Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Roofer Comparison: The Reply You Never Got

A missing answer from one roofer is still data. Here is how to log it, weigh it, and decide whether that roofer stays in the running.

You have three written bids on the kitchen table, and one roofer has not answered your second question. That gap belongs on the comparison sheet before you decide anything else. A roofer who replies the next day with a clear answer and a roofer who goes quiet for a week are giving you two different kinds of information, and both count next to the price.

Roofer comparison

Start with a simple log. For each roofer, write the question you sent, the date you sent it, the date of any reply, and the words the reply used. Keep it to one line per roofer. Do not write "slow" or "rude" in that column. Write what happened. If one roofer answered "we will check on that" on a Tuesday and sent nothing else by the following Friday, the Friday is the fact you carry forward.

A missing answer is not automatically a reason to drop someone. A busy estimator in St. Louis County may be on three or four measures in one afternoon, and a crew that is mid-job on another street may not reach a phone for a day. What matters is whether the roofer eventually answers the same question the same way, and whether the answer arrives in writing. A reply that comes by phone and never shows up in email is a reply you cannot hold them to later.

Compare the replies side by side. Put the question in the first column and each roofer's answer in the next column. If two roofers answer one question in two different ways, do not average them. Mark the difference and ask both roofers to explain their answer in writing. The roofer who gives a specific reason for a specific choice usually has done the work before. The roofer who says "it depends" without naming what it depends on has not told you anything you can check.

Pay attention to the questions that touch the parts of a St. Louis roof that cause trouble. The freeze-thaw cycle lifts starter strips and loosens nails along the eave, so ask what happens to an open roof if a cold snap arrives before the crew finishes. Hail season runs through spring and into early summer, so ask how the crew documents existing damage before the tear-off begins. Ice damming at the eave shows up in January, so ask who checks the ventilation and who answers if a leak appears in the first winter. A roofer who answers those three questions clearly is giving you the comparison you need.

Three-tab shingles raise a separate question. An older three-tab roof may be past the point where repairs make sense, and some roofers will recommend a repair they expect to be temporary. Ask each roofer directly whether a repair is the right call for your roof, what they expect the roof to look like in five years if you repair it, and what they would tell a neighbor with the same roof. The answers will differ, and the differences show you how each roofer thinks about the job.

What it costs

Compare totals only after you have compared what each total includes. Two bids can land within a few hundred dollars of each other and still describe different roofs. One may price tear-off and disposal. Another may leave disposal as an allowance. A third may list the underlayment by the roll and the next by the square. Before you read the bottom line, check the lines that move the number up later: permit fees, dumpster or haul-away charges, decking replacement, flashing, vent work, and any cold-weather or weekend premium.

Ask each roofer which line in the bid is the most likely to change once the crew is on the roof. Ask them to put that answer in writing. A roofer who names a specific risk and tells you how it is priced has given you a number you can plan around. A roofer who says nothing will change may still be right, but you will have no way to test that claim until the decking is open.

Permit costs vary by municipality and by how the job is valued. Some St. Louis County desks charge by the job value rather than the shingle count, so the fee on one bid can differ from the fee on another for reasons that have nothing to do with roofing skill. Ask each roofer who pulls the permit and what fee they used. Then check the fee against the public record at the desk that will issue it. A quote that uses the wrong desk or an outdated schedule will cost you time, and sometimes money, later.

Finally, ask whether the price is fixed, unit-based, or time and materials. A fixed price tells you what you will pay for the scope written down. A unit price tells you what each measured item costs, which helps if the deck turns out to be soft. Time and materials can be fair, but it is harder to compare, so ask each roofer for a rough ceiling and what would trigger a change order.

What to ask

Put these questions to every roofer, in the same words, in the same order. Keep the answers in one folder.

  1. Who will be on the roof each day, and who is the single person I call with a question on day three?

  2. What is the first thing your crew does on arrival day, and what do you need from me before it starts?

  3. If the deck is soft in one spot, how do you mark it, who sees the mark, and how is the repair priced?

  4. What happens to an open roof if rain or a freeze arrives before the work is finished?

  5. Which permit desk pulls the permit for my address, and what fee did you use?

  6. What is the single most likely surprise on my roof, and where in the bid is it priced?

  7. Who answers if a leak shows up in the first winter, and how quickly will someone come out?

Ask each question once and write the answer beside it. If a roofer answers a different question than the one you asked, write down the swap and ask again. A roofer who will not answer a direct question in writing has given you a comparison result, even without a price.

If you need to reach any of these roofers during your decision, the Keys Roofing office line is (314) 220-2333. Call it with the question from your log and ask for the answer in an email you can keep. Then update the line for that roofer. Your sheet should show the last reply you received, not the first one you remember.

When you have answers from every roofer you are still considering, look at the gaps before you look at the totals. The roofer whose reply you never got is still a roofer you can ask again. Send the question once more, date it, and note whether the second request brought anything back. That record will tell you more about how that roofer will handle your roof than any single price on the page.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection