Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

When an Ambulance Needs Your Street, Ask Each Roofer Who Moves the Trailer

An emergency vehicle can stop a roof crew on your street, so ask each roofer how the truck clears, who calls you, and who pays for the lost hours.

A roof crew works on a street that other people also need. On a St. Louis block, an ambulance may come down the lane your roof truck is parked in, and a fire engine may need the curb in front of your house to reach a hydrant. Neither is rare enough to ignore, and neither shows up in a roof bid unless someone wrote it there. This page is for the homeowner who is partway through choosing a roofer and wants to know what each one would do when an emergency vehicle needs the street during the job.

Why the street matters on roof day

Roof work puts a lot on the street before a shingle comes off. A dumpster or trailer takes a curb space, the shingle truck needs a lane wide enough to stop and unload, and the crew's cars need somewhere to sit. Once tear-off starts, the crew may be on the roof for many hours while you are inside. An emergency vehicle that needs the same block can meet a trailer in its path with no one at the curb to move it.

Nobody is asking a roofer to predict an emergency. The question is whether the crew has a plan for the moment one arrives, and whether that plan is clear enough to compare. Two roofers can give the same price and very different answers to this, and the difference only shows up if you ask.

Open roof sections make the question sharper. If the crew has pulled shingles off one slope and the sheathing is exposed, a stop on the roof is not the same as a stop in an empty yard. Ask each roofer what state the roof is in when a vehicle comes down the street, because the answer decides whether the crew can leave the ladder and walk down in a few minutes.

Roofer comparison

Put each roofer's answer into the same columns: who moves the trailer, how quickly it happens, where the trailer goes, and who tells you what happened. A crew that says "we pull over" has answered less than a crew that names a foreman, a spot on the lot, a time limit, and a same-day call to the homeowner.

Ask whether the crew stops work on the roof when a vehicle comes through. Some crews keep working because stopping can leave an open section exposed to weather. Others come down the ladder and wait. Neither answer is automatically right. What matters is whether the roofer names the rule and whether you can live with it on a day when a vehicle and an open roof arrive together.

Ask who is on the roof when the stop happens. A crew of four or five working a steep pitch does not come down as quickly as a crew with one person on the ground. A roofer who posts a crew member at the street during tear-off has a different plan from one who relies on whoever is nearest the ladder.

Ask whether the roofer has done this on a street like yours. A cul-de-sac with one way in is a different problem from a through street with a bus route and a school. A roofer who has worked on tight older blocks will usually describe the trailer spot and the truck turn in more detail than one who has only worked on open lots.

  • Who moves the trailer or dumpster, and where it goes when it is moved
  • Whether a crew member is posted at the street during tear-off
  • Whether the crew stops on the roof or keeps the open section covered
  • Who calls the homeowner, and how soon after the vehicle leaves

Write each answer beside the question it answers. If one roofer says the crew will work around it and another names a role, a stated stop rule, and a call time, the second answer carries more information even if both are short.

What it costs

An emergency stop costs crew time, and crew time is already inside the bid. How much it moves the number depends on how the roofer prices the job. If the bid is by the day, a lost two hours may not change the bill but may move the finish date. If the bid is by the square, the stop may push the schedule, and the roofer may bill standby time if the contract allows it. Ask which one applies, because the same delay can cost you nothing under one bid and a standby charge under another.

Ask whether a stopped day is billed as standby, rescheduled at no charge, or counted against a standby allowance already built into the schedule. Then ask where that answer appears. The contract should say it. A roofer who says the stop costs nothing should be able to point to the line that says so.

Ask what a moved start does to the rest of the calendar. A crew pulled off your roof for a morning may lose the afternoon to a permit desk call or a supplier problem, and the next open day may be a week away. Ask how many standby days sit inside the schedule and whether an emergency stop uses one of them. The number of spare days is a fair thing to compare across bids.

Ask whether the roofer can state a dollar figure for a moved trailer or a lost crew hour, or whether the cost is open-ended. A written rate is easier to compare than a phrase such as "it depends on the day". If the roofer cannot give a rate, ask for the hourly crew rate that would apply to any change order, and write it down with the date.

What to ask

Use the same questions with each roofer, in the same order, and write the answers down. The list below is a starting set. Add your own questions about your street, your lot, and any neighbor who depends on the curb.

  1. When an ambulance or fire engine needs our block, who moves the crew's trailer, and where does it go?
  2. Is someone posted at the street during tear-off, and who is that person?
  3. Does the crew stop work on the roof when a vehicle comes through, and how is the open section covered?
  4. Who calls me that day, and how soon?
  5. Is a stopped day billed, rescheduled, or counted against standby days, and in which document is that written?
  6. Does the contract name the emergency stop, or is it left out?

If a roofer cannot answer a question on the spot, ask for the answer in writing. A written answer is a commitment. A spoken "we handle that" may not survive the first ambulance on the block. Keep the written answers in one folder with the bid, the scope, and the contract.

Keys Roofing can be reached at (314) 220-2333. Ask the office the same six questions, and ask for the answers to go into the written scope along with the photos and measurements. Keys puts that written scope in your hands, so you can compare it against the other bids on the same terms.

Keep the answers on paper

Once you have answers from each roofer, put them on one sheet with the roofers as columns and the questions as rows. A blank cell is information. If one roofer leaves the standby question blank, note it and ask again in writing before you decide.

Date each answer. Roof schedules move, and a sentence from a sales call in March may not match the crew you get in June. If a roofer changes an answer later, keep both versions and ask which one the contract follows.

Walk the street yourself with the roofer's trailer plan in hand. Mark the curb where the trailer would sit, the hydrant nearest your lot, and any driveway a fire engine might need. Show that mark to the roofer and ask them to confirm it in writing. A plan that matches the actual curb is worth more than one drawn from memory.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection