
When Every Roofer Says Yes, the Follow-Up Question Does the Comparing
Yes answers look alike on a roof bid, so compare the second answer each roofer gives, and what they put in writing.
Ask a roofer whether the crew cleans the yard, whether the crew is insured, and whether someone will be on site every day, and most will say yes. Those answers look alike on paper, so they tell you little when you lay two bids side by side. What separates one bid from another is the second question, the one that asks what the yes means in practice. This page is for a St. Louis homeowner who has two or three bids in hand and wants a way to sort the answers before choosing a start date.
Roofer comparison
Start by writing down the question you asked and the answer you heard, word for word where you can. Then ask a follow-up that forces a specific. If a roofer says the crew cleans the yard, ask where the nails in the grass go after the magnet pass and who walks the lawn at the final check. If the answer is a sentence about care and carries no names, steps, or times, the yes is general. A general yes is not the same as a written commitment, and you can hold only the written one.
Write the answers in a grid with one row per question and one column per roofer. Blank cells matter. If one roofer skips the question about freeze damage, that gap is information. Ask it again in writing so the silence does not get filled in later from memory, and note the date you asked and the date you got a reply.
St. Louis roof work adds pressure points that a generic question will miss. Freeze and thaw cycles lift shingle tabs and open nail lines that were fine when the crew left, so ask who returns if a tab lifts in January and whether that visit carries a charge. Hail season in spring brings a rush of calls, so ask how each roofer sequences its schedule when a storm sends the phones ringing. Ice damming at the eave can come up during tear-off if the deck stays damp, so ask what each roofer does with a deck that is wet on the morning of the install.
Keep the follow-up questions identical across bidders. A roofer who answers the second question in a different order than the others is giving you a different answer, not a better one. Put each answer in the same cell of the same sheet so the gaps show when you compare.
Permits are a place where a yes can hide. Many St. Louis County municipalities run their own permit desks with their own hours and their own inspection calendars. A roofer may say the permit is included without saying who pulls it, who pays the fee, or when the inspection gets booked. Ask who is named as applicant on the permit and who calls the inspector when the work is ready. Those two facts tell you who is accountable when an inspection slips and the crew is waiting on a callback.
What it costs
A yes on price is easy to give and hard to compare. Two quotes can show the same total and still carry different lines underneath. Ask each roofer to show the total with the lines that make it up, including materials, labor, tear-off, disposal, underlayment, flashing, and the permit. If one bid leaves disposal out and the other includes it, the lower number is not the lower job.
Ask what the bid assumes. A bid may assume one layer of old shingles, a dry deck, a standard pitch, or a crew that works full days when the weather allows. Each assumption can move the final bill. Ask each roofer to name the assumptions in writing, then compare the two lists. A bid that names more of its assumptions is often easier to check, not more expensive, and the assumptions that differ between bids explain most of the gap in their totals.
Ask about the shingle line by name. Keys Roofing installs Atlas and Malarkey shingles, and the contract should name the line, the color, and the bundle count for the job. If another roofer's bid says only architectural shingle with no brand or line, ask them to name it before you compare the number, because a generic description can mean a different product from one bid to the next. Do the same check on the color, since a shade chosen from a small sample can look different on a full roof in St. Louis sun.
Deposits deserve their own question. Ask how much the deposit is, whether it goes toward shingles that are already ordered, and whether it comes back if the start date slips for reasons on the roofer's side. A deposit spent on materials before you have signed a finished scope carries a different risk from one held against the job. Payment terms belong in the cost comparison too. Ask what is due at signing, what triggers each later payment, and whether the final payment waits for a completed walk and a signed closeout. A payment tied to a finished step is easier to check than one tied to a calendar date.
What to ask
Use one list for every roofer so the answers can be compared line by line. These questions work for a St. Louis homeowner choosing between two or three bids:
- When a shingle tab lifts after the first hard freeze, who comes out, and does that visit carry a charge?
- Who pulls the permit, who pays the fee, and who calls the inspector when the work is ready?
- Which shingle line is named in the contract, and what color and bundle count does the bid assume?
- What does the bid assume about the old layers, the condition of the deck, and the pitch of each slope?
- Which disposal line applies to the old roofing, and who hauls it away?
- What is due at signing, and what triggers each later payment?
- Who is the contact on the job once the crew starts, and what number do you call after hours?
Write each answer down with the date you received it. If a roofer answers a question with a sentence that does not name a person, a step, or a number, mark it as a general answer and ask again in writing. A roofer who gives a specific answer to every line is easier to hold to the contract later, and one who gives general answers to the same lines is telling you how the job will be handled when something changes.
Keys Roofing can be reached at (314) 220-2333 during office hours, and a written scope with photos and measurements can be requested before any decision is due. A homeowner who is also working with their own insurer should know that Missouri law bars a roofing contractor from representing or negotiating a homeowner's insurance claim, and that the same law bars a contractor from saying anything about paying, waiving, or covering a deductible. A roofer may document damage, put a written scope with photos and measurements in the homeowner's hands, and attend as the contractor while the homeowner deals with the insurer. Questions about the claim itself belong with the homeowner and the insurer.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.