Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Test Each Roofer's Permit Answer Against the Public Record

The permit on a roof job is public, so test each roofer's answer about it against the record before you compare prices.

When two roofers give you a price, the permit is one of the few places where their answers can be checked against something outside their own paperwork. A roofer who says the permit is pulled, passed and closed is making a claim you can look up for yourself. A roofer who says the permit will be handled later is making a different claim, and it is one you should write down with a date. This page covers how to compare those answers before you pick a crew, and how to read the public record without needing anyone's help.

Roofer comparison

Missouri does not license roofers at the state level, so there is no state register where you can check a company name. What a St. Louis homeowner can check is the permit record for the address. Depending on where the house sits, that record is kept by the city building division, a municipal office in a county suburb, or the St. Louis County permit desk. Each office has its own search. Some post records online, and others need a phone call or a visit to the counter. Ask each roofer which office will issue the permit, then search that office yourself before the second visit.

Compare three things on the record. The first is the applicant name. If the applicant is the roofer's company, that matches the bid. If it is a different name, there may be a simple reason, such as a parent company or a licensed subcontractor, but you should ask for the reason in writing. The second is the status: an open permit, a passed inspection, or a closed permit with a final date. The third is the scope the permit describes, such as a full tear-off, a re-roof over an existing layer, or a repair. If one roofer calls the job a full tear-off and the permit describes a patch, the two documents do not agree, and you need to find out which one is right before the crew is booked.

Keep the search results in the same folder as the bids. Save or print the record with the date you looked at it. A permit status can change after you search, so a dated copy shows exactly what the office showed on that day. If the record shows nothing at all for the address, that is also worth noting. It can mean the roofer has not filed yet, or that the work is being done under a different address or parcel, and each of those needs a different question.

Spring and fall are busy seasons at permit desks across the metro. A permit that sits in review for two weeks in March can push a start date into a wetter stretch of April, and a hard freeze in late November can stop a crew that was ready to go. When you compare roofers, put each one's expected permit issue date beside its expected start date, so the gap between them shows up in days.

What it costs

Permit fees are set by the office that issues them. They can depend on the job value, the scope, or both, and they are not the same from one municipality to another. Fees can also change between the estimate and the day the permit is pulled. For that reason, a bid that says permit included should name the office and the fee it assumes. A bid that says permit at cost should say who pays if the fee moves before the pull.

Some offices charge a separate plan review fee on top of the permit fee. Some charge again for a re-inspection if the first final inspection does not pass. Those lines are easy to miss because they sit outside the roofing price and often appear on a different page of the paperwork. Ask each roofer to list every permit-related charge in writing, with an amount or a stated basis for the amount, and ask whether each one is inside the total you are comparing or added after it.

There is also a cost to waiting for a permit. If one roofer's permit is still in review and another roofer's permit has already issued, the two bids are not on the same calendar, even if the prices look alike. A later start can mean a higher material price if the shingle order has to be placed again, and it can push the job into weather the first roofer would have avoided. A lower price does not save money if its start date sits three weeks behind the bid it was compared against.

Keys Roofing can be reached at (314) 220-2333 if you want to ask how it files permits for a particular address. Keys installs Atlas and Malarkey shingles only. Where a permit form asks for a roofing material or product, that entry should match the product named in the bid, and you can check the match yourself once the form is in your hands.

What to ask

Ask each roofer these questions in the same order, and write the answers beside each other on one sheet:

  1. Which municipal office will issue the permit for this address?
  2. Whose name will appear as applicant on the permit?
  3. What scope will the permit describe, and does it match the bid line for line?
  4. When did the last permit your company pulled in this jurisdiction reach final inspection?
  5. Who pays a plan review fee or a re-inspection fee if one is charged, and is it inside the total?
  6. When will the permit be issued relative to the start date you are considering?

Then search the record yourself. If the roofer's answer and the record say the same thing, that is one point in favor of the answer. If they differ, call the roofer back and ask for the reason in writing. The reason matters as much as which side turns out to be right, because it shows whether the roofer knows how this particular office processes a roof permit.

Two more questions usually separate the answers quickly. Ask whether the office requires an inspection before new material covers the deck, and who schedules that call. Ask also where the permit card will hang while the crew works. A roofer who has pulled permits in the county will answer both without looking anything up. A roofer who needs to check first is giving you useful information about how familiar they are with the local process.

Where the record and the bid disagree

A mismatch between the bid and the permit is not always a sign of bad faith. Estimates are often written before the measurement is final, and the permit application is sometimes filed from an earlier draft. The question is whether the roofer knows about the difference and says so. If the permit lists a larger scope than the bid, ask which one the crew will follow and whether the bid will be revised in writing. If the permit lists a smaller scope, ask whether the bid is priced for work the permit does not cover, which can leave a gap if the office later asks for more.

Missouri has no matching statute that settles how a permitted roof must match the existing one. Any question about matching shingles turns on the policy wording rather than a state rule, and a permit does not answer that question. Keep it separate in your notes.

Write the answers down before the second visit, and bring the printed record with you. Then compare the answers on the same sheet, one row per question, with the roofer's name at the top of each column.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection