The document

Read Each Roofer's Scope Aloud Before You Sign

Read the scope aloud with each roofer, line by line, to see which items are in the bid and which only sound like they are.

A written scope is the page that says what the crew will do on your roof, and most homeowners read it once, quickly, on a phone screen. Reading it aloud is a different exercise. When you say each line out loud to the roofer, or to the lead who will be on the ladder, the gaps show up in the wording itself. A line such as remove existing shingles down to the deck is easy to skim past. Said slowly to the person who will swing the bar, it raises questions that the page does not answer.

Set up the read-back before the visit

Ask for the read-back as a fixed part of the appointment, not a favor at the end. Tell the roofer that you want to go through the scope section by section, and ask who will be present. If the salesperson will not be on the roof, ask for the lead or foreman by name and ask whether that person can join the call or the walk. A scope that only the salesperson can explain is a scope that the crew may not follow.

Have the scope, the price sheet and a pen in front of you. Keep the scope in its final form, not a draft. If the roofer says a line will change, write down the new wording and the date. Do not rely on memory for what was said, because a roof job often runs for weeks and the first version of the scope may be the only one you have on paper when a dispute starts.

Plan to spend about thirty to forty minutes on a typical reroof. A shorter read-back usually means lines were skipped. A much longer one usually means the scope is loose and needs tightening before anyone signs.

The lines that deserve the longest reading

Some sections of a roof scope hold more of the risk than others. These are the ones to read slowly and ask about one at a time:

  • Tear-off. Ask how many layers are removed, whether the old shingles go into a dumpster or a trailer, and whether the crew will sweep the drive and the walks at the end of each day.
  • Deck repair. Ask how soft or rotten decking is found, who decides it needs replacing, and what it costs per sheet. A line that says replace damaged decking as needed is not a number yet.
  • Underlayment and ice barrier. Ask where the ice and water barrier goes, how far up from the eave it runs, and whether it covers the valleys and the wall flashing.
  • Drip edge and flashing. Ask which metal is used at the rake and the eave, whether step flashing is new or reused, and what happens at the chimney and any pipe boots.
  • Ventilation. Ask how the ridge and soffit vents are sized and whether any box vents are being added or swapped.
  • Cleanup and magnet sweep. Ask whether the yard gets a nail sweep after the tear-off and again after the install.
  • Warranty paperwork. Ask which warranty paper comes with the shingles and which comes from the contractor, and when each one is delivered to you.

What a good answer sounds like

A good answer is short and specific. The roofer names the item, says what will be done, and says where it stops. For example, a crew that answers the drip edge question well will say which metal profile it uses, where it is nailed, and whether it is installed under or over the underlayment at the eave. The answer does not need to be long. It needs to match the page.

When the answer matches the written line, make a small check mark beside it and move on. When the answer adds detail the page did not include, write that detail beside the line and ask for the page to be revised before you sign.

What a vague answer looks like

Vague answers are the signal to slow down. Watch for replies such as we always do it right, that is standard, or we will handle it when we get there. None of those answers says what the crew will do on your roof. Ask the same question again, in a different way, and ask for the answer to be written in the scope.

Another common pattern is the answer that moves the item into a separate line. A roofer may say the decking is covered by the price, then later say it is an allowance billed per sheet. Both statements may be true in the roofer's head, but only the written version counts. If the price depends on a decision made after tear-off, the scope should name who makes that decision and how the homeowner is told.

Ice, hail and the freeze-thaw questions

St. Louis roofs face specific stresses that belong in the read-back. Ice damming at the eave is common after a hard freeze, so ask how the ice and water barrier is carried up from the eave on your house and whether the roofer will extend it farther if the roof is low-slope or the eave is shaded. Freeze-thaw cycles open small gaps at the flashing and at old caulk lines, so ask how the crew will treat the wall flashing where it meets brick or siding.

Hail season matters too. If your roof was hit in a storm, ask how the scope records the damaged areas, how the photographs are labeled, and whether the crew will bring those photographs back to you. Keys documents damage, puts a written scope with photos and measurements in the homeowner's hands, and attends as the contractor. That is the standard to ask every roofer to meet, whether or not the job involves a claim.

Older three-tab roofs raise a different question. When the tabs are brittle enough that a repair cracks the shingles next to it, the scope should say whether the crew is replacing the whole slope or patching the area. Ask what happens if the crew lifts a shingle and finds the mat is too brittle to reuse. Good scopes say what changes in that case, and who approves the change.

Permits matter as well. Many municipal permit desks across St. Louis County ask for the permit number before work starts, and some expect the contractor to post it where an inspector can see it. Ask the roofer to name who pulls the permit, when it is pulled, and who schedules the inspections. Check the permit desk for your city before the start date is set.

Put every answer in writing

After the read-back, ask for a revised scope that includes every change. Do not accept a verbal summary as the record. Ask the roofer to send the revised scope by email, and compare the email to your notes line by line before you sign. If anything is missing, mark it and send it back with the question. A short written reply is better than a long call that nobody can find later.

Keep the notes with the scope, the price sheet and any photographs you took during the walk. Date each page. If you later need to show what was agreed, those pages are the record.

Comparing two or three scopes

When you read two or three scopes this way, line them up in the same order. Put the tear-off items together, then the deck, underlayment, flashing, ventilation and cleanup items. Where one scope has a line and another does not, write down the gap. A missing line is not proof that a roofer will skip the work, but it is proof that the page does not say the work is included.

Compare the answers, not just the wording. Two scopes may use the same phrase, such as replace damaged decking, while one roofer names the limit per sheet and the other leaves it open. The better scope is the one that gives you a number, a limit or a clear method for finding one.

If you have any doubt about a line, call the office at (314) 220-2333 and ask for the answer in writing. Keep the call short and specific, and ask the office to confirm the answer by email.

Questions to ask during the read-back

  1. Who will be on the roof, and who will answer questions on the day the work starts?
  2. How many layers are removed, and where do the old shingles go?
  3. Who decides whether decking is replaced, and how is that decision recorded for me?
  4. How far up the eave does the ice and water barrier run, and what covers the valleys?
  5. Which metal is used at the drip edge and the rake, and is it new?
  6. How is the yard swept at the end of each day, and again at the end of the job?
  7. Who pulls the permit, and when will the inspections be scheduled?
  8. Which warranty paper comes from the shingle maker, and which comes from the contractor?
  9. Can you send me the revised scope with every change included before I sign?

Read the scope aloud with each roofer you are considering. Ask the same questions of each one, write down the answers, and compare the pages before you decide who gets the job.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection