Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

When a Tenant Refuses Roof Day Access, Compare Each Roofer's Answer

A tenant who will not open the door can stall a roof job, so compare how each roofer plans for it before you sign.

If you own a rental house in St. Louis County, the roof crew does not work for your tenant, and the tenant does not have to hand over the keys because a roofing date is on your calendar. Before you choose a roofer, you need to know what each one will do when the person living in the house says the crew cannot come in, cannot park in the drive, or cannot get onto the back deck. The answers differ, and the difference shows up in the schedule, the bid, and the day the crew sits in the truck.

This page is for the owner who is weighing bids and has a tenant in the home. It does not cover your lease terms, your insurer, or any claim. For those, a Missouri real estate attorney or the landlord-tenant resources your city or county publishes are the right places to start.

Why access is a roofing question, not only a lease question

A roof job needs more than the roof. The crew needs a safe way to the eave, a place to stage shingle bundles, a path for the tear-off dumpster, and someone inside who can move furniture away from the ceiling below the work. In a rental, most of those things belong to the tenant's daily life. A dog that runs loose, a car parked across the drive, a locked gate, or a tenant who works nights and sleeps through the morning can each stop a roof day before the first nail is set.

Freeze and thaw cycles make the timing tighter than many owners expect. A tear-off that is delayed past a rain forecast leaves the deck open, and an open deck in a St. Louis spring is a problem that gets worse with each storm. A refusal that pushes the crew back two weeks is not a small inconvenience. It can mean a partial tear-off, tarps overnight, and a second mobilization fee that the bid may not have anticipated.

The four answers you should hear

Each roofer will give you some version of an answer when you ask what happens if the tenant says no. Listen for whether the answer names a person, a date, and a written step. These are the four patterns you are likely to hear.

  • The reschedule answer. The roofer says the crew will come back on a later date, with no fee, and asks you to send the new date in writing. This is the simplest answer. Ask how many reschedules the bid allows before a fee applies, and whether the crew's paid days stay with the job or are lost.
  • The owner-in-the-middle answer. The roofer says the owner must resolve access with the tenant and tell the crew when the way is clear. This is reasonable, but it puts the burden on you. Ask who calls the tenant, whether the roofer will send a written access notice on its letterhead, and what the crew does on arrival if the way is still blocked.
  • The on-site answer. The roofer says the crew will knock, explain the work, and wait a set time before leaving. Ask how long the wait is, whether the crew will photograph the blocked access and send the photos to you the same day, and whether a no-show is billed as a trip charge.
  • The vague answer. The roofer says it will work it out on the day. Treat this as an unfinished answer. Ask the same question again in writing and compare the reply with the other bids.

What to ask each roofer, in writing

Send the same three questions to each roofer and keep the replies in one folder. The point is to compare the answers, not the tone of the call.

  1. If the tenant refuses access on the scheduled day, what do you record, who do you notify, and how soon do you send it to me?
  2. Is a blocked-access visit billed, and if so, at what rate and to whom? Does the bid include any trip charge for a return visit?
  3. If the job has to move to another date, does the crew keep its place on the calendar, and does the new date need a signed change order?
  4. Can you provide a written access notice I can give the tenant, with the date window, the work area, and the crew contact number?

A roofer who answers the first question with a specific process, a named contact, and a written photo record is giving you something you can compare. A roofer who says the crew will just call you is giving you a phone call, and a phone call is hard to hold up later.

What the bid should show

Look at the bid for three lines. The first is the access plan: a sentence stating what the crew needs on the day, such as clear drive space, a gate that opens, and the back door unlocked or a key arrangement set in writing. The second is the return visit: a stated fee, or a statement that none applies. The third is the schedule hold: how many days the crew reserves and what happens to the reservation when a visit does not go ahead.

If a bid says nothing about access, do not assume it is included. Ask for the line to be added in writing before you sign. The question is not whether a roofer is careful. The question is whether the paper says what happens.

A practical check before you book

Before you pick a date, talk to your tenant in writing. Tell them the work window, the crew size, the expected noise, the parking need, and the reason the roof has to come off now. Ask them to name any reason the crew might not be able to enter, such as a pet, a medical need, a work schedule, or a locked gate. Those answers belong in your file before the roofer's crew arrives.

Ask the roofer how it wants the tenant contacted. Some crews prefer that the owner make the first call. Others will send a crew lead to the door with a printed notice. Either approach can work, but the one you choose should match the answer the roofer gave you in writing.

Keeping the record clean

Keep a dated log of every message with the tenant and the roofer. Save texts and emails. If the crew photographs a blocked drive or a locked gate, ask for the original photos with their dates, not screenshots. This record helps you reschedule fairly and helps the roofer bill fairly. It also protects both sides if a dispute comes up about what was said or when the crew arrived.

If you want to talk through how a specific roofer answers these questions, call Keys Roofing at (314) 220-2333 and ask for the access plan in writing before you commit to a date. Ask for the same plan from every roofer you are comparing, so the answers can be set side by side on one sheet.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection