A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Two Roofers Give Two Start Dates: What to Ask Before You Pick

When two roofers give you different start weeks, the gap usually comes from what each one counts, so ask both the same three questions.

Two roofers quote your house and each gives you a start week. The weeks differ by four or five days, and you wonder whether one of them is padding the calendar or the other is being optimistic. Neither guess is the useful one. A start week is a count of working days that depends on what each roofer has already put on the calendar ahead of your roof, and the gap between the two dates is usually a question about what each of them is counting.

Roofer comparison starts with the count

A start date on a bid is the first day a crew expects to be on your lot. It is not the day the roof is finished, and it is not the day the permit is pulled. Some roofers set the start from the day the deposit clears. Others set it from the day the shingles are ordered, and others from the day the estimator finishes the measurement. Each of those is a real way to build a calendar, but they produce different numbers even when the crew is the same size.

If one of the bids on your table is from Keys Roofing, check its start window against the same questions you put to every other roofer. Do not compare the two dates until you know what each one starts from. Ask the other roofer directly: from which day does your start week count? Write the answer beside the date so the two numbers can be read together later.

What counts as a working day

Working days and calendar days are different counts. A bid that says the job takes six days may mean six crew days in the field, or six calendar days from the first nail to the final walk, which can include weekends off and a rain day. On a three-week schedule in St. Louis, that difference can be a full week. Ask each roofer which count they mean and whether the number includes the tear-off, the dry-in, and the cleanup, or only the shingle install.

Count the holidays too. A roofer who skips Thanksgiving Thursday and the Friday after has counted differently from one who keeps the crew on the lot. Neither is wrong, but a homeowner who wants the roof dry before a December gathering needs to know which calendar the bid used.

Weather and the freeze

St. Louis winters bring a freeze and thaw cycle that can close the shingle window for days at a time. Sealant strips do not bond in cold weather, and a crew will hold off on a deck that is damp or on a day that is below the temperature the shingle maker allows for hand sealing. A solid bid says what the roofer does when the forecast turns. A weaker bid adds a start date and hopes the weather cooperates.

Spring brings the opposite problem. Hail season runs through the warm months, and a roofer may keep a slot open for a storm repair that never comes. That is a legitimate reason for a later start, but it belongs on the paper, not only in a phone call. Ask each roofer how many days of the calendar they leave open for weather and whether those days are already inside the start week or added after it.

The permit desk sets its own clock

Many roofs in St. Louis County need a permit, and the municipal desk that issues it keeps its own hours and its own review time. The county, the city, and the smaller towns each run the process a little differently. A roofer who has pulled permits in one municipality may know the review time there and not the next. If a bid's start date assumes a permit that has not been issued, the start is a guess until the permit is in hand.

Ask each roofer whether the start date waits on the permit, and if it does, which desk they are using and how long they expect the review to take. Ask who calls the desk and who tells you when the permit clears. The answer often explains the gap between two start weeks faster than the sales conversation does.

What to ask

Send both roofers the same three questions in writing. What event does your start window count from? How many days in your schedule are weather or buffer days, and are they inside the total? Does your start depend on a permit, and if so, which desk is it and who calls it?

Then compare the replies line by line. A roofer who answers the first question with a named day, the second with a number, and the third with a named desk has given you something you can check. A roofer who answers with a general promise to fit you in as soon as possible has given you a date with no count behind it. Keep both replies in one folder, dated, so you can see later which one held.

If one start is earlier, do not assume it is the better bid. Find out whether the earlier date skips a buffer day or a permit step. An early start that depends on a permit not yet issued carries the same risk as a late start that hides its weather days, only in the other direction.

What it costs you to wait

A gap of a few days costs more than the calendar shows. An open roof under a storm forecast needs a tarp and a plan for the night, and a homeowner who has already moved furniture for one start date may need to move it again. Ask each roofer what happens to your schedule when their start moves, and whether that change is written down. A roofer who can name the change in writing gives you a number you can plan around.

Cost also shows up in the price itself. If a bid holds its figure only until a certain date and the start slides past it, the total may change. Ask each roofer how long the price holds if the start moves, and get that answer in writing as well. If you want to walk through the calendar on the phone before you decide, Keys Roofing can be reached at (314) 220-2333. Bring both bids, both start dates, and the replies to the three questions above, and the comparison will take a few minutes.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection