still leave you with different jobs on inspection day, depending on who they name as the contact and who actually books the slot.

This page is for the stage after you have narrowed the list and before you sign. The question is simple: when the permit desk needs a yes, who gives it, and how fast can that person be reached?

Why the booking name matters

Permit desks in St. Louis County and the cities around it run their own calendars. Some take inspection requests online, some by phone, and some want the permit number and the applicant's name read back before they confirm a time. The name on the permit is the name the desk recognizes. If that name belongs to a person who does not work the job, the inspection can sit unscheduled while the crew is standing on a finished deck waiting for a sign-off.

Missouri does not license roofers at the state level, so there is no state registry that will tell you who is responsible for the permit paperwork. The local permit desk is where that gets settled, and each roofer's answer tells you how they run it.

What to ask each roofer

Put the same questions to every roofer, in writing, and keep the answers side by side. Ask them in this order:

  • Who will be listed as the permit applicant, and is that person employed by your company or by a contractor you use?
  • Who books the inspection with the city or county, and by what method?
  • Which phone number will the inspector call, and who answers it on a job day?
  • If the inspector fails an item, who returns to fix it, and how many days does that usually take?
  • Who meets the inspector on site, and does the crew lead stay on the roof until the visit ends?
  • Where does the permit card hang while the work is open, and who removes it after the final sign-off?

Each answer should name a role and a method, not only a first name. "Our office handles it" is not an answer until the office has a name, a number, and a way to be reached on a Saturday when a crew has a question about a valley.

What a useful answer sounds like

A useful answer is specific. It names the person who holds the permit, gives the number that person can be reached on during the job, and says what happens when the desk calls back about a failed item. It also says how the homeowner hears about it. Some roofers text the homeowner after each inspection, some send a copy of the desk's written result, and some say nothing unless asked. Ask which one applies.

Watch for the answer that depends on the homeowner. A roofer who says you will need to call the city yourself is not necessarily wrong, since some desks only take calls from the property owner. But that should be written into the schedule so the inspection is not missed while the crew is standing ready. If the permit is pulled in the owner's name, say so on the contract, and say who will be on site to answer the inspector's questions about the work.

Office hours matter here too. A permit desk may close in the middle of the afternoon, and a roofer whose office is closed by then cannot answer a question the inspector raises. Ask what time the office closes and who covers the phone after that. For Keys Roofing, the office number is (314) 220-2333, and that is the number to put on your comparison sheet next to each other roofer's contact.

What it costs when nobody books

The cost of an unbooked inspection is usually time. The crew may be paid for a day that ends early, the tear-off may stay open over a weekend, and the open roof is exposed to whatever the weather brings. Rain and wind are the usual reasons an open roof gets pushed around, and a missed inspection can turn one open day into three or four. A roofer who has thought about this will have a line in the proposal about how a rescheduled inspection affects the start date, and will not leave that to be settled on the day.

Ask each roofer what they charge if the crew has to return for a second visit because the inspection was not booked. Some roofers include the return trip in the price, and some bill it separately. Neither answer is wrong by itself, but the difference belongs in the comparison.

Putting the answers side by side

Once you have each roofer's answers, lay them out in one table. Put the permit applicant, the booking method, the reachable number, the failed-item process, and the return-trip charge in separate rows. Blank cells are information. A roofer who cannot fill in the applicant row before the contract is signed is telling you something about how the permit will be handled.

If two roofers are close on price and scope, the one who names a specific person, a specific number, and a specific booking method has made the job easier to run. That difference is what this page is about, and it is easy to check before you sign.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection