Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

The Hill Roof Bids: Ask Each Roofer Who Carries the Materials Up the Stairs

On a Hill lot, the stairs decide how shingles reach the roof, so compare each roofer's haul plan before you pick a start week.

A roof bid on a Hill lot gets compared on price first, but the stairs are where the job slows down. Shingles arrive on pallets, tear-off debris leaves in buckets or a chute, and every trip up or down a flight of stone or concrete steps is labor that someone pays for, whether the bid names it or not. This page is for the homeowner who has two or three written bids on the table and needs one specific fact: how each roofer plans to move material between the street and the roof.

Many homes in this part of south St. Louis sit on steep lots with front stairs, side stairs, or a rear path that runs past a garage. Some have narrow side yards where a pallet jack will not fit. Others have stone walls that hold the grade, and the wall itself becomes part of the roof plan. A bid written for a flat driveway and a truck at the curb may look fine on paper and still leave the crew carrying bundles by hand for most of a day.

Roofer comparison

Start by putting the three or four questions below in the same order for every roofer. Write each answer beside the question it answers. If one roofer answers with a general phrase like "we'll handle it," note that as a blank. A blank is not a yes.

  • Where the shingle pallet lands. Ask whether the pallet will sit at the curb, on the drive, on a tarp in the side yard, or on the lawn. Ask how far it is from the foot of the first stair.
  • How material goes up. Ask whether the crew will carry bundles by hand, use a hoist or a rented material lift, or use a ladder hoist at the eave. Each method changes how many people are on the stairs at once.
  • How debris comes down. Ask whether tear-off debris goes into a chute, into buckets carried down the stairs, or into a dumpster placed where the crew can reach it. Ask where the chute or dumpster will sit relative to your front walk and any neighbor's fence.
  • Who protects the stairs. Ask whether the roofer will lay plywood, rubber mats, or boards over steps and landings, and who removes them afterward. Ask what happens if a stone step chips or a railing bends.

Compare the answers the way you would compare the shingle line. A roofer who names the pallet spot, the hoist method, the debris route, and the stair protection has given you a plan you can check on roof day. A roofer who says the job will be done with a standard crew and leaves the route unstated has left the work to the crew's judgment on the day, which is when the stairs get tested.

Also compare the people. Ask each roofer how many crew members will be carrying material at the same time, and whether any of them will be on a ladder while another is on the stairs. Two people on a narrow flight with a bundle each is a different day from four people on the same flight with ladders and buckets. The number should appear somewhere in writing, even if only as a line in the crew plan.

What it costs

Hauling costs money whether it is written as its own line or folded into labor. Some bids price material handling as a separate allowance, some include it in the per-square rate, and some leave it out and bill it later as a change order. None of those is wrong on its face, but the three bids will not compare cleanly until you know which one each roofer used.

Ask each roofer to show you where the haul cost sits. If it is inside the labor rate, ask how many labor hours the bid assumes for carrying material. If it is a separate line, ask what unit it is priced by: per trip, per bundle, per pallet, or per day. If the bid says nothing, ask in writing whether there is a charge for carrying material up or down the stairs and what that charge would be on a typical day.

Ask about protection costs too. Plywood, mats, and temporary railings cost money, and some roofers bring them as part of their standard setup while others rent them for each job. The cost of a cracked stone step or a bent rail is not in the bid at all unless the roofer has written down who pays for it. Do not assume that the crew's insurance or the roofer's general responsibility covers damage to your property unless the bid or contract says so in plain words.

Missouri law (RSMo 407.725) bars a roofing contractor from representing or negotiating a homeowner's insurance claim, and from saying anything about paying, waiving or covering a deductible. If a roofer offers to "take care of" a stair repair through an insurance claim, that is outside what a contractor may say. Keep stair damage on the roofer's written scope and handle any insurer questions yourself with your own insurer.

A useful test is to ask each roofer for the total estimated cost of getting material to the roof and debris off it, written as one number with its assumptions listed beneath it. Two bids with the same headline price can differ by a full day of crew time once the haul is counted, and that day shows up as a cost in the final bill even when the bid did not name it.

What to ask

Ask each roofer these questions in writing, in the same words, and keep the replies in one folder. If a roofer answers by phone, ask them to confirm the answer by email or text so the reply has a date on it.

  1. Where will the shingle pallet sit, and how many steps or feet will the crew carry each bundle?
  2. Will material go up by hand, by hoist, or by a ladder method at the eave?
  3. Will tear-off debris leave by chute, by bucket down the stairs, or by dumpster, and where will that container sit?
  4. Which stairs, landings, and walkways will be covered, and who installs and removes the protection?
  5. Who repairs a cracked step, a loose railing, or a damaged walk if one happens, and how do you report it on the day?
  6. How many crew members will be carrying material at the same time?
  7. Does the bid include a separate haul charge, and if so, what unit is it priced by?
  8. What happens to the haul plan if the weather turns or a neighbor's car blocks the curb on the morning of the start?

Pay close attention to the last question. A Hill street can fill with parked cars on a weekend, and a shingle delivery that cannot reach the curb will sit on the truck or be unloaded at a less convenient spot. The roofer who has already thought about a backup spot can say so in one sentence. The roofer who has not will ask you to decide on the spot.

Keys Roofing can be reached at (314) 220-2333 if you want to ask the haul questions by phone before you write down the answers. Whichever roofer you choose, ask for the haul plan in the written scope, with the pallet spot, the carry method, and the debris route named on the page. A plan you can read on paper is one you can hold the crew to when the first bundle comes off the truck.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection