Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Read Each Roof Bid Cold, Two Days After the Sales Call

A bid that makes sense only on the sales call is unfinished, so reread each written bid two days later and log what you cannot answer.

A roof bid usually makes the most sense on the day the roofer walks the property and talks it through. That is also the day you are most likely to nod along. Two days later, when the sales call has faded and the bid is sitting on the kitchen table, the document has to stand on its own. If a line only makes sense because someone explained it out loud, the line is not finished yet.

This page is for the homeowner who has two or three written bids from St. Louis roofers and needs to decide which one to keep talking to. The test is simple. Set the bid aside for two days, then read it cold, the way a lender, a spouse or a tenant would read it. Mark every line you cannot explain in your own words. Then send each roofer the same list of questions and compare the replies.

Roofer comparison

Start with what each bid says about the roof itself. Look for the square count, the number of slopes, the pitch, the underlayment, the drip edge, the flashing and the vents. A bid that says "re-roof" without naming the tear-off, the deck repair allowance and the disposal is describing a result, not a job. Two bids can both say "re-roof" and still price different work.

Next, check whether the bid says what happens when the roof turns out worse than the first look. Ask about decking. A roof you can only see from the ground does not reveal soft sheathing until the old shingles come off. A bid that names a unit price per sheet of replacement decking tells you more than one that says "as needed" with no number. The same goes for rotted fascia, bad flashing at a chimney and a damaged valley.

Then read the exclusions. Every bid has a list of things it does not do, and the list is often in a smaller font or on the last page. Common exclusions in this area include gutters, interior ceiling repairs, electrical work near the eave, hauling of materials left behind, and permit fees. None of those is wrong to exclude. What matters is whether the exclusion appears in the bid or whether you only heard about it on the phone.

Missouri does not license roofers at the state level, so the bid itself is one of the few places where a homeowner can see what the contractor committed to. Keys Roofing puts a written scope with photos and measurements in the homeowner's hands at the end of the walk, and the crew works from that document. If a roofer offers to write a bid only after you sign, note that difference before you compare prices.

What it costs

Cost on a written bid should be easy to trace. Start with the total and then ask how it breaks down: materials, labor, disposal, permit, and any allowances. An allowance line is a number that is not yet a price, and two bids with the same total can hold very different allowances. Ask each roofer what the allowance covers and what triggers a change order.

Shingle choice moves the number. Keys installs Atlas and Malarkey shingles only, so a comparison with another roofer should match the product line and the grade before the totals are compared. If one bid names a shingle and the other says "architectural shingle" with no brand, you are not comparing the same roof.

Payment timing belongs in the cost review too. A bid that asks for a large deposit before materials are ordered is asking you to carry the first risk. A bid that ties each payment to a finished step, such as tear-off complete, deck inspected and final walk signed, is easier to check against the work. Read the schedule aloud and ask each roofer to say which step each payment follows.

Finally, check the arithmetic. Multiply the square count by the per-square rate and see whether the result matches the subtotal. Add the tax if it is shown separately. A small error on a single line is common and easy to fix, but if the total does not reconcile, ask for a corrected page before you go further.

What to ask

Ask each roofer to answer these in writing, in the same order, so the replies line up.

  • Which line in this bid would change first if the deck is soft once the old shingles come off, and at what unit price?
  • What is excluded from this bid that a homeowner would reasonably assume is included?
  • What does the allowance on the shingle line cover, and what starts a change order?
  • Which payment is due before any materials are ordered, and what is the amount?
  • Who on your crew will be the contact on each day of the job, and what number do I call?
  • Can you send a corrected page if any line does not add up to the total?

Send the same six questions to every roofer on your list and log the date each one answers. A reply that comes back the next morning in writing is useful. A reply that repeats the sales call is a sign the bid is not yet clear enough for you to compare.

Keeping the bids honest

Keep each written bid in one folder with the reply dates beside it. When you go back to a roofer two days later to ask about a line, compare what they say with what the bid says. If the answer changes, note the change. A bid that moves after the walk is not a finished bid, and you are entitled to ask for the version that was signed or sent.

Keys Roofing can be reached at (314) 220-2333 if you want the scope and photos sent to you in writing before you compare them with another bid. Bring your cold-read list with you when you call. The questions that remain after two days are the ones worth asking first.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection