Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Roof Week Power Outages: Ask Each Roofer How to Reach Them

A power cut during roof week can stop your furnace, your sump and the crew at once, so compare each roofer's answer before you sign.

A power cut in St. Louis does not wait for your roof date. Ice storms in winter and thunderstorms in summer both take lines down across the metro, and an outage in the middle of a tear-off can touch your house, the crew's tools and the phone line you use to reach the roofer's office. Before you choose a roofer, it helps to know what each one plans to do when the lights go out, because the answers differ more than most bids show.

What an outage touches in your house

Start with your own list. A sump pump in a basement that has just lost its roof cover will be working hard if rain follows the outage. A battery backup for the sump only lasts as long as its charge. A furnace blower stops in a cold snap, and a well pump stops the water. Garage door openers, a refrigerator, a medical device and a home alarm all depend on the same circuit as often as not. If a powered attic fan sits on a circuit that gets cut, the crew may be working in an attic with no mechanical ventilation until power returns.

None of this is a roofing question until the roof is open. Once the old shingles are off and the deck is exposed, a lost circuit can mean a lost sump, a lost heat source and a lost light in the attic all at once. Write down which circuits feed these items before the first day, and give the list to the roofer so the crew knows what not to unplug.

What an outage does to the crew

A roofing crew runs on power in several places. Cordless drills and saws charge from a truck or a generator. Nail guns usually run from a compressor, and a compressor needs either a power line or a gas engine. Some crews carry a generator, and some rent one for the day. Ask each roofer which of these applies to their own crew, where the generator sits on your lot and how its fuel is stored. The answer ties into the question of gas cans and compressors on your lot, which is a separate line in the comparison.

A crew that loses power mid-day may not be able to finish the course it started. That matters because shingles are laid in a set order, and a half-finished course left open overnight is a weather question, not only a power question. Ask each roofer what the crew does when the power drops during a course, and whether the crew stops or keeps working on a generator.

Roofer comparison

The useful comparison is the answer each roofer gives in writing, not the one you hear on a sales call. Set up a short list of questions and send the same list to every roofer on your shortlist. Keep the replies in one folder so you can read them side by side.

  • How does the office phone work during an outage: cell forwarding, a voicemail box, or a text line?
  • Who answers the phone on the day the power is out, and within what time?
  • Does the crew carry a generator, and if so, what size and where does it sit on the lot?
  • What does the crew do if power drops in the middle of a course?
  • Who tells you when the outage is over and the work restarts?

A roofer who answers all five in writing gives you something to hold them to. A roofer who answers only the first question, or answers with a general promise to be in touch, leaves the gap open. If you call the office line at (314) 220-2333 with these questions, ask the person who answers to put the reply in an email or a text, and keep the time and date of the call next to it.

Phone service is a separate matter from the power itself. Many offices now run their phones over internet service, and internet service goes down with the power unless a battery backup is installed. Ask each roofer whether the office phone runs on a line that survives an outage, and whether the answer is based on an actual backup or on a guess.

What it costs

An outage can cost time, and time on a roof job usually has a price. Ask each roofer whether crew hours lost to a power cut are billed, whether they are absorbed, or whether they move the completion date. Those are three different answers, and each one changes what you pay. A generator rental, a fuel top-up or a second trip to restart the job is a line item that may or may not appear in the bid. Ask for each one by name, and ask whether it is inside the total or added after.

Be careful with the words used in the answer. A roofer may say the outage is covered by the bid, or that it is covered by the weather clause, without saying what the clause means in money. Ask the roofer to show you the clause in the contract and to read the sentence aloud. If the answer depends on the cause of the outage, ask which causes count and which do not.

If an outage is tied to storm damage on your property, the insurance question belongs to you and your insurer. Missouri law (RSMo 407.725) forbids a roofing contractor from representing or negotiating a homeowner's insurance claim, and from saying anything about paying, waiving or covering a deductible. A roofer can document the damage, give you a written scope with photos and measurements, and attend as the contractor while you deal with your own insurer. Ask each roofer which of those they will do, and get the list in writing.

What to ask

Use the same questions with every roofer on the list, and log each reply with its date. The following are the ones that separate the answers most clearly.

  1. Which circuits on my property does the crew need to shut off, and which ones must stay on?
  2. Does the crew carry a generator, and where will it sit on my lot?
  3. What happens to an open roof if the power is out overnight?
  4. How does the office phone keep working during an outage, and what is the backup?
  5. Are crew hours lost to a power cut billed, absorbed, or added to the completion date?
  6. Where in the bid or the contract is the outage answer written down?

Ask these questions before you sign, and before the first shingle comes off. The answer you get in writing is the one you can hold each roofer to when the lights go out on a cold afternoon in the middle of a tear-off.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection