Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ridge Vent Sealant Gun: Ask Who Supplies It and Who Keeps It Working

A ridge vent seal depends on a gun, a tube and a cure window, so ask each roofer who supplies each one and where it is written down.

A ridge vent on a St. Louis roof is a strip of louvered or mesh vent that runs along the peak and lets hot attic air out. Where the vent meets the shingles, the crew cuts a slot along the ridge, lays the vent in place and seals the cut so wind-driven rain and snow stay out. That seal is made with roofing sealant, applied from a caulk gun or a pneumatic gun, and most bids never say who owns that gun, who pays for it, or how long the tube waits on the roof before it is used. Those details decide whether the vent stays dry through the first freeze. Before you compare totals, ask each roofer to name them.

This page is for a homeowner who has two or three written bids in hand and wants to know what the sealant line really covers. The answers below are the ones to get in writing, and they fit into the same comparison you are already making on shingles, underlayment and flashing.

Roofer comparison

Ridge vent work looks small on paper. It is usually one line or a short paragraph near the bottom of the scope, and two roofers can describe the same job in very different ways. One bid may say ridge vent installed. Another may say ridge vent with sealed cuts and cap nails. A third may say nothing about sealant at all and leave the crew to decide. The first bid is a product list. The second is a method. The third leaves a gap that someone will fill on the day the crew is up the ladder.

Put the three bids side by side and mark each one as stated, implied or missing. A line that says sealed is stated only if it names the sealant type or the product family. A line that says standard is implied, and you should ask what standard means for that roofer. A missing line is a question to send back in writing before you sign.

Keys documents this kind of detail on the written scope that goes into the homeowner's hands, with photos and measurements. Keys installs Atlas and Malarkey shingles only, so the ridge cap and vent specifics you compare should match the shingle system named on the bid. Any roofer who cannot tell you which shingle system their ridge detail belongs to is giving you an answer you will need to check later.

What it costs

The sealant itself is a small material cost, but the gun, the cartridges, the cure time and the labor to cut and seal the slot are real money. Some bids fold all of it into a ridge line priced per foot. Others list the vent as a separate item and the sealant as a material line with no price attached. Neither approach is wrong, but you cannot compare them until you know what each includes.

Ask each roofer whether the gun is owned by the company, rented, or charged back to the job as a tool cost. If it is a rental, ask whether that cost sits inside the bid or on a separate invoice. A gun that breaks on the second day of the ridge work and needs a same-day replacement should have a named payer before the truck leaves the yard.

Ask also whether the cure time changes the schedule. Sealant that has to sit for a set period before the crew can walk the ridge adds a hold point to the day. If that hold point is not in the bid, the roofer may be working from a plan that assumes the sealant sets while the crew moves on to the next slope, which can leave an unsealed slot exposed to an afternoon storm.

Why the cure window matters in St. Louis

St. Louis weather does not make sealant work easy. Early spring nights can drop below the point where most sealants bond well, and a warm afternoon can follow a hard freeze within the same week. Summer heat can skin the surface of a sealant bead before the inside has cured, which leaves a thin film that looks finished and fails at the first heavy rain. Fall brings cool, damp mornings that slow the cure and can leave moisture trapped in the joint.

Ask each roofer what temperature they treat as the minimum for ridge sealant work, and what they do when the morning is below that. Some crews hold the ridge until the afternoon. Others use a different sealant for cold work. Both can be fine, but the bid should say which one applies, and the homeowner should know whether the crew will call before changing the plan.

Ask also about the other side of the cure. Once the sealant is set, who checks it, and when? A roofer who checks the ridge at the final walk has a different record than one who checks it the next morning after the first overnight rain. Write down the answer, because it changes how you read the first storm after the roof is done.

What to ask

The questions below work for any roofer, and they are short enough to send by email so each roofer answers in the same order.

  1. Who owns the sealant gun used on the ridge, and is it rented or company property?
  2. If the gun fails mid-job, who pays for the replacement, and does the crew stop until it arrives?
  3. Which sealant product or product family goes into the ridge cuts, and is that named on the bid?
  4. What is the minimum temperature for sealant work, and what happens below it?
  5. How long must the sealant cure before the crew walks the ridge or sets the ridge cap over it?
  6. Who checks the ridge seal at the final walk, and does that check happen again after the first rain?
  7. Where are the unused tubes kept, and who takes them home or disposes of them?

Send the same list to each roofer and file the replies together. A roofer who answers the first question with a product name and the seventh with a clear storage answer has given you two more facts to compare. A roofer who answers only part of the list has also told you something, and you can note the gap beside the bid line it belongs to.

Write the answer down

Ask each roofer to put the ridge sealant answers into the bid, not only into a phone call or a text. If the answer is spoken, it does not bind the crew on the day the sealant is applied. The written scope is the document you will hold when the ridge leaks, and it is the one that tells the next roofer what was used.

If you need help reaching a Keys estimator to go over the ridge detail on your own roof, call the office at (314) 220-2333. Bring the written scope from your other bids, so the ridge line can be read against the same shingle system and the same cut method in each one.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection