Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Tipping a Roof Crew: Ask Each Roofer for the Rule in Writing

Tips, cash on the lot and gifts to a roof crew are a policy question, so compare each roofer's written answer before roof day.

A roof crew on your lot for two or three weeks will see your kitchen counter, your side gate and the cash in your coat pocket. Most homeowners want to thank a crew that worked through a February freeze or a July heat wave, and that instinct is fine. The question to compare is what each roofer's crew is allowed to accept, and whether that answer is written down anywhere before the first shingle comes off.

Tips handed over at the curb, a case of water left on the truck, a gift card, and a meal paid for out of your own pocket each carry a different kind of risk. A crew member who takes cash without any company record leaves no trace on your job. A crew member who turns down a gift gives you a clear signal about the company's rules. Neither answer should be a surprise on the morning the trucks turn in.

Roofer comparison

Ask each roofer for the same three things in writing: the rule on tips, the rule on gifts of any value, and the name of the person who handles a crew member who breaks the rule. Put the answers side by side. A roofer who says the crew does not take tips, and can point to where that rule appears in the crew's site rules or handbook, is giving you something you can check. A roofer who says the crew knows better is giving you a hope, not a rule.

Watch for the gap between what is said at the sales visit and what happens on your lot. The person who measured your roof may be the same person who promises the crew will not take money, but the crew lead is the one standing in your driveway at seven in the morning. Ask whether the rule is the same for the estimator, the office and the crew, and ask who you should call if you think it was broken.

Compare how each roofer answers when you say you want to give the crew a cold drink or a pizza on the last day. Some companies accept food for the whole crew, handed to the lead with no cash changing hands. Others want nothing at all. Either can be a sound policy. What matters is that the answer is specific enough to follow without guessing, and that it matches what the roofer's office tells you when you call.

The answer also tells you something about how the company manages its crews. A roofer with a clear written rule has usually thought about what happens when a crew member is asked for a favor by a homeowner who wants a faster schedule or a patch done outside the contract. A roofer without a rule has not necessarily done anything wrong, but you will be the one deciding each day what is fair, and that is a poor place to be in the middle of a job.

What it costs

A tip is a personal cost you choose to pay, and it does not belong in the roof price. Still, the way a roofer handles crew pay can show up in the numbers. Ask whether the labor rate on the bid already covers the crew's full wages, or whether the company expects homeowners to make up part of it. If a bid carries any line that reads like a gratuity or crew bonus, ask what it pays for, who receives it, and whether it is charged to you at all. A bonus that the company pays to its crew for finishing early is a company cost, and it should not appear as a surprise on your final invoice.

Cash handed over in a driveway leaves no receipt. If you decide to tip, you can ask the office how a crew bonus is recorded, or hand the amount to the company when the final invoice is settled so there is a paper trail. This protects you if a question comes up later about who was paid for what. It also keeps the money from becoming a reason a crew member feels pressed to do extra work outside the written scope, which is where many roof disputes start.

Gift cards and food have costs too. They come out of your budget, not the roofer's, so set a limit you can keep to and write down what you gave and when. A few sandwiches for six people on a hot August afternoon is a different thing from a gift card large enough that the crew member feels he owes you something. If you are unsure, ask the office before you buy anything.

Watch the timing as well. Tipping before the job is finished can read as an attempt to buy speed or a favor, even when you mean well. Many homeowners wait until the final walk is done and the closeout packet is in their hands, then thank the crew in whatever way the company allows. That order keeps the thanks separate from the work still owed.

Why the answer matters on a St. Louis roof

Local roof work is long and uneven. A crew may be on your roof through a cold snap in February, a humid stretch in June, and a week of afternoon storms in between, and a crew that is tired and underpaid is more likely to look for a shortcut. The rule on tips and gifts is one small part of how a company keeps its crews steady across those weeks. You do not need to become an expert in crew pay to ask about it. You only need to know whether the company has an answer and whether the answer holds up when you ask it twice.

The rule also matters if your job runs past a planned date. When a freeze stalls the shingle install and the crew comes back later in the week, the homeowner who has already handed out cash may feel entitled to change the schedule, and the crew may feel pressed to accept. Clear written rules keep those conversations about dates and scope rather than about favors.

What to ask

Put these questions to each roofer before you book, and write down each answer beside the question it answers:

  • Is there a written rule on tips, and can I have a copy of it?
  • Can crew members accept cash, gift cards or meals from homeowners? If a meal is allowed, who should it be handed to?
  • If a crew member accepts something the rule forbids, who do I call, and what happens next?
  • Does the crew have a bonus tied to finishing early, and is that bonus named anywhere on the bid or the contract?
  • If I want to thank the crew, is there a way to do it through the office so the record is clear?
  • Does the same rule apply to the estimator, the office staff and the subcontractors who may work on my roof?

Any roofer you talk with should be able to give you the answer in writing before the first nail goes in. If the answer comes back vague, call again and ask the same questions a week apart, then compare the replies. A rule that changes between calls tells you as much as a rule that is stated clearly. Keys Roofing's office line is (314) 220-2333, and that is the number to call with this question or any other one about the job.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection