Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

When the Forecast Flips Overnight, Ask Each Roofer What Happens Next

A forecast that changes after the crew has loaded the truck still needs an answer, and each St. Louis roofer should put that answer in writing before the job starts.

A roof day is planned around a forecast, and the forecast changes. In St. Louis a front can move in from the west in the afternoon after a morning that looked clear, and a crew that loaded shingles at dawn may be standing on a roof with open decking when the first hard gust comes through. Every roofer you compare has a rule for that moment. Some have written it down, and some will tell you what they usually do. The difference matters because the rule decides who makes the call to stop, who covers the open roof overnight, and whether the lost time shows up on your bill.

Roofer comparison: where the forecast call gets made

Ask each roofer who checks the forecast on the morning of the job and who checks it again after lunch. A crew that looks at the weather once at 6 a.m. and a crew that checks at 6 a.m., again at 11 a.m., and once more before it leaves the lot are running different systems. Neither answer is wrong by itself, but the second answer tells you there is a second look. Write each answer next to the roofer's name so you can compare them later.

Then ask what the decision point is in plain terms. Some roofers stop when rain is in the afternoon forecast. Others keep working until the crew sees lightning or the wind picks up enough to move a bundle. You are comparing two numbers and a trigger, and a trigger you cannot measure is not much of a trigger. Ask whether the stop is based on a named forecast source, a radar check, or the foreman's read of the sky. A foreman's eyes are a fine tool, but ask who is allowed to use them and whether the homeowner gets a call when the crew pulls off the roof.

Ask how each roofer covers the roof when work stops in the middle of the day. Open decking with no underlayment is the exposed case, and a tarp is the usual fallback. Ask who sets the tarp, who checks it at dusk, and who gets called if it lifts. Compare the answers side by side. If one roofer says the foreman tarps the open section before leaving and another says the crew will tarp it if there is time, you have found a gap that matters more than the price difference between the two bids.

Freeze-thaw cycles add a second layer to this comparison. A roof that was dry at quitting time can hold water in the deck by morning, and a crew that resumes on a wet deck is taking a risk that the homeowner may never see. Ask each roofer how they confirm the deck is dry before the crew steps back on it after a stop, and whether that check is logged.

What it costs

A stopped day usually costs money in two places. The first is labor already spent. A crew that tears off half a roof and then leaves for the day has been paid for the hours it worked, and the bid should say whether those hours are a flat day rate, a per-square charge, or billed by the hour. The second cost is the one most homeowners never see on the printed bid: a restart. Some roofers charge a mobilization fee every time a crew returns to a site after a stop, and others absorb it inside the job. Neither approach is automatically better, but the number should be on paper before the first nail goes in.

Ask each roofer whether a weather stop counts against the schedule, and whether it moves your completion date. A roof that stops for three days in a row during a St. Louis spring is a different job from one that stops for an afternoon. The bid should say how many weather days are built into the schedule and what happens after the last one is used. A roofer who says the schedule absorbs weather without giving a number has not given you anything you can compare.

Ask about tarp charges. Tarps, weights and strapping are small materials, but they are real, and a bid that folds them into general labor is not showing you the cost. Ask whether a replacement tarp is billed if the first one is torn by wind. If the answer is yes, ask the price per tarp. If the answer is no, ask whether that promise is written into the contract or only said on the phone.

Keep in mind that weather costs change with the season. A late-fall start in St. Louis faces cold mornings, a shorter working day, and a higher chance of a stop for reasons that have nothing to do with rain. Ask each roofer whether the estimate assumes a full working day in the month you are booking. That answer changes the number more than most homeowners expect when they first look at a bid.

What to ask

Put these questions to each roofer, in the same order, and write down each answer as it is given:

  • What time do you check the forecast on the morning of the job, and do you check it again after lunch?
  • What rain, wind or lightning level makes the foreman stop the roof?
  • Who on the crew decides to stop, and will I hear about it the same day?
  • Where is the open section covered when the crew leaves, and who checks the tarp at dusk?
  • Who is called if a tarp lifts overnight, and how fast do you respond?
  • How is a stopped day billed, and at what rate?
  • Is there a mobilization charge for returning to a stopped site?
  • How many weather days are inside the schedule, and what happens after they are used?
  • Is a replacement tarp billed, and at what price?

Some roofers will answer these questions in one phone call. Others will want to send a written reply. Either is useful, but the written reply is the one you can compare later. Blank answers count too. If a roofer skips the question about overnight coverage, that gap belongs in your notes next to the price.

Best Roofers STL is the place to start this comparison, and the office number is (314) 220-2333. Keys Roofing, the contractor behind this site, should be asked the same questions by phone or in writing before you choose, and its answers should be compared against the others as they were written, word for word.

Where the weather rule belongs on paper

A verbal promise that the crew will watch the sky is not a contract term. Ask each roofer to put the stop rule, the tarp rule and the billing rule into the written bid or the contract, using the same words you heard on the phone. If the bid says one thing and the foreman says another on site, the written bid is the one you will have to point to. Read the stop trigger aloud before you sign, and make sure it is a specific condition rather than a feeling.

Missouri does not license roofers, so the written rule is one of the few tools a homeowner has to hold a roofer to the plan. Check it against your permit paperwork as well. Municipal permit desks across St. Louis County each keep their own inspection calendar, and a weather stop can push an inspection date. Ask each roofer whether a stopped day changes the inspection booking, and who makes that call when it does.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection