Wasp Nests Under the Rake: Ask Each Roofer Who Removes Them Before Tear-Off
Compare who removes a wasp nest under your rake or soffit, when it happens, and whether each roof bid says so in writing.
A wasp nest under the rake edge is easy to miss until the crew is already on the ladder. Paper wasps and yellowjackets favor the gap where the fascia meets the roof edge, the space behind a soffit panel, and the dark corner behind a gable vent louver. St. Louis summers give them a long season, and a nest that looked small in July can be the size of a fist by the time a bid is signed in September. Before the tear-off starts, you want each roofer to say who finds the nest, who removes it, and when, and you want that answer in writing.
This page is for the homeowner who has one or more bids in hand and wants to compare the wasp question before choosing. It does not cover the rest of the job. The point is narrow: a nest on the roof edge changes the schedule, the crew's safety plan, and sometimes the price, and most bids say nothing about it.
Roofer comparison
Ask each roofer the same three questions. Does the bid assume the crew will find nests during a pre-start walk, or does it assume the homeowner will handle them? Who is responsible for removal if a nest turns up on the morning of tear-off? And what happens to the start date if the nest is active and the crew will not work that edge until it is cleared?
The answers tend to fall into three groups. Some roofers include a line saying that nests found during the pre-start walk will be removed before the first shingle comes off. Some say they will stop work on that elevation, notify the homeowner, and leave removal to a pest service or to the homeowner. Others say nothing. A silent bid does not mean the crew will ignore the nest. It means you will learn the answer at the worst possible moment, with the ladder already against the wall.
Compare the timing too. A roofer who walks the property before the start date can find nests while there is still time to schedule removal. A roofer who first sees the eave on the morning of work has to stop, make a call, and reschedule. Ask whether each roofer does a pre-start walk, and whether that walk includes the soffit and the rake edges.
Write down what each roofer says about the wasps themselves. Some will say stinging insects are part of site preparation. Others will say they are outside the roofing scope and that you should call a pest control company. Both answers can be reasonable, but they produce different bids. One puts the cost and the schedule risk on the roofer, and the other puts them on you.
What it costs
Nest removal is usually a small line item, but it is still a line item, and many roof bids leave it out entirely. A pest service visit for one nest is a separate charge from the roof. If the nest sits inside a soffit panel, removal may also mean opening the panel, treating the cavity, and reinstalling it, which adds labor on the roofer's side. None of this is a reason to avoid the job. It is a reason to ask which of these costs are already inside the number you were given.
Ask each roofer whether removal is included in the bid, billed as an extra when found, or left for you to arrange. If the answer is "billed as an extra," ask for the rate in writing before work starts. A roofer who says the nest will be "handled" but cannot say who pays for it has not answered the question.
There is also a schedule cost. An active nest can hold a roof edge out of work for several days. In late summer, a crew that loses two days waiting for a nest to clear may push the job into weather that is less reliable. Ask whether the bid carries any allowance for a hold, and whether a hold moves the start date or the completion date.
What to ask
- Does the bid include a pre-start walk of the soffit, fascia, and rake edges, and when will it happen?
- If a nest is found, who removes it, and who pays for the removal?
- Will the crew stop work on that elevation, and will you be told the same day?
- Do you treat the nest yourselves, or do you require a pest service to do it?
- If a nest is found mid-tear-off, does the bid say how the schedule moves?
- Will the removal be recorded in the job file, with the date and a photo?
Ask these questions in writing. A short email is enough, and the reply should name the same steps. If a roofer answers by phone and the written bid says something different, the written bid is the one to rely on.
What to do before the crew arrives
Walk the edges yourself in the week before the start date. Look at the soffit panels, the gap where the fascia meets the roof edge, and the underside of any gable vent. Watch for wasps moving in a steady line in and out of one spot, which usually means a nest is close by. An active nest is harder to deal with than an empty one, and an active nest on a Monday morning changes the plan for the whole day.
Do not knock a nest down yourself while it is active. If you find one, tell the roofer before the start date and keep children and pets away from that side of the house. If the nest is inside the soffit or behind a panel, leave it alone until the person doing the removal is on site.
Keep a dated note of what you found and what each roofer said. A note reading "nest under the south eave, found August 14, roofer A says they remove it before work, roofer B says we call a pest service" is useful later, when the schedule is tight and the question comes back.
Where a St. Louis roof gets caught
The wasp question is seasonal. In this part of Missouri it peaks in late summer and early fall, when colonies are largest and workers defend them most aggressively. A bid signed in spring may be scheduled for late summer, and a nest that was not there in April can be the problem in August. Ask each roofer what month the crew expects to start, and whether the job would move if a nest turns up on the first day.
A hard freeze ends most colonies, but it does not help a September start. Old nests are usually empty after the first freeze and can be removed with little risk. A nest that is still occupied in October is a different job, and it deserves the same written answer as any other nest found on the roof edge.
If you have questions about a bid before you sign, the office can be reached at (314) 220-2333.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.