
Sidewalk Cones and Signs: Compare Each Roofer's Plan for Roof Day
Compare how each roofer keeps cones, signs and the walkway clear on roof day, and get the answer in writing before the trucks park.
On roof day, the first sign of a crew is often not the trailer or the ladder. It is the line of cones, sawhorses and signs at the curb and along the front walk. Those pieces decide whether a mail carrier, a delivery driver, a neighbor walking a dog or your own visitor steps into the drop zone while shingles are coming down. Most roof bids say little about them. When two bids are otherwise close in price and scope, the way each roofer plans the walk is a fair thing to compare.
Why the walk matters on roof day
Tear-off sends nails, granules and pieces of old shingle into the yard, the driveway and the walk. Materials move from the trailer to the eave by hand or by conveyor, and that means bundles cross the sidewalk several times a day. A cone line is a cheap way to say the walk is closed for a few minutes. Without one, people keep walking, and they often do not notice the crew until they are standing under the ladder.
St. Louis adds its own problems. The freeze-thaw cycle cracks and heaves concrete walks, so a sidewalk that looked fine in October can have a lifted slab by March. A person carrying nothing can still catch a toe on it, and a person carrying a bag of groceries has less room to recover. Spring rain softens the parkway and turns the grass strip into mud. A crew that stacks bundles on the walk to keep them out of the mud has created a different hazard. Winter adds ice. When the crew arrives at seven in the morning, the walk may be glazed, and a roofer who takes responsibility for the walk should say whether sand or salt is part of the plan.
What each roofer should say out loud
When you talk with each roofer, ask for specifics. A vague answer such as "we keep the area clear" does not tell you what will be on your sidewalk at 9 a.m. on the second day. These are the points worth getting a direct answer on:
- How many cones, sawhorses or barricades will be set, and where each one goes.
- Whether the walk stays open during tear-off or closes, and for how many hours on a typical day.
- Who places the signs at the start of the day and who picks them up at the end.
- Whether a spotter stands at the walk when materials cross it, and whether that spotter is a crew member or a helper who may leave.
- What happens to the cones and signs if a storm front moves in before the crew leaves for the day.
- Whether the walk has a separate closure time for deliveries and for the dumpster exchange.
A roofer who answers each of these points has thought about the walk. A roofer who answers with one word has not, and the crew will make the decisions on the day with whatever is in the truck.
Where the answer should appear
A spoken answer is not a plan. A cone count given over the phone will be forgotten by the crew lead who arrives on the first morning. Ask that the walk plan be written into the proposal or into a short site note that you receive before the start date. The written plan should name the walkway or walks it covers, the count of cones and signs, the hours the walk is closed each day, and the person who sets and removes them.
If the roofer uses a different number or a different closure window on the job site, ask them to add the change to the written note before the next morning. A plan that changes without paper is hard to hold the crew to later, and it is hard for you to explain to a neighbor who was turned away from the walk.
Comparing two bids side by side
Put the two answers next to each other on one sheet. Suppose one roofer says, "cones at the front walk, a spotter during deliveries, signs at both ends of the block, all picked up nightly." Suppose the other says, "we keep the walk clear." The first is a plan you can check. The second is a hope. Look at how each roofer handles the start of the day and the end of the day, because the crew is most careless when it is tired and when the trailer is half unloaded.
Also ask who is responsible for the walk after hours. If bundles are left stacked near the curb overnight, the walk is still in use. Ask whether materials are staged on your property or on the street, and whether either roofer intends to stage anything on the public parkway.
Right-of-way and the public sidewalk
A sidewalk in front of your house may be public right-of-way, even though you maintain it. Placing cones or staging materials in a public street or on a public sidewalk can require a separate permission from the municipality. Permit desks across St. Louis County handle right-of-way questions in different ways, and the office that issued your roofing permit may not be the office that handles a sidewalk closure or a street-side staging request. Ask each roofer who pulls any right-of-way permission the job needs, whether that cost is in the bid, and how long it takes to get. A roofer who says that nothing is needed should be able to say why.
This is a question for the contractor, not for you to answer at the curb on the morning the trailer arrives. If the answer comes back as "we will figure it out," write that down and treat it as an open item in the comparison.
Who uses the walk on roof day
Think about everyone who will use the front walk while the roof is open. There is the delivery driver with a package at the door. There is the neighbor walking a dog past the house at the same hour each morning. There is a child heading to the school bus, a home health aide arriving for a visit, a friend coming to help with a move, and the meter reader who has no idea a roof job is underway. A cone line stops most of them from walking into the work. A sign helps the people who do not read cones. A person standing at the walk during the busiest hours does the rest.
Ask each roofer who watches the walk when the crew is busy on the roof and when a delivery arrives. Ask who tells a visitor where to go and what to do if a child runs toward the trailer. The answer will show you whether the roofer has planned for people who are not on the crew.
Weather, wind and the cones themselves
Cones and light barricades can blow across a yard in a spring wind, and a sign can tip over onto a parked car. Ask each roofer how the walk plan changes when wind picks up. Some crews stop tear-off in gusts and take the cones in before they leave, while others leave them out overnight. Both can be reasonable, but the answer should be specific. If rain is forecast for the next morning, ask whether the cones and signs are staged so they are not carried into the street or the neighbor's yard.
Freezing overnight temperatures can also matter. A roofer who plans to work in cold weather should say whether the walk surface will be sanded or salted before the first trip across it. That is part of the same answer, not a separate question.
What the walk plan costs
Cones, signs, a spotter and the labor to set and pick them up are all real costs, and they can sit inside the labor line of a roof bid or be left out entirely. Ask each roofer whether the walk plan is included in the price. If it is not included, ask what it would add, and ask who pays for any sidewalk cleanup that is needed after the roof is finished. A bid that leaves the walk out may look lower, but the difference may show up later as an extra charge or as a cleanup you have to arrange yourself.
Questions to put to each roofer
Use the same list with each roofer so that the answers can be compared on one page:
- How many cones, barricades and signs are in the plan, and where is each one placed?
- On which days and at which hours is the walk closed, and when does it reopen?
- Who sets the cones at the start of the day, and who picks them up at the end?
- Who handles any right-of-way permission if the cones or materials reach the public sidewalk or street?
- Who watches the walk during deliveries and during the dumpster exchange?
- Where do the cones and signs go overnight when wind or rain is expected?
- Is the walk plan included in the price, and is any sidewalk cleanup included at the end?
- Will the walk plan be written into the job papers before the start date?
If one roofer answers all eight with specifics and the other answers three, you have learned something about how the job will run before the first bundle is carried across the walk.
Getting the plan in writing from Keys
If you are comparing Keys Roofing with another contractor, call the office at (314) 220-2333 and ask how the walk plan would be written into your job papers. Ask the same eight questions above, and ask whether the answers would appear in the proposal you sign or in a separate site note. Keep the written answers with the rest of your roof file. The point is not to choose a roofer by the number of cones. The point is to have a clear, written answer about who is on your walk, when, and who is responsible when the crew leaves for the day.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.