Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Where a Missouri Roofing Dispute Goes When Talks Stall

A stalled roofing contract in St. Louis runs on dated paperwork, so start with the record, then the notice clause, then the office that takes complaints.

A roofing contract that stops moving is usually a paperwork problem before it is a legal one. The start date slips, a text goes unanswered, and the homeowner is left holding a deposit and a half-torn roof. Before you call anyone, gather what you already have in writing. A stronger position in any Missouri roofing dispute comes from a dated record of what each side promised.

Start with the written record

Pull the signed contract, the written scope, the estimate and any change orders, then put them in date order. Add every email and text where a start date, a material choice or a price was discussed. If a crew member said something on the phone, write a short note the same day listing the date, the time, the person and what was said. A note written that day carries more weight than a memory assembled a month later.

Check the contract for the parts that decide what happens next: the start and completion dates, the payment schedule, the notice clause that says how formal written notice must be sent, and any clause naming a place where disputes are heard. Many contracts ask for notice by mail to a stated address. Sending a casual email when the contract requires certified mail can weaken a position that would otherwise hold up.

What Missouri does and does not regulate

Missouri does not license roofers. There is no state roofing license to look up and no state board that certifies roofing crews, so a roofer's registration with a county or city is not the same as a state credential. The question of who is qualified to do the work is answered by the contract, the references and the work itself, which is why the comparison pages on this site keep returning to the written scope.

Consumer complaints about home repair work in Missouri can be brought to the Missouri Attorney General's office, which enforces the Missouri Merchandising Practices Act. That statute covers unfair and deceptive practices in trade, and a complaint is a reasonable step when a contractor takes money and does not deliver what was sold in writing. The Attorney General's office does not act as a private lawyer for one homeowner, so a complaint should be paired with a clear written demand and, if the amount is large enough, advice from an attorney who handles contract disputes.

Roofing contractors in Missouri are barred by RSMo 407.725 from representing or negotiating a homeowner's insurance claim, and they may not say anything about paying, waiving or covering a deductible. If a dispute involves an insurer, that conversation belongs between the homeowner and the insurer. A contractor can document damage, provide a written scope with photos and measurements, and attend the adjuster visit as the contractor, but the claim itself stays with the policyholder.

Two federal rules can matter for a dispute that starts with a door-to-door sale. The FTC Cooling-Off Rule gives buyers three business days to cancel many sales made at the buyer's home, and the seller must give written notice of that right. If your contract was signed at your kitchen table and the cancellation window is still open, read the notice in the packet before you assume the deal is final.

Where a stalled contract usually breaks

Many stalled roofing jobs break in one of three places. The first is the start date, which may never have been written as a firm date at all, only as a season or a "when weather allows." The second is the payment schedule, where a deposit has gone out but no milestone has been tied to a finished step. The third is the crew itself, where the people who showed up to measure are not the people scheduled to install.

Each break leaves a different record. A missing start date is shown by the contract's own language and by the emails asking about it. A payment problem is shown by the bank record and the schedule the two parties signed. A crew change is shown by the sign-in sheet, the photo log, or the names on the permit card if the job pulled one. Keep copies of all three, because the other side will often remember the terms more kindly than they were written.

Roofer comparison: holding a current contractor to the same standard

When a roofer is still on the job but slow, compare the response against the answers that roofer gave before you signed. A contractor who promised a written daily contact and then stopped answering has changed the terms. A contractor who said the crew would return within a set number of days and then missed that window has given you a dated fact. Those facts separate a frustrating job from a dispute that a county, the Attorney General or a court can actually weigh.

Ask the same questions of each roofer you are weighing against the current one. Who sets the start date and who can move it? Who signs a change order? Who pays if the crew breaks something? If the current roofer answers vaguely and a second roofer answers in writing, that gap is useful information when you decide whether to finish with the first.

What it costs to wait

Waiting is not free in St. Louis. An open roof has a clock on it. Rain, a freeze-thaw cycle, or a hailstorm can turn a delayed start into water in the attic, and the delay can cost a homeowner more than the dispute is worth. Ask the current roofer for a written plan to close the roof if the job stops, and ask who pays for the tarp, the dry-in and any interior damage that follows. If the answer is not in writing, treat that silence as part of the record.

The cost of a complaint is mostly time. A written demand, a letter sent by the method the contract requires, and a dated log of replies can take a few hours to prepare. Filing with a state office is usually free. An attorney's fee depends on the amount at stake, and a lawyer will often ask for the same binder you should build before you call anyone.

What to ask before a dispute starts

  • Which written document sets the start date, and does it name a day or only a season?
  • Who on your crew is responsible for the job if the foreman is not on site, and how do you reach that person?
  • What is the notice address in the contract, and does it require certified mail?
  • Which milestone does each payment match, and has any payment gone out ahead of a finished step?
  • If the job stops, what closes the roof, and who pays for the tarp and any water damage that follows?
  • Where does the contract say disputes are heard, and does that place match where you live?

If you want Keys Roofing's answer to any of these questions, send the question in writing and keep the reply. The office number is (314) 220-2333.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection