Supplier Run Billing: What Each Roofer's Bid Leaves Out
Supplier runs, counter waits and loading trips can land on your bill, so ask each roofer which ones get charged and how they are written down.
Ask a St. Louis roofer what a bid includes and most will say the shingles, the underlayment, the tear-off and the dumpster. Fewer will say where the crew stops for supplies. A roof job rarely runs in one trip. Shingles come from a supply counter, nails and sealant come from a second run, and a missing flashing piece can send a truck back across town before lunch. Each of those trips costs time, and some roofers bill them by the hour, some fold them into the labor rate, and some never mention them at all. This page is about how to compare those answers before you sign, so the number you choose is the number you actually end up paying.
Why the supplier run belongs in the comparison
The supplier run is the trip a crew takes to pick up material that was not delivered to your house. In St. Louis that usually means a counter at a roofing distributor, an industrial supply store or a lumber yard that stocks plywood and fasteners. Some crews order everything for delivery on the shingle truck. Others pick up small items the same morning because a delivery window was missed or a color was short. Both choices are normal. The difference shows up on your invoice, and it shows up in the day count.
Supply counters keep set hours. A counter that closes at five cannot restock a crew that ran out at four thirty, so a missing box of drip edge can stop a crew for a full afternoon. If that happens on a job with an open roof, the exposure gets longer. A bid that says nothing about supply trips leaves you guessing about how many of those days the crew will lose and who pays for them.
The question is not whether a roofer makes supply runs. Every roofer does. The question is whether the bid names the runs as a line, folds them into a rate, or leaves them out, and whether each answer is written where you can find it later.
Roofer comparison
Put each roofer's answer on one sheet with four columns: billed separately, included in labor, not mentioned, and written as a delivery condition. Do this the same day you receive the bid, while the sales conversation is still fresh. Blank cells matter. A roofer who does not mention supply runs has not told you they are free.
Look for specifics. "Supply runs are included" is a claim. "Up to two counter trips per roof day are in labor, and any third trip is billed at the hourly rate listed on page two" is an answer you can check. The second version tells you the limit, the rate and where to find the number. If one bid gives you the specific version and another gives you the general version, the specific one is easier to compare, even if the general one looks cheaper on paper.
Also ask whether the same crew makes the runs or whether a helper does. A helper's time may be billed differently from a lead installer's, and some bids list a crew hour rate that covers only the lead. Ask each roofer which person is on the truck during a counter trip and who signs off on the hours.
What it costs
Supply trips show up in three places on a roof bid. The first is a line item, often labeled material handling, mobilization, or supply run. The second is a per-hour charge on a change order, which appears only after the crew has already made the trip. The third is the labor rate, where a supply trip is part of what you pay per square and nobody prints the number separately. Each place can be fair. Each place also makes the total harder to compare.
When a line is printed, check the amount against the number of trips you expect. If a roofer quotes a flat charge for supply handling, ask how many trips that flat charge covers. If the answer is one, a seven-day roof will need more than one. If the answer is unlimited, ask where that is written.
When the trip is billed by the hour, ask for the rate and the minimum. Some bids charge a minimum block of time even for a ten minute errand. A ten minute counter run billed as a one hour minimum can add more to your bill than the nails it bought.
When the trip is folded into the labor rate, ask the roofer to say which part of the rate covers it. A labor rate per square should be explainable. If the roofer cannot tell you what share of the rate is supply handling, you cannot compare that rate to another roofer's rate on the same square count.
There is also the cost of waiting. A crew that stops for a missing item and loses a half day may ask for an extra day on the schedule. Ask each roofer whether a stopped crew adds days to the calendar, whether those days are billed, and how the new end date is confirmed in writing.
What to ask
Use these questions with every roofer on your list. Keep the wording the same so the answers line up.
- How many supply runs does your bid assume for this roof, and where are they?
- Which supply counter will you use, and what are its weekday and Saturday hours?
- Is each run billed separately, included in labor, or included in a flat handling line? Point to the line in the bid.
- What is the hourly rate for a supply run, and is there a minimum time block?
- Who makes the run, the lead installer or a helper, and is that person's time on the bid?
- If the counter is closed when the crew needs an item, what happens to the day, and who decides the new start?
- Do you keep a written log of each run with a time and an item list, and can I see it at the closeout?
- If a run is needed because your order was short, who pays for the run and who calls the supplier?
Write down each answer with the date. A verbal answer on the phone counts for less than the same answer in an email or on the bid. If a roofer answers one question in writing and another only by phone, note that difference on your sheet.
Ask the last question twice, a week apart. The second answer should match the first. If it shifts, the roofer may not have a firm rule, and that is useful to know before you sign.
Writing the trips down
Supply runs are easy to forget once the roof is on. Ask each roofer for a copy of the run log at closeout, with the date, the time out and back, the item bought and the amount. A short log lets you check the invoice line by line. A missing log means the invoice has to be trusted without checking.
If you want a second check, count the bundles and boxes on delivery day and compare them against the bid. Those counts will not show every trip, but they show whether the material arrived in the order the bid assumed. A short delivery is one reason a crew makes an extra run.
For questions about any bid, you can call Keys Roofing at (314) 220-2333. Ask for the supply run line, the hourly rate for a run and the log format, and write the answers down next to the other bids on your sheet.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.