Two Roof Measurements Disagree: Name the One That Orders the Shingles
Two roof measurements can mean two shingle orders, so ask each roofer which number they order from and who signs off on it.
A roof bid starts with a number, usually a square count, and the shingle order is placed from that number. Two roofers can stand in the same yard and return totals that are several squares apart. The gap is seldom a mystery. One crew may have walked the back slope, another may have worked from an aerial image that does not show the dormer, and a third may have added a waste percentage to a count that was already rounded. For a St. Louis homeowner who is comparing, the useful question is not which total sounds right. It is which number the order will be placed from, who took it, and who answers if the bundles run short on a Tuesday in July with the trailer already on the street.
This page covers what to do when two measurements disagree before either one is turned into a purchase. It applies whether the disagreement is between two roofers, or between one roofer and a figure you took yourself from a county record or a drone flight. It does not require you to know roofing math. It requires you to ask each side for the same five facts and to write the answers down next to each other.
Roofer comparison
Start by asking each roofer for the measurement method behind their number. A roof walked by a crew, climbed with a tape, flown by drone, or taken from an aerial image are four different routes, and each one misses something different. A walked roof sees the back slope and the valleys. An aerial image often misses small dormer cheeks and a lower porch plane. A drone reads the planes well but still needs a clean read on pitch. Ask which method was used, and ask whether the same method was used on the other roofer's visit before you compare the totals.
Next, ask for the date the measurement was taken. A square count from a spring visit may not match one from October if a garage was added or a porch roof was re-pitched in between. Ask who took the measurement by name, not only by company. Then ask for the slope count, meaning how many separate planes the roofer counted, because many disagreements come down to two planes being read as one or one plane being split into two. Finally, ask for the waste percentage applied on top of the net squares. Two bids with the same net count can order very different bundle totals once waste is added.
Set the answers in a simple grid with one column per roofer and five rows: method, date, person, slope count, and waste percentage. A blank cell is an answer too. If one roofer cannot say what method was used, record that next to the price as a gap. Do not fill it in with a guess.
What it costs
A measurement disagreement costs money in three places. The first is the price itself. If one bid is built on a smaller square count, its total may look lower, and the gap is not a discount. It is a smaller roof on paper. The second cost is the order. Shingles are bought by the bundle, and a short order means a second delivery, which means a second truck, a second driver, and a crew standing around until the pallet lands. The third cost is waste. Too much waste leaves extra bundles returned or stacked in the yard. Too little means the crew runs out on the last valley.
Ask each roofer to show the arithmetic from net squares to bundles, one line at a time. Ask what waste percentage they apply and whether it changes for a hip roof, a roof with many cuts, or a roof with a dormer in the middle of a slope. Ask whether the bundle count printed on the bid is the same number the supplier will receive. This exercise does not produce a savings figure. It produces the count that decides whether the job runs on schedule.
There is also a cost to re-measuring. Some roofers charge for a return trip to re-measure, and some do not. Ask in advance and write the answer on the comparison grid. If you pay for a second visit to settle a disagreement, the fee belongs on the same sheet as the two bids it helped you compare.
What to ask
Ask each roofer which number the shingle order will be placed from. Get the answer in writing, including the square count and the waste percentage, on the bid itself or in an email that names the bid by date. If the answer is a range, ask which end of the range the order uses.
Ask who checks the measurement before the number goes out. A second person reading the same plan or photo set catches more errors than one person working alone. Ask whether the roofer will share the photos or sketch the count came from. A sketch with each plane labeled is more useful than a total with no drawing behind it.
Ask what happens if the crew finds more roof than the bid counted once the old shingles come off. Ask who pays for the extra bundles and how fast the supplier can deliver them, since lead times can stretch during a cold snap or a hail season when demand climbs. Ask whether the answer changes if the extra squares sit on the back slope that nobody could see from the street.
Ask each roofer to name the single plane they were least sure of. Most careful roofers can name one. A roofer who says every plane was certain is telling you something about how closely they looked. Write that plane down, and when the two measurements are compared, check it first. If the roofers disagree only on that plane, the gap is narrow enough to settle with one more look.
Finally, ask when the number will be final. A measurement confirmed before the permit application is filed is easier to defend than one confirmed after. The city or county permit desk will ask for roof area on the application, and that figure should match the figure on the order. Where the two do not match, the permit desk is the wrong place to discover it.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.