Ozone Action Days and Wildfire Smoke Need a Stop Call in Each Roof Bid
Hot still air and wildfire smoke can stop a roof job for a day, so ask each roofer who makes the stop call and what it depends on.
St. Louis summers bring two air problems that rarely show up in a roof bid. The first is ozone. On hot, still afternoons, ground-level ozone can build to levels that health agencies flag with action day alerts, and the advice for those days usually includes limiting heavy outdoor exertion. The second is wildfire smoke. In some years, smoke from distant fires drifts into the metro for days at a time, and the fine particles in it can make outdoor work uncomfortable or unsafe even when the sky is clear enough to see across the yard. A roof crew working in both conditions is doing hard physical labor in the open air, often on a steep surface that holds heat.
Most roof bids say nothing about this. They list a start date, a number of days, and a crew size. If the air turns bad on the second morning of tear-off, the bid may not say whether the crew works through it, stops for the day, moves to a different slope, or waits for the next clear forecast. That gap is the subject of this page. The point is not that every roofer will stop on every alert day. The point is that you should know, before the first nail, who makes that call and what they look at when they make it.
Roofer comparison
When you lay two bids side by side, look for a stated trigger. A good answer names something specific: a published alert from the agencies that monitor regional air, a forecast reading the crew lead checks in the morning, or a rule that the crew will carry a particular air reading on the job board. A vague answer such as 'we will use our judgment' is not wrong, but it means the decision is made on the morning of the work, by whoever is on the roof, and you will learn about it when the trucks are already in your driveway.
Next, look at who decides. Some roofers leave the call to the foreman on site. Others have the office make it the night before and phone the homeowner. Either can work. What matters is that one named person is responsible, and that you have a number to reach them. Keys Roofing can be reached at (314) 220-2333, and that is the line to use if you want to know how a given job will handle an alert day before you sign.
Then compare what happens to the work. A stop on one day can mean three different things: the crew packs up and returns the next day, the crew shifts to tasks that do not involve the sun-baked upper slope, or the crew keeps working with respirators and extra water breaks. Each choice changes the timeline and the dust that reaches your yard and windows. Ask each roofer which of the three they use, and whether the choice depends on the alert level or the smoke density.
Finally, compare how the open roof is handled during a stop. If the crew pauses for two or three days in the middle of tear-off, the roof is exposed. A good bid says who checks the tarp, how the underlayment is protected, and who is called if rain arrives during the pause. Those answers belong in the same written scope as the rest of the job.
What it costs
A smoke or ozone stop is not usually a line item, but it can move the cost in ways you should see before you pay. If the crew stops mid-job, the schedule slips, and the slip can push the work into a period when crew rates, material deliveries, or permit inspections are on a different calendar. Ask each roofer whether an air-quality stop is treated the same way as a weather day in the contract. If your bid has a weather clause that covers rain and wind, ask whether it also covers air quality, and if not, what the bid says instead.
Ask whether the bid includes any built-in days for stops. Some roofers schedule cushion into the calendar, so a few lost days do not push the finish into a new season. Others schedule tightly and rebook after every stop. Neither approach is wrong, but the second one usually costs you more in time, and the cost can show up later as a longer stretch with an open roof or a later date for the final walk.
Also ask about respirators and crew protection. If a roofer uses N95-type respirators or other filtration during smoke days, that is a real cost of doing the work, and it should be part of the bid rather than a surprise on the invoice. A roofer who has priced it in will say so. A roofer who has not may add it later, and that is a reason to ask now.
What to ask
Put these questions to each roofer in writing, then compare the answers line by line.
- What source does your crew use to decide an air-quality stop: a published alert, a forecast reading, or the crew lead's observation?
- Who makes the call on the morning of the work, and how will I hear about it?
- On an alert day, does the crew stop for the day, move to different tasks, or keep working with respirators?
- Is a smoke or ozone stop treated the same as a weather day in the contract, and does the schedule include any cushion for it?
- What happens to the open roof during a multi-day pause, and who checks the tarp and the underlayment?
- Does your bid include respirators or other protection for the crew on smoke days, and is that cost already in the total?
- How does a stop day change the dust and debris that reaches my yard, my windows and my outdoor air conditioning unit?
If a roofer answers the first question with a source you can check, such as a named published alert or a specific forecast reading, that is a useful answer. If the answer is a feeling, ask what they would look at before deciding. You do not need the perfect rule. You need one that is stated, that someone is accountable for, and that matches the rest of the contract.
Check the forecast yourself
You do not have to wait for the roofer to tell you about a bad air day. Local weather services and the regional air-quality monitoring agencies publish forecasts and alerts that you can read on your phone. During the job, a short daily check in the morning will tell you whether the crew's stop decision matches the published conditions. If it does not, you have a specific question to put to the foreman or the office. That is a calmer conversation than discovering the crew worked through a bad afternoon without anyone mentioning it.
Keep the forecast notes with the rest of your job file. A dated record of the morning alerts, paired with the crew's stop or work decision, gives you a clear record if the schedule shifts or a dispute about the open roof comes up later. It also helps you judge whether the roofer's stated rule is being followed.
The question is small, but it is the kind of question that a clear bid answers without effort. Ask it before you pick a start date, and make the answer part of the written scope.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.