Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

When You Know the Trade, Ask Each Roofer the Same Hard Questions

A homeowner who knows roofing still needs each bid to answer the same written questions, in the same order, before the prices are compared.

If you have worked a job site, read a framing plan, or spent a summer on a ladder, the first roof bid can feel easy to judge. You know what a square is, you can tell a valley from a hip, and you may already have a view on how a crew should stage its material. That confidence is useful, but it also tends to shorten the comparison. A bid that uses the right trade words can look complete before anyone has checked what it leaves out. This page is for the homeowner who knows roofing well enough to read a bid and still needs each roofer to answer the same written questions, in the same order, before the prices go side by side.

Roofer comparison

Start by putting the trade knowledge on the page, not only in your head. Write one line per question, then ask every roofer the same list. Keep the list short enough that a roofer can answer it in one visit or one email. Ask for each answer in writing, with the date it was given. When one roofer uses a term the other does not, note the term and ask each one to define it. A roofer who says "full tear-off" and another who says "complete remove and dispose" may mean the same thing, or may not, and the only way to find out is to have both write the definition.

Compare the bids by what each one names. A bid that lists the underlayment type, the drip edge metal, the starter course, and the ridge vent by product line gives you something to check on day one. A bid that says "standard materials" gives you nothing to check. Neither wording proves quality, but the first lets you hold the crew to a written line, and the second leaves that line to memory.

Watch how each roofer handles a question you already know the answer to. Ask about the pitch of the steepest plane, or the number of layers on the existing roof, when you have counted them yourself. A careful roofer will say what they measured and how, and will ask about your count. A roofer who agrees without checking has told you how the bid was built. Log that reply the same way you log the rest.

Missouri does not license roofers at the state level, and a trade background does not change that. Your comparison has to rest on the paper each company hands you. Ask for the company's legal name as it appears on the contract, the truck, and the invoice, and check that all three match before you go further.

What it costs

A bid that looks like it covers the whole roof can still have lines that do not add up. Start with the square count. Ask each roofer for the total squares, the waste factor they used, and whether the waste is applied to the field area only or to the whole roof, including starter and ridge. Then ask for the number of bundles they will order. If one bid counts 24 bundles and the other counts 26 for a similar square total, the difference is usually waste, and it belongs in the comparison.

Look at the unit prices behind any change order. Ask each roofer what rate applies to extra decking, extra sheathing, a rotted rafter tail, or a second layer of old shingles that turns up after tear-off. A roofer who gives you a rate sheet before the job starts has made the cost of surprises visible. A roofer who says the rate will be set when the problem is found has left the number open. Neither answer proves dishonesty, but they are different answers, and you should compare them as such.

Count the parts the bid does not show as separate lines. Permit fees, dumpster or haul-off charges, drip edge, pipe boot replacement, and roof jacks are often folded into one labor figure. Ask each roofer to break them out, even roughly, so you can see what each bid includes. The St. Louis freeze-thaw cycle also reaches the price. Late-season sealant work, hand sealing in cold weather, and a tear-off that must wait for a dry deck can all change the labor line. Ask each roofer how cold weather is priced, and whether a delay for a frozen or damp deck is billed.

Use the same arithmetic on every bid. Divide each total by the square count, then compare the per-square number. A bid that is lower per square can still cost more once the waste, the pipe boots, and the permit are added. Write the adjusted total at the bottom of your sheet, with a note on what it includes.

What to ask

Ask every roofer the same questions in the same order. Start with the ones that show how the job will run. Ask who will be on the roof each day, and whether the lead installer will be the same person from the first nail to the final walk. Ask how the crew will protect the deck when rain is forecast for the afternoon, and what gets tarped before the crew leaves. Ask who makes the call to stop work during a hard freeze or a hail warning, and how you will hear about it.

Ask about the paper trail. Ask which permit desk will issue the permit for your address, and who will pull it. Across St. Louis County, municipal permit desks differ, and a bid that assumes one desk when your address belongs to another can add days. Ask each roofer to name the desk. Ask for the inspection stages they expect, and who will call the inspector back once the deck is open. Write each answer down beside its question, not in a separate notes file.

Ask about the parts that show up later. Ask what the warranty covers, what it excludes, and who answers for a problem in the first year. Ask whether the warranty depends on a specific underlayment or ridge product, and whether the crew will register the shingle warranty for you. Ask each roofer to put the warranty terms in writing and to name the date those terms last changed. Hail season and freeze-thaw cycles both test the parts a bid often describes only in general terms, so ask about the ridge, the valleys, and the flashing by name.

Finally, ask each roofer to repeat one answer in their own words. Pick the question that matters most to your house, such as how the old layers will come off or how the deck gets checked for soft spots. A roofer who can restate the answer clearly has likely thought it through. A roofer who repeats the bid's wording without adding anything has given you the wording, and you should ask the question again in writing.

If you want to know how Keys Roofing would answer any of these, the office line is (314) 220-2333. Keys documents damage, puts a written scope with photos and measurements in your hands, and attends as the contractor while you deal with your own insurer. Missouri law forbids a roofing contractor from representing or negotiating a homeowner's insurance claim, so bring your insurance questions to your own agent or insurer and bring the roofing questions to the roofers.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection