Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

The Lowest Roofing Deposit Is Not Always the Safest Deal

Compare deposits, progress payments, final payment terms and lien paperwork before choosing a St. Louis roofer.

Two St. Louis roofing proposals can show the same total and still expose you to very different risks. One contractor may request a deposit, collect another payment when materials arrive and leave a meaningful balance until the work is complete. Another may ask for nearly everything before a crew steps onto the roof. The important comparison is not simply how much is due first. It is whether each payment is tied to something you can verify.

Roofer comparison

Put the payment schedule from each proposal on one sheet. Write down the deposit, the amount due at material delivery, any payment due when installation begins and the amount held until completion. Convert every percentage into dollars. A request for 30 percent sounds abstract. On a $20,000 contract, it means $6,000.

Next to each payment, write the event that triggers it. Good triggers are observable: materials delivered to your address, tear off completed, shingles installed, debris removed, final inspection completed when one is required. Weak triggers depend only on a date or a vague phrase such as substantial progress.

A deposit by itself does not tell you whether a roofer is reliable. Contractors may use deposits to reserve labor, order shingles and schedule delivery. The useful question is how much money remains after each stage compared with how much work remains. If the contractor would hold most of the contract price while most of the roof is still untouched, ask why.

Also compare what happens if weather interrupts the schedule. Hail season can fill production calendars quickly. Summer heat may shorten safe working hours. Rain can stop a tear off, and winter freeze thaw conditions can affect sealants and exposed surfaces. A payment should not become due merely because the original calendar date arrived when the corresponding work did not occur.

Material delivery is another point that needs precision. Ask whether the shingles, underlayment, flashing and accessories delivered are the products named in your scope. Keys Roofing installs Atlas and Malarkey shingles. Whatever contractor you compare, the written proposal should identify the selected product rather than leaving you to rely on a color sample or spoken promise.

Compare the final payment trigger

The final balance is your practical leverage for getting the agreed work completed. Define completion before signing. Shingles being installed does not necessarily mean the entire contract is complete. The crew may still need to replace damaged screens, collect nails, reinstall downspouts, finish flashing, clear the driveway or complete permit requirements.

St. Louis County contains many municipal permit desks, and requirements are not identical from one city to the next. Ask who determines whether a permit is required, who obtains it and whether final payment waits for an inspection or closeout when the municipality requires one. The answer belongs in the contract, especially if one bidder includes permit costs and another does not.

Do not treat a walkthrough as a ceremonial last step. Walk the property in daylight. Look at the roof from the ground, check siding and window screens, inspect the driveway and landscaping, and ask to see photographs of areas that cannot be viewed safely. That includes valleys, chimney flashing, pipe penetrations, vents and any decking replaced during the job.

What it costs

A payment schedule does not change the contract total, but it changes when your money becomes exposed. That distinction matters if a delivery is delayed, weather stops the work or the written scope changes after tear off.

Compare these figures for every bidder:

  • The total contract price.
  • The deposit in dollars, not only as a percentage.
  • The amount due before installation starts.
  • The amount due at each measurable stage.
  • The balance retained until the written scope is complete.
  • Permit fees, disposal charges and delivery charges.
  • Unit prices for work that cannot be confirmed before tear off.

Decking is the common example of an unknown cost. A contractor may not see every soft or deteriorated sheet until the shingles and underlayment are removed. The proposal should state a price per sheet or another clearly defined unit. It should also explain how replacement is documented. Photographs and a count of removed sheets give you something concrete to compare with the invoice.

Older St. Louis houses may have plank decking rather than modern sheet decking. Gaps, broken boards or previous alterations can change the work required. The contract should explain how plank repairs are priced instead of applying an unexplained charge after the roof is open.

Ventilation changes can also move the number. Adding intake at the eaves, replacing exhaust vents or correcting an unbalanced system is separate from laying shingles. This can matter on a house with hot upstairs rooms or ice damming at the eave. Ask whether ventilation work is included, optional or excluded, and make sure each roofer is pricing the same work.

Do not accept an open ended allowance if a unit price would work. If the contractor cannot know the final quantity, the rate can still be known. A written rate lets you approve necessary work without guessing what the final invoice will contain.

Changes should be written before the bill changes

A change order should identify the condition found, the work proposed and the added or reduced price. It should be approved before the extra work proceeds unless immediate action is needed to keep the building dry or safe. The contract should say who can approve a change and how that approval is recorded.

Ask what happens when the change reduces the work. If a listed item proves unnecessary, the same change process should show the credit. A fair comparison includes additions and deductions, not just a mechanism for increasing the price.

What to ask

Use the same questions with every roofer. Consistent questions make evasive answers easier to notice.

  1. How much is due when I sign? Ask for the dollar amount and what that payment reserves or purchases.
  2. What must physically happen before the next payment is due? The contract should connect money to a visible stage of work.
  3. Who owns materials delivered to my property? Ask what happens to paid materials if work cannot proceed.
  4. How are decking and other concealed conditions priced? Request unit prices and photographic documentation.
  5. What remains unpaid until completion? Confirm that cleanup, agreed corrections and required municipal closeout are part of completion.
  6. Will I receive lien paperwork? Ask what releases or waivers will be supplied by the contractor and relevant suppliers or subcontractors, and at which payment stages.
  7. How are changes approved? Require a written description and price before authorizing extra work.
  8. What forms of payment are accepted? Ask about processing fees, financing terms and whether any discount depends on a particular payment method.

Lien paperwork deserves a direct conversation. Paying the contractor does not automatically prove that every supplier or subcontractor has been paid. Ask the contractor to explain the documents you will receive with progress payments and final payment. If the language is unclear or the amount is substantial, have a Missouri attorney review it before you release the last funds.

Ask for a receipt after every payment. The receipt should identify the project address, payment date, amount, method and remaining contract balance. Keep it with the signed proposal, change orders, product information, permit records and completion photographs.

Be cautious if someone pressures you to pay immediately because a crew happens to be nearby, a material price supposedly expires that afternoon or a slot will disappear while you read the contract. A real scheduling issue can be stated in writing with a clear expiration date. You should still know exactly what your payment buys.

For a side by side review of a roofing proposal and its payment stages, call Keys Roofing at (314) 220-2333. Have the complete written proposal available, including exclusions, unit prices and the page that states when each payment is due.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection