Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

The First Rain After a New Roof: Ask Each Roofer Who Checks It

Each roofer should say who walks the roof after the first hard rain, how that visit is recorded, and who pays if water shows up.

The first hard rain after a new roof tells you more than the brochure does. Water runs over fresh shingles, finds the spots where a flashing sits a little high or a nail stands a little proud, and shows up on a ceiling if the crew missed something. In St. Louis that first test often comes from a spring storm or a late fall front that drives rain sideways across the rake edges and into the valleys. Before you choose a roofer, ask each one a short set of questions about that first rain. The answers are easy to compare and hard to invent after the fact.

Roofer comparison

Ask every roofer the same three things: who walks the roof after the first rain, how that visit gets written down, and who you call if water appears before that walk happens. A roofer who answers with a name, a window of days, and a written record is giving you something you can check. A roofer who says the crew always takes care of its customers has not answered the question. Write each reply beside the question it answers, so you can see at a glance whether the answers line up.

Pay attention to whether the roofer names a person. A foreman who walks the roof is different from a salesperson who says someone will come by. The foreman has seen the flashing go in and knows where the seams were checked. The salesperson usually has not. If a roofer cannot say who will be on the roof, ask who signs the visit record and whether you receive a copy.

Ask about timing too. Some roofers plan a walk within a few days of a heavy rain. Others wait until the next scheduled visit, which may be weeks away. Neither approach is wrong on its face, but the gap matters if your ceiling is stained on a Tuesday night. Get the timing in writing before the crew leaves the lot.

St. Louis adds its own conditions. Freeze and thaw cycles lift starter strips and loosen nail heads along the eave, and a rain that follows a hard freeze can show problems that a dry week never would. Ice damming at the north eave can push water back under the shingles even when the roof itself is sound. A roofer who understands local weather will ask whether your first big rain comes before or after a freeze, because the answer changes what the walk should look for.

What it costs when nobody owns the check

The cost of a missed leak is rarely the trip itself. It is the wet drywall, the stained trim, the damp insulation in the attic, and the days you spend moving furniture and calling people. Each of those costs lands on you unless the roofer's paperwork says otherwise. That is why the question of who owns the first-rain visit belongs in the comparison, next to price.

Ask each roofer whether a return visit for water that appears after the final walk is included in the contract, billed as a warranty visit, or billed as a paid service call. Some roofers separate these clearly. Others leave the question open, which means the first answer you hear at the door may not be the answer you get in writing. Compare the three replies on paper. A blank line on the form is also an answer.

Keys Roofing documents damage, puts a written scope with photos and measurements in the homeowner's hands, and attends as the contractor on the job. When it comes to a leak after completion, the same rule applies to every roofer: the written record decides what was done, when, and by whom. Ask for that record before the rain arrives, not after the stain appears.

One more point belongs in the comparison. If water shows up and the homeowner has an insurance claim open or a new one planned, the homeowner deals with the insurer directly. Missouri law (RSMo 407.725) forbids a roofing contractor from representing or negotiating a homeowner's insurance claim, and from saying anything about paying, waiving or covering a deductible. A roofer who offers to handle the insurer side is stepping outside the law, so note that offer in your comparison sheet and treat it as a red flag.

What to ask

Use these questions on every roofer you are comparing. Write the answer down the same day you hear it.

  1. Who walks the roof after the first heavy rain, and what is that person's title?
  2. How many days after a reported leak does that walk happen, and is the day written into the contract?
  3. Will you receive a dated written record of the walk, with photos of the flashing, valleys and nail lines?
  4. Is a return visit for water found after final walk included, billed as a warranty visit, or billed as a paid service call?
  5. Who do I call first, and what number reaches a person rather than a voicemail?
  6. Does the crew check the attic for moisture on that walk, or only the roof surface?

If a roofer answers all six in plain words and puts the answers in writing, you have a basis for comparison that no sales pitch can change. If a roofer answers some of them and skips the rest, the skipped questions are the part to weigh most heavily. Keys Roofing can be reached at (314) 220-2333 if you want to put these questions to the office directly before you decide.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection