Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Overland Roof Quotes: Settle the Scope Lines Before the Second Visit

A plain checklist for Overland homeowners comparing roof quotes: scope lines, permit desks, costs, and what to get in writing.

Overland is one of the St. Louis County cities where a roof quote can look complete on the first page and still leave out the lines that decide the final bill. Many houses in the older suburbs of the county went up after the Second World War, so the roof you are replacing may have more layers, older decking, and more penetrations than a single visit shows. This page is for the stage after the first visit, when you hold two or three written quotes and need to line them up before the second visit.

Roofer comparison

Start by checking that every quote describes the same roof. Count the planes, the valleys, the chimney, the pipe boots, the skylights, and the eave and rake lengths, then see whether each roofer used the same count. A quote that says 28 squares beside one that says 31 squares may be measuring the same house with different waste factors, or one roofer may have missed a porch roof on one side. Ask each roofer to state the measured area and whether it is gross or net of openings, and to say which measuring method produced it.

Next, compare the tear-off line. Ask each roofer whether the quote removes the existing shingles down to the deck or lays new shingles over one existing layer. The answer changes the price, the load on the framing, and what the roofer can see once the old material is pulled. Ask how many layers the quote assumes are on the house now and how each roofer found that count. A roofer who checked layers at the eave and at the ridge is giving you a different answer from one who guessed from the driveway.

Look at the cold-weather parts of each bid. St. Louis gets repeated freezes and thaws from late autumn into March, and ice can form at the eave and push water back under the shingles. Check whether each quote includes an ice and water membrane at the eave, how far up the deck that membrane runs, and whether the starter strip is self-sealing or only nailed. Nails in the starter strip can back out during a hard freeze, and a quote that names the membrane width and the starter type is easier to compare than one that says ice protection is included.

Then look at the storm language. Spring and early summer are hail season here, and hail often marks the windward slope first. A replacement quote is not a finding about hail, and Keys Roofing documents what it sees with photos and measurements that go into your hands. But the quote itself should name the shingle line, the wind rating, and the impact rating if you have asked for one. Keys installs Atlas and Malarkey shingles only, so a Keys quote will name one of those two lines. A competing quote that names a different brand is a fair comparison point, as long as you check each spec against the bundle label the crew will open.

Check the age of the roof before you read the price. A three-tab roof that has already been patched in several places is a different decision from one that is sound and simply old. Ask each roofer where they would stop repairing a three-tab roof and what condition they would look for. An answer that names the condition, such as curling tabs, bare granules along the valleys, or tabs that snap when lifted, tells you more than an answer that names a number of years.

If your house has an earlier repair that does not match the rest of the roof, ask each roofer how they would handle the shingle color. Missouri has no matching statute, so no state rule says the whole roof has to match a repaired section. Whether a mismatch is covered at all turns on the wording of your policy, which is a question for your insurer and your agent. A roofer can describe the shingle you would get and what it would look like, but the coverage answer is not theirs to give.

Confirm the permit path as well. Ask each roofer which office will issue the roof permit for your address, then call that office yourself before you choose. Permit offices differ across the county, and the name of your city does not always tell you which desk handles your parcel. Missouri does not license roofers at the state level, so a roofer's state paperwork tells you less than a permit record does. A roofer who names the permit desk, the permit fee, and the inspection steps without being pushed has given you a useful answer.

What it costs

Compare the quotes by the lines they show, not only by the total. A roof total can hide a permit fee, a dumpster, disposal, plywood sheets priced as a flat allowance, drip edge priced by the foot, and sales tax that applies to some materials and not others. Ask each roofer to state these as separate lines. When one quote lists the permit fee and another folds it into labor, you cannot compare the two until both show it in the same place.

Ask whether the decking is priced by the sheet, and how many sheets are included before the price changes. Plywood that proves soft once the old shingles are off is a common source of change orders, and the cost of replacing it is often the largest unknown in the bid. Ask whether the quote includes a replacement rate for soft sheets and what that rate is. A replacement rate written into the quote is a number you can use. An allowance that says to be determined is not.

Ask for the price of the chimney flashing, the pipe boots, and any vent work separately if your house has them. Ask whether the shingles are priced at a delivered rate or a bundle rate, and whether the quote adds extra bundles for cuts at hips and valleys. Bundle counts follow the square count, so a quote that gives one total for shingles without showing the bundle count is harder to check against the delivery slip.

Keep the payment schedule in view too. Ask each roofer what they want paid before the crew arrives, and whether a deposit covers materials that could be returned if the order changes. Read the payment terms as a set of dates tied to finished steps, not as a price. A schedule that pays out before any work is on the roof is a different risk from one that pays after the tear-off is complete and the deck is inspected.

What to ask

Send the same questions to each roofer and keep the replies side by side, in one folder, with the date of each reply. Ask for the answers in writing, and note where a roofer answered by phone and did not follow up in writing.

  1. Which office will issue the permit for this address, and who makes the call to confirm the permit requirement?
  2. Is the quote a tear-off or an overlay, how many layers did you count, and where did you count them?
  3. What ice and water membrane is included at the eave, how far up the deck does it run, and what is the starter strip?
  4. Which shingle line and wind rating are on the quote, and will the bundle label match the spec?
  5. What is the replacement rate for a soft deck sheet, and is that rate written into the quote?
  6. Which lines sit outside the labor total, including the permit, disposal, dumpster, drip edge, and flashing?
  7. How does the crew record a day that weather stops, and who calls you when that happens?
  8. Who is the contact on the job, and what number should I call on a day the crew is on the roof?

If you want to put these questions to Keys Roofing directly, the office number is (314) 220-2333. Ask the same questions of every roofer on your list, in the same order, so that the answers can be compared as written.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection