Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

When the Observatory Roof Rolls Back, Who Covers the Telescope?

Your roll-off observatory roof and its track are not a fixed roof, so compare how each roofer scopes the panels, drive and telescope before roof day.

An observatory roof is not a roof in the usual sense. In many backyard observatories, the roof is a set of panels that slide or roll back on rails so the telescope can see the sky, and the whole assembly sits on its own walls and track. When a crew comes to replace the shingles on a house, or on the observatory's own shell, the roll-off panels become part of the work. Most roof bids are written for a fixed roof, so the roll-off hardware often goes unmentioned until the crew reaches it.

This page is for a homeowner who has two or more roofing quotes in hand and needs to know what each one does with a rolling roof section. The question is simple. When the panels come off, where do they go, who takes the rails and drive apart, and who puts them back to the alignment the telescope depends on? The answers should be written on the bid, not left for the crew to decide on the ladder.

Why a roll-off roof changes the bid

A roll-off panel is heavier than shingles and sits on wheels that ride a steel or aluminum track. The track has to stay level within a small tolerance, or the panel binds, the motor strains, and the limit switches stop reading the position they were set for. A crew that removes a panel to reach the deck needs to know that the track stays fixed, that the wheel carriages are marked, and that the panel goes back on the same carriages in the same order.

The drive is a second item. Many observatories use a motor, a gear reducer, a controller, and a set of limit switches tied to a power circuit. If the crew needs to pull a panel off the rails, someone has to shut the power at the source, and that shutdown should happen before the first panel moves. Ask each roofer who makes that shutdown and who confirms it in writing. Keys can describe only its own part of that work, so expect the electrical disconnect to appear as a separate job unless the bid names it.

The mount and pier are the third item. The telescope mount usually sits on a pier that is not attached to the roof structure. Even so, a crew working overhead can knock a cable, bump a dew shield, or set a ladder against a rail that flexes. A homeowner should ask for the telescope to be covered or moved, and for the covered position to be written on the bid, not assumed.

What the seasons do to a roll-off track

St. Louis winters put grit and ice into any track that sits outdoors. The freeze and thaw cycle lifts small sections of grout, shifts a rail mount a few millimeters, and leaves water standing in the wheel carriages. Spring then brings pollen and cottonwood fluff into the same grooves. A roofer who works on the observatory during these months should say how the track is cleaned before the panel rolls back, and who checks the carriages before the panels return to service.

Summer heat can warp a fiberglass or polycarbonate panel if it is left halfway open on the rails through a long afternoon. Ask each roofer whether the panels will be locked closed or propped open at the end of each day, and who decides when the panel closes for a storm. A bid that says secure at end of day without naming the position is not enough.

Hail matters too. A roll-off panel takes hail on its face, its rails, and its edge seal, and the panel can look fine from the ground while the seal under the lip has lifted. The safest record is a dated set of photos taken before tear-off, showing each panel face, the wheel carriages, and the slot seal, plus a measurement of the slot opening. Keys documents damage and puts a written scope with photos and measurements in the homeowner's hands, and that written scope is the document to compare across bids.

What to compare on the bid

Start by reading each bid for the words roll-off, panel, track, rail, carriage, drive, and observatory. If a bid never uses any of them, that is an answer. The quote simply does not know the panels exist, and the crew will meet them on roof day. Mark the item as blank and ask for a written reply.

Then compare the following points across the bids:

  • Whether the roll-off panels are inside the roof scope, outside it, or priced as a separate line.
  • Who removes the panel from the carriages, and whether the carriages are marked before removal.
  • Who shuts the drive power, and whether the electrician is named or left to the homeowner.
  • Where the telescope and its cover go during tear-off, and who lifts the cover back on.
  • How the track is checked for level after the panels return, and whether that check is in writing.
  • What position the panels are locked in at the end of each day, and who decides when a storm changes that.
  • Whether the slot seal and edge trim are replaced, reused, or repaired, and who pays if the seal fails after the first rain.

A bid that answers all seven in plain sentences is easier to compare than one that answers three in detail and leaves four blank. The blank ones are where the next call will come from.

What it costs

Roll-off hardware usually appears in a bid in one of three ways. It may be folded into a general labor line, it may be a separate removal and reinstall line, or it may be left out and then billed as a change order once the crew finds it. The homeowner should push for the second option. A separate line makes it possible to see the hours, compare them with the other bids, and decide whether a specialist should do the reinstall instead of the roofing crew.

Ask each roofer whether the reinstall price assumes the track is already level. If the track has moved, the price for leveling it, shimming the rails, or replacing a carriage is a different number. Ask for that number now, so the homeowner is not deciding it with the panels off and the sky open overhead.

Ask also who pays for the electrician if the drive circuit has to be disconnected and reconnected. Missouri does not license roofers at the state level, so electrical work is not part of a roofing bid unless the bid says it is. The same applies to any motor replacement that turns up when the drive is tested. Put a number on the table before the drive is opened.

What to ask

  • Is the roll-off roof and its track in the scope, and is it its own line on the bid?
  • Who shuts the drive power, and who confirms the shutdown in writing before any panel moves?
  • How are the carriages and rail positions marked before removal, and who checks them after the panels go back?
  • Where does the telescope go, and who moves or covers it?
  • What is the end-of-day position for the panels, and who decides when it changes?
  • Who pays if the track or carriages have moved since the observatory was built?
  • Can the dated photo set cover each panel face, carriage, slot seal, and track before tear-off?

Write each roofer's answers beside their name. The comparison is not about who sounds most confident. It is about who put the words roll-off and track into the bid, and who gave a plain answer when asked what happens to the telescope at four in the afternoon on a windy day.

Next step

If the observatory roof is part of your house, the roof bids you hold should show it. If the observatory stands separately, its roof may need its own quote, its own schedule, and its own photo file. Call (314) 220-2333 and ask Keys to write the roll-off answers into the scope before you choose a date.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection