Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Water From Your Hose Bib on Roof Day: Compare Who Pays

Each roofer should say who pays for water the crew draws from your hose bib, what it is used for, and whether the number is written into the bid.

Roof day uses more water than most homeowners expect. The crew wets the ground for dust, rinses tools and ladder feet, may mix sealant or cement on some jobs, and sometimes runs a pressure washer on the porch or eave before new shingles go on. Most of that water comes from the nearest outdoor hose bib, which means your meter and your bill. A roof quote rarely says who pays for it, so the answer should be on paper before the first truck turns in.

What the crew actually uses

Ask each roofer to list every water use on your lot before the start date. Dust control during tear-off is the one most people picture, usually a light mist on the lower courses and along the drop zone when the wind is down. Tool cleaning at the end of the day takes more, and a pressure wash of the eave or porch takes the most. Ask whether the bid includes a pressure wash at all. If it does, the water is part of the job. If it does not, ask who decides whether one is needed and who pays for the water if it is added later.

Then there is the crew's own drinking water and hand washing. That usually comes from the truck or a jug, not your hose bib, and a good answer says so. A roofer who says the crew will "just use the kitchen sink" has left a question open, because the crew should not be inside the house for water on a roof day unless the bid says it is.

Who pays, and how the answer shows up

Three answers come up most often. The first is that the roofer includes water in the price and draws from your bib at no separate charge. The second is that you pay for metered water on your normal bill, with no line in the contract. The third is that the roofer brings its own supply, which on many St. Louis jobs means a tank on the truck. Each answer can be compared, but they cost differently. The first hides the cost inside the price. The second is a cost you pay without knowing the amount. The third is a line you can see and check.

Ask for the answer as a sentence in the bid, not as a verbal assurance. Something like "the crew will use up to a stated number of gallons from the homeowner's hose bib at no charge" or "the crew will supply all water on site" is a sentence you can check at the end of the job. A promise made on the phone with no number attached is not.

Runoff is part of the water question

Water used on the roof does not stay on the roof. Wash water from a pressure wash runs off the eave, down the gutter line if the gutters are still up, and across the drive or walk toward the curb. On the clay soils common across St. Louis County, standing water can sit on a lawn for days after rain and soften the ground under a ladder. A hose laid across the drive is also a trip hazard on a busy roof day, so ask where it will run. Ask each roofer where the wash water goes, whether it is kept off the neighbor's lot, and whether the crew will sweep grit and wet spots from the drive afterward. A bid that is silent on runoff leaves the cleanup to whoever notices the mess first, which is usually you.

Read the water line against the meter

St. Louis water is billed by the metered unit, and a few hundred gallons on a single roof day will show up on the next statement. Most homeowners will not object to that on its own. The trouble starts when the roof runs two or three days and the bill arrives with no explanation to match it. If a roofer says the water is free, ask whether you should note the meter reading before the first day and after the last, and ask who reads it. Some homeowners keep a dated photo of the meter face for exactly this reason. That photo is the cheapest proof either side can have, and it costs nothing to take.

Freezing weather changes the hose bib answer

From late fall through March, the outdoor bib is a frost question before it is a billing question. A hose left attached to a bib during a freeze can crack the valve, and water that backs into the house line can turn a small fix into a plumbing repair. The bid should say whether the crew will use the bib at all in cold weather. If it will, the bid should name who disconnects the hose at the end of each day and who checks the bib before the next freeze. Winter crews often start early to get the most daylight, which puts water demand at the coldest hours of the morning, and that is when a stiff valve is most likely to fail.

What to ask each roofer

  • Which tasks on your lot need water, and about how many days each one runs
  • Whether the crew will use your hose bib, and if so, which one
  • Whether the price includes the water, or whether you pay for metered use
  • If you pay, what cap or estimate the bid uses for gallons
  • Who reads the meter before and after the job, and where that reading is written
  • Whether a pressure washer runs on the porch, the eave, or the drive
  • Where wash water goes, and who sweeps the drive when the job ends
  • Who disconnects the hose each day, and who checks the bib in cold weather
  • Whether the crew carries its own water for drinking and hand washing

Write each answer beside the roofer's name, in the same order you asked the questions. A blank cell in the water line is an answer too. A blank usually means the roofer has not thought about it, and that is a fair thing to note when you compare.

When the answer stays vague

If a roofer gives an answer that is hard to pin down, ask for the same answer in writing from the office before you choose. Keys Roofing can be reached at (314) 220-2333, and that is the line to call with questions about roof-day water use before the bid is signed. Ask the office what the crew plans to use, where it plans to draw it, and how the meter will be read. The answer belongs in your folder with the rest of the written scope, so that it can be checked at final walk instead of argued about afterward.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection