Put Each Roofer's Start Date Side by Side and Count the Gap Days
Two roofers can sign on the same week and still mean different start dates, so compare the gap days between each bid's promise and the first nail.
Two roofers can give you a signed contract on the same week and still mean different things by the start date. One writes "week of October 14." Another writes "as soon as materials arrive." A third says "weather permitting" and stops there. Those three phrases are not the same promise, and the space between them is where a St. Louis roof schedule usually slips. This page gives you a way to line up the start dates from each bid and count the days that sit between what each roofer promised and the first shingle on your roof.
Roofer comparison
Start with the written date, not the verbal one. Ask each roofer to put three dates on the bid or contract: the day the crew is scheduled to arrive, the day the first shingle is expected to go down, and the day the job should be finished if nothing changes. Once you have those three dates from each roofer, you can count two gaps for each bid.
The first gap runs from the day you sign to the crew arrival date. This gap is mostly about materials, permits and the roofer's calendar. The second gap runs from the arrival date to the first shingle. This gap is about how much of the job is actually started on the day the crew shows up, and it is the one homeowners tend to overlook. A crew can arrive, set the dumpster, tarp the landscaping and still not nail a single course for two days if the deck needs repair or the permit has not been posted.
Write the counts in a column next to each roofer's name. A bid that promises a short first gap but a long second gap may still finish later than a bid with a longer first gap and a tight second gap. Keep the numbers in the same units. Use calendar days for every roofer, or working days for every roofer, but do not mix them in one column.
Where the gap days hide in St. Louis
In St. Louis the gap is often set by three things that have nothing to do with the crew. The first is the permit desk. If your roof needs a permit from St. Louis County or from the municipality where you live, the start date may wait on the permit being issued and posted. Ask each roofer who pulls the permit and whether the start date was set before or after the permit application went in. A roofer who says the permit is already approved should be able to show you the approval number.
The second is the weather window. Late fall and early spring in this region bring freeze and thaw cycles, and a deck that is wet or frozen cannot take underlayment or shingles well. Ask each roofer for the temperature at which they stop nailing, and the wind speed at which they stop working on the roof. If the bid assumes days that the forecast will not allow, those days will show up as gap days later. Write them down as separate lines so you can see them.
The third is material arrival. A shingle order that ships from a supplier two counties away can arrive on a different day than the one the crew expected. Ask each roofer whether the start date depends on a delivery and who confirms that delivery. A roofer who can name the supplier branch and the day the pallet is due is giving you a date you can check. A roofer who only says the materials are on order is giving you a date that can move without anyone telling you.
What it costs
A moved start date is rarely free. Some roofers pass the cost of a delay on to the homeowner through a standby charge, a re-mobilization fee or a rebooked crew day. Others absorb it and move the job to the end of their schedule without a charge. Neither approach is wrong by default, but you should know which one each roofer uses before you compare the totals.
Ask each roofer what a moved start date costs you, in writing. The answer should name the charge, if there is one, and say when it applies. For example, a roofer may charge nothing for a delay caused by weather but charge a fixed amount for a delay caused by the homeowner, such as a gate that is locked on the arrival day or a move-out that has not happened. Ask which delays fall into which group. If the roofer cannot say, the gap days are not yet priced.
Also ask what happens to your own calendar if the start slips. If you have arranged time off, a pet sitter, a delivery window or a tenant's access, a delayed start can cost you more than the roofer's standby line. Note those costs next to each bid so you can see whether one roofer's shorter gap saves you money once the rest of your week is counted.
What to ask
Ask each roofer the same four questions and write down the answers in the same order, so the replies can be compared line by line.
- What is the written arrival date, and what is the written first-shingle date, as separate dates on the contract?
- Which permit is needed for this job, who pulls it, and does the start date wait for the permit to be posted?
- What temperature and wind speed stop the crew, and how many days in the bid are set aside for weather?
- If the start moves, what is the charge, who is responsible for the delay, and how is the new date confirmed in writing?
Compare the answers, not the tone of the call. A roofer who gives you a specific date, a named permit and a stated weather limit has given you something that can be checked on the day. A roofer who gives you a range and says the rest will be sorted out later has left the gap open, and the gap will be yours to carry.
Once the answers are in, go back to the three dates on each bid and recount the gaps. If two roofers are close on the total and one has a much longer second gap, ask that roofer to explain why the first shingle is set so far after the crew arrives. The answer may be reasonable, such as a deck repair that has to be inspected first, but you should hear it from the roofer rather than find it out on the roof.
If you want help putting the start dates and the gap counts on one sheet, or if you want a written answer on the permit, the weather limit or the delivery window before you choose, you can call Keys Roofing at (314) 220-2333 and ask for those three items by name. Ask for the answers in writing, and file them with the bid so the dates travel with the paperwork.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.