Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Summer Sun on a St. Louis Roof Crew: What Each Bid Should Say

Each roofer should say in writing who supplies the crew's shade, water and sun protection on a hot St. Louis roof day.

A St. Louis roof day in July can start with a crew standing on hot shingles by seven in the morning. The deck holds heat long after the sun is up, and the crew spends the hours bent over, carrying bundles up a ladder and working in the same sun that is baking the roof around them. Sun protection, shade and drinking water are not extras on a roof job. Each roofer has a way of handling them, and much of that way never shows up in the price. Before you pick a start week, ask each roofer to write down who brings what.

Why the sun question belongs in the bid

Heat is already part of most roof plans, since crews stop work when conditions get dangerous. Sun protection is a separate question. It covers what the crew wears, whether a shaded spot exists on the lot, whether there is water that stays cold through the afternoon, and who restocks it when the jugs run low. A crew that carries its own water and hats on the truck is a different job from a crew that expects the homeowner to supply a hose and a shady porch.

The answer also tells you something about how the job is staffed. A roofer who has thought through sun gear for every person on the lot usually has a named person in charge of the crew's day. A roofer who says the crew will sort it out has not decided yet. Neither answer is a verdict on workmanship, but the difference shows up on the roof in August.

Roofer comparison

Put the same three questions to every roofer on your list, and write each answer beside the roofer's name. Keep the wording identical so the replies line up.

  • Who supplies sun protection for each person on the crew, and does it appear as a line in the bid or only in conversation?
  • Where does the crew get water on a roof day, and is the cooler filled by the crew, by the homeowner, or from a hose on your lot?
  • Is there a shaded spot for breaks, and where is it on your property?

A roofer who answers all three without pausing is usually describing a routine. A roofer who answers the first with 'we will see' has not settled it, and a decision made on the morning of the job is one you will be living with. Count the blank answers the same way you would count blank cells on any comparison sheet.

Ask for the answer in writing. A reply by text or email gives you a dated record you can read again in a week, when the start date has moved and the crew is no longer answering the phone as quickly. If two roofers give you different accounts of water on the lot, write both down and ask each one to explain the gap.

What it costs

Sun protection and water are small amounts in a roof budget. A case of bottled water, a box of sunscreen and a few brimmed hats do not move a roof total by much. The cost question is whether the roofer has priced them at all. If the bid is silent, the crew's supplies come from somewhere: the roofer's overhead, a cost the crew absorbs, or a request the homeowner gets when the cooler runs dry at two in the afternoon.

Ask each roofer which of these is true. A roofer who builds water and sun gear into the labor rate has a bid with no separate line for it. A roofer who bills it separately should name the line and the unit. A roofer who expects the homeowner to supply water should say so before the start date, because the homeowner's cost is the hose, the power for a cooler, and the time spent running to a store if the crew asks.

One cost does appear in the bid, and that is lost time. If the crew stops early for heat, the day gets shorter and the schedule stretches. Ask each roofer whether the bid assumes a full day on a hot afternoon or a shortened one. A bid that assumes full days in July is asking the crew to work through the heat, and that tends to show up later as a schedule slip rather than as a line item.

What to ask

Use these questions when you call or visit. Write the answers on a single sheet, one row per roofer.

  1. What does the crew carry on the truck for sun and heat, and who restocks it?
  2. Is the water supply priced in the bid, supplied by the homeowner, or left to the crew's own budget?
  3. Where on my lot will the crew take breaks, and is that spot clear of the drop zone and the staging area?
  4. Who on your crew makes the call to stop for heat, and who tells me when it happens?
  5. When a roof day shortens for heat, how is the lost time shown in the schedule and on the invoice?
  6. Do the crew's sun and water arrangements change if the forecast shows a multi-day heat stretch?

Ask the same questions in the same order to each roofer. A reply that comes back in one sentence is often enough. A reply that needs a paragraph to explain is worth reading twice, because it shows where the roofer has already thought through the problem.

If you want to check the answers against real work, ask each roofer for a recent job with a summer install and walk past the finished roof when it is safe to do so. You will not see the crew's water cooler, but you will see whether the cleanup and the lot look like a crew that was managed through a hot week.

You can call Keys Roofing at (314) 220-2333 and put the same questions to them that you put to anyone else. Use one sheet for every roofer you call. A roofer who answers the sun question clearly gives you a usable comparison point, whichever company you end up hiring.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection