Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

The Rain Plan Can Separate Two Roofing Quotes

Ask how each roofer will keep the house dry if rain arrives after the old roof has been removed.

A roofing quote can describe the shingles, underlayment and flashing without answering a basic question: what happens if rain reaches your house while the roof is open? That omission matters in St. Louis, where a clear morning can turn into an afternoon thunderstorm. Before choosing between roofers, compare the written rain plan, not just the promised start date.

The useful answer is more specific than, "We watch the weather." You need to know how much roof the crew plans to open, what materials will be available for temporary protection, who has authority to stop the tear-off and what happens if exposed decking gets wet. Those details show whether the contractor has planned the work around your house rather than around an ideal forecast.

Roofer comparison

Start by asking each roofer to define what an "open roof" means. It may mean bare wood decking after shingles and underlayment have been removed. It can also mean decking that has received underlayment but still has exposed valleys, wall intersections or penetrations. A roof is not fully protected merely because rolls of underlayment are visible from the ground.

Compare how much roof each crew expects to tear off at one time. A simple ranch with a modest pitch may be opened and dried in quickly. A house with several dormers, valleys, chimneys and low-slope sections takes longer. The crew must work around each interruption in the roof surface. A roofer should be able to explain whether the crew will work by slope, by section or across the entire house.

That answer should fit the actual roof. Opening one manageable section at a time may make sense on a complicated house. Opening larger areas may be reasonable when the roof is simple, the crew is properly sized and the forecast provides enough working time. The point is not that one method always wins. The point is that the roofer can connect the method to the roof in front of you.

Next, compare the stopping rule. Ask who checks the radar and who can tell the crew to stop removing material. If the answer is simply that the crew will decide, ask which person on site owns that decision. A named role, such as the job supervisor or crew leader, is more useful than a general promise that everyone watches the sky.

Forecast percentages alone are not a rain plan. A small chance of rain can still matter when bare decking is exposed. Storm cells can also develop quickly during St. Louis hail season. The roofer should consider the arrival time, direction and intensity of the weather, along with the time required to close the section already opened.

Ask what "dried in" means in the contractor's process. Underlayment needs to be installed correctly, with seams, edges and penetrations treated as part of the temporary water barrier. Valleys and roof-to-wall areas deserve particular attention because water concentrates there. Loose material draped over a roof is not the same thing as a secured temporary covering.

A written proposal does not need several pages about weather. It should still state that the contractor is responsible for protecting open work and describe the basic method. If one bid says nothing and another identifies staged tear-off, temporary coverings and responsibility for weather protection, those bids do not contain the same level of planning.

What happens when the deck gets wet

Wood decking does not automatically need replacement because a few drops touched it. The important questions are how wet it became, whether water entered the house and whether the deck is dry enough to cover. Trapping substantial moisture beneath underlayment and shingles can create problems that are harder to see after the roof is complete.

Ask how the contractor determines that damp decking is ready to cover. Looking at the surface is one check, but appearance alone may not settle the question after a hard shower. The response may involve drying time, ventilation, touch inspection or a moisture reading where conditions justify one. You want a method, not a promise that the sun will take care of it.

Existing deck condition also affects this decision. Older St. Louis houses may have plank decking with gaps, repairs or split boards. Newer sections may use plywood or oriented strand board. These materials do not all react to water in exactly the same way. Swollen panel edges, delamination or damaged boards should be addressed before new roofing covers them.

Cold weather adds another complication. A wet surface can remain damp longer when temperatures fall, and overnight freezing can turn retained water into ice. The local freeze thaw cycle makes scheduling and inspection important even when no heavy storm is expected. The roofer should not install roofing over frost or a visibly wet surface simply to finish the section.

Interior protection belongs in the discussion too. Attics may contain stored belongings, insulation, finished rooms or mechanical equipment. Ask whether the contractor expects you to move anything and how an unexpected opening will be handled. If water enters, photographs of the affected roof section and interior area help establish what happened and what needs to be corrected.

What it costs

A responsible rain plan may not appear as a separate line item. Labor for staging the tear-off, securing underlayment and keeping temporary coverings available is often built into the roof price. That does not make the plan free. It means the contractor has included weather protection in the way the job is staffed and scheduled.

Price differences can appear when one roofer expects to remove the entire roof quickly while another plans to work in smaller sections. Sectional work can require more setup and coordination, especially on a cut-up roof. It may also reduce the amount of exposed decking if conditions change. Compare the proposed method before treating the lower labor number as equivalent.

Temporary protection can create additional charges when work stops for reasons outside the original scope. The proposal should explain whether emergency covering, extra mobilization or a return visit can be charged separately. Ask for the conditions that trigger those charges and the rate or pricing method. An open-ended phrase such as "weather costs extra" does not tell you enough.

The larger cost usually comes from a failed plan. Water can reach insulation, drywall, flooring and belongings before anyone sees a ceiling stain. Even a limited intrusion can require drying and interior repairs. That risk is why the contract should assign responsibility for protecting the open roof instead of leaving the issue to a conversation on installation day.

Weather delays should also be separated from added cost. A postponed start does not necessarily mean the roof price changes. Ask how long the quoted price remains valid and whether rescheduling because of rain changes anything. Material price expiration and weather delay are different issues, and the contract should not blur them.

What to ask

Put the same questions to every bidder. Record the answers beside the quoted price so you can compare actual procedures rather than impressions.

  1. How much of this particular roof do you plan to remove at one time?
  2. Who on site decides when tear-off stops because weather is approaching?
  3. What must be completed before you consider a section dried in?
  4. What temporary coverings and fastening materials will be at the property?
  5. How will you protect valleys, chimneys, skylights and roof-to-wall intersections before shingles are installed?
  6. What do you do if the decking gets wet before it is covered?
  7. How do you decide whether damp decking is dry enough for underlayment and shingles?
  8. Who documents any water entry into the attic or living space?
  9. Can weather protection, remobilization or a return visit create an additional charge?
  10. Where does the contract assign responsibility for damage caused while the roof is open?

Listen for answers tied to measurements, roof sections and named responsibilities. "We have tarps" is incomplete unless the roofer explains where they will be, how they will be secured and how quickly the crew can deploy them. A tarp stored at another job does not protect your decking when a storm cell reaches the neighborhood.

Also ask whether the company schedules more tear-off work than its crews can close the same day. The answer should account for the number of workers, roof pitch, access and roof complexity. A steep two-story house with multiple valleys cannot be compared with an open single-story roof by square count alone.

If a three-tab roof is old enough that brittle shingles make isolated repair impractical, replacement may be the sensible scope. That does not justify exposing more decking than the crew can protect. Age changes the repair decision, not the contractor's responsibility to keep the structure dry.

Before signing, ask the roofer to add the agreed rain procedure to the proposal if it is missing. The language can be short: work will be staged, exposed areas will be secured before threatening weather and wet decking will be evaluated before covering. The office at Keys Roofing can be reached at (314) 220-2333 if you want the rain plan explained for your roof before comparing the final numbers.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection