When Your Roof Bid Stops Being a Bid
Each roof bid has an expiry date worded differently, so get each roofer's date and shingle ship date before you compare the prices.
A roof bid looks like a fixed number on the page, but many of them carry a clock that is written somewhere in the small print or not written at all. A bid with a valid-through date, a price that depends on when shingles are ordered, and a start window that depends on the crew calendar can be three different documents under one total. If you are comparing two or three St. Louis roofers this fall, the question is not only which number is lower. It is how long that number will still hold once the shingles are on the truck.
Roofer comparison
Start by pulling each bid and reading only the dates. Look for a line that says "valid through," "good until," or "expires." Some roofers print it in the header, some in the footer, and some write it into the terms. If the date is missing, that is an answer too. Write down exactly what the bid says, including the wording, because a bid that says the price is good for thirty days and a bid that says it is good for thirty days from the signing are not offering the same thing.
Next, find the line about materials. Keys installs Atlas and Malarkey shingles only, so a bid from us will name one of those lines. Other roofers may name a product line, a color, or a generic class of shingle. The more specific the product named, the easier it is to tell whether a later price change belongs to the same shingle. A bid that says "architectural shingle" with no maker and no product line leaves the comparison open on day one.
Then compare the two dates side by side. The first is when the bid expires. The second is when the shingle order is expected to ship or when the material is expected on your lot. In a normal fall, a large shingle order can take a week or more to fill, and in a busy spring the gap is wider. If your bid expires before the shingles are ordered, the roofer may have to re-price, and the new number could be higher. If the shingles ship before your bid expires, a later delay in your start date is a scheduling issue, not a pricing one.
St. Louis weather makes the gap matter more than it does in drier places. A bid written in late October for a job that starts in February will sit through a freeze-thaw season, and the crew may not be able to nail until the deck is dry and the temperature holds above the minimum on the shingle label. A bid that holds its price only through a short window can force a re-quote just as the weather finally cooperates.
What it costs
The price in a roof bid usually moves for one of four reasons: the shingle price changes, the square count changes after a measurement check, the scope changes after a tear-off finds something new, or the bid simply expires and the roofer re-prices from current numbers. Only the first and the last are about the calendar. The other two come from the roof itself, and a clear bid will say which items are fixed and which are allowances.
When you compare totals, do not subtract anything yet. Put each roofer's price per square next to the total, then check whether the bid has an escalation clause. Some roofers write a clause that lets the price rise if material costs go up before the shipment date. Others write a fixed price and absorb the difference. Neither approach is wrong, but two bids with matching totals on the first page are not the same number until you know which approach each one uses.
Ask each roofer what the expiry date would cost you. If your bid lapses in thirty days and the roofer's usual lead time to ship is four weeks, you may be asked to sign again at a new price or to accept an updated bid after the crew has already been booked. Write down the answer in a sentence, such as "If we sign after the date, the price becomes X, and the start date moves to Y." A roofer who gives you that sentence has priced the risk. A roofer who only says the price is good until the date is leaving the risk with you.
Keep the deposit separate in your head. A deposit paid early can lock the shingles, but it does not lock the labor rate or the weather window. Ask whether the deposit is refundable if the bid lapses before the work starts, and whether it is applied to the first material delivery or to the final invoice. These are money questions, and every roofer should answer them the same way in writing.
What to ask
Send each roofer the same three questions in writing and time the reply. Keep the questions short so the answers can be compared line by line.
- What is the exact date this bid expires, and what wording controls it?
- When will the shingles be ordered, and when are they expected on my lot?
- If my signature comes after the expiry date, what changes in the price and the start window?
If a roofer answers the first question with "about a month" or "it depends," ask for the calendar date. A bid is a dated document. If the roofer cannot put a day on it, ask who in the office sets the date and whether that person will confirm it by email. Keep the reply in the same folder as the bid so the two cannot drift apart.
Ask the second question with a specific supplier in mind. Some roofers order through a single supply counter, and others use a regional branch. A counter that closes early or runs short on a color can add a week to the schedule without changing the price. You do not need the supplier's name for the comparison, but you should hear a plan that explains how the materials will reach the house and when.
Ask the third question as a what-if. The point is to hear the roofer say, in plain words, what happens to the price and the calendar if you wait. A roofer who answers in terms of the bid itself, such as "we will re-issue it at current pricing," has named the mechanism. A roofer who says "we will work it out" has not.
Last, compare the replies with the bids. If one roofer's written answer contradicts its bid, note both and ask for the correction in writing before you choose. A corrected page is cleaner than a verbal promise, and you will be able to point to it later if the start date moves. If you want to ask Keys Roofing these three questions directly, call the office at (314) 220-2333 and keep the answers with the bid so the dates stay in the same file.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.