Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Teenagers on Roof Day: Ask Each Roofer Who Supervises Them

A teen who wants to watch the crew needs a named adult and a written rule from each roofer, so compare the answers before you pick a start week.

A teenager at home on roof day is not a small child who needs a sitter, and is not a visitor who needs an escort. Many St. Louis households with a teen have a plan for school, practice and phone time, but a roof job puts a crew on the house for several days. A teen who wants to watch from a second-floor window, or who stands in the side yard to see what the trucks are doing, can end up closer to a ladder or a pallet than anyone intended. The question is simple: who is responsible for that teen while the crew works, and what does each roofer say the crew will do about it?

A teen is usually old enough to understand a rule and young enough that the rule will get tested. The roof crew does not need a teen's permission to be on the property, and the teen does not need the crew's permission to watch. The gap between those two facts is where a fair comparison between roofers begins.

Roofer comparison

Each roofer will answer the question differently, and the difference is the thing to record. Some will say the crew stays on the roof and the homeowner keeps the teen indoors. Others will say the crew lead speaks to the adult in charge at the start of the day and again at the end. Some will not say anything until asked directly. Write down the answer each roofer gives, in their own words, and set it beside the others.

Keys Roofing can answer the question in writing before a crew arrives. The office number is (314) 220-2333, and the question belongs on the pre-start call with the arrival window and the parking plan. A written answer is more useful than a spoken one because the homeowner can hand it to whoever is home that day, whether that is a grandparent, a sitter, or the teen. A spoken promise made in the driveway is hard to check three days later.

Compare these points across every roofer you are considering:

  • Who the crew lead speaks to on arrival, and whether that person is named in writing
  • Where the crew expects the teen to be during tear-off, and whether that area is clear of the nail gun and saw hours
  • Whether the crew stops work if anyone enters the drop zone, and who calls the stop
  • What happens if the teen offers to carry bundles, hold a ladder, or climb onto a low section of the roof
  • Whether the crew will confirm by text or call that the lot is clear at the end of each day

A vague answer such as "we keep everyone safe" does not give you a comparison point. Ask what the crew does, not what it intends. A roofer who says the crew will not allow anyone on the roof, will stop work on any approach to the ladder, and will call the homeowner before the first nail is driven has answered the question. A roofer who says the topic has not come up before has also answered it, and the comparison should record that plainly.

What it costs

A supervision plan usually costs nothing in dollars. The cost is in time and in the schedule. A homeowner who wants a parent home for a full roof day, or who needs to arrange a sitter for part of it, should know that before the start date is set. Ask each roofer whether the crew can work around a teen's school hours, and whether a quieter start or an early finish is built into the bid or simply assumed.

If a roofer says the crew can start an hour later at no charge, get that in writing. A later start can move the finish date and the number of hours counted on the job, and those changes can show up later as a schedule question rather than a price question. Ask what the crew bills for a day that stops early because a teen needs a ride or because the adult in charge has to leave.

Ask, too, whether a rule set on the morning of the job will change the work plan. Suppose a teen has friends over that afternoon and the homeowner wants the staging moved to the back yard. That move can change the crew's route, the dumpster placement and the hours. Ask each roofer what happens to the bid when a change like that comes up mid-day, and whether the answer is a written change order or a verbal promise. A verbal promise does not show up on the final invoice, which means it does not show up anywhere the homeowner can check later.

What to ask

Use the same questions for every roofer, in the same order, and keep the answers in one place. Here is a short list to start with.

  1. Who is the crew lead on your roof, and what is that person's mobile number for the day?
  2. Where will the crew stage materials, and can anyone standing at a window see the staging area?
  3. What does the crew do if someone enters the drop zone, and who calls the stop?
  4. Will the crew allow a teen to help with any task, and what is the rule if they do?
  5. If a teen is alone at home during tear-off, what does the crew change about the day?
  6. Who does the crew call if a teen is hurt on the lot or leaves the house without telling an adult?

Set the answers side by side on one sheet. Where two roofers answer the same question in opposite ways, note the difference and ask the second roofer to explain the first one's answer back to you. If a roofer cannot restate another roofer's answer in their own words, that tells you something about how the crew will handle a question on site.

Some St. Louis families split the day around school. A teen leaves for the bus in the morning and walks home in the afternoon, and the roof crew works through that window. The roofer's plan should say what the crew does during the bus hour, when a teen may walk past the lot with earbuds in and no attention on the trucks. Compare how each roofer handles the crew's stop time, and whether the crew clears the walk and the curb before the bus arrives. If the teen is walking home alone, ask whether the crew will tell the teen anything at all, or whether the rule applies only to the crew.

Write the teen's name nowhere on the bid. The bid needs the adult responsible, the crew lead's name, and the plan for each hour of the day. The teen's own routine belongs on the household calendar, and the roofer's written plan should fit around it.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection