Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Orchids on the Sunporch Sill: Compare Who Moves Them and Who Carries Them Back

Orchids and other sill plants need a named mover, a dry route and a return date, and each roofer should state those terms in writing.

A sunporch full of orchids is one of the quieter problems on a roof job, and it is easy to miss until the first afternoon of tear-off. Phalaenopsis and other sill plants sit in a narrow band of light, often against a window that faces the work zone, and they tolerate little change. A film of tear-off dust settles on the leaves and in the aerial roots. A cold draft from an opened window, or the thump of boards through the wall, can shake a bloom spike loose in an afternoon. None of that is dramatic, but a plant that loses its flowers or its roots over one week is a loss the homeowner absorbs in time and money.

St. Louis timing matters here. A roof job booked in late October runs into cold nights, and a sunporch can drop well below the indoor setting after dark. A job in July sends heat through the same glass by mid-morning. Most houseplants want a room that stays close to the house's normal temperature whichever season the work lands in, so the destination room should be chosen with the calendar in mind.

The job for the homeowner is to get each roofer to say, before the crew arrives, who moves the plants, where they go, how they are watered while they are away, and who carries them back. The answers should appear in the written scope or in a short side sheet that goes into the same folder as the bid. A roofer who answers in general terms has not yet answered the question.

Roofer comparison

Start with one question: who lifts the plants? Some crews say the homeowner moves them. Some say the crew moves them and sets them back. Some say the crew will "work around" them, which usually means the plants stay on the sill while the work runs directly above the window. Write each answer beside the roofer's name, using their own words. The gap between "we will move them" and "we will work around them" is where most of the disagreement shows up on roof day.

Then ask for the destination. A safe spot is a room away from the work, clear of the ladder path, and at a steady temperature. A bathroom with a window that stays shut suits some plants, and a spare bedroom on the far side of the house suits others. Ask each roofer whether the crew will handle the plants at all or only clear the sill and lean on the window frame. A crew that handles fragile pots should say so, and should say how many trips the move will take.

Compare the watering rule as well. An orchid moved on a dry morning can go several days without water, but one moved on a rainy day can sit wet in a cold room and rot at the crown. Ask each roofer how the plants will be watered while they are off the sill, who does the watering, and whether someone checks on them each evening. Ask what happens if a plant wilts: whether it is replaced, reported, or simply left for the homeowner to find.

Compare the timing of the move against the crew's start. Some crews start early and want the sill cleared the night before. Others start late and open the window to air out the attic, which pulls dust across the room. Ask each roofer when the plants need to be out of the room and whether that hour is written down. A homeowner who has to move plants at six in the evening before a seven o'clock start should know that now, not on the morning of the job.

Finally, compare the return. Ask who puts the plants back on the sill and whether the sill and glass will be wiped first. Grit from the tear-off sits on the glass for days after the last nail, so the sill is not ready until someone has cleaned it. A roofer who will clean the glass and sill before the plants return has thought about the sequence. One who says "they can go back whenever" has not.

What it costs

Moving houseplants is usually a small line, and it often does not appear on the quote at all. Some roofers fold it into labor. Others leave it off and expect the homeowner to move everything. A third group prices a household move as a separate charge that shows up on the first invoice. None of those approaches is wrong by itself, but the difference matters when the homeowner is comparing two totals that look close.

Ask each roofer to put plant handling on its own line, or to write into the scope that it is included. If it is included, ask what it covers: the lift, the transport, the watering, the return, and the cleaning of the sill. If it is excluded, ask who does the work and how much of the homeowner's time it will take. A homeowner who moves the plants alone should know in advance how many trips the job requires and whether the room has to be clear by a set hour.

There is also the question of breakage. A plant that snaps a flower spike, drops leaves, or cracks a pot during the move is a loss. Ask each roofer who pays for that loss and whether the crew's liability coverage reaches a damaged household item. Keep the answer in writing beside the handling line. This is a plain property question, and the roofer's answer should say who is responsible for what in the job itself.

What to ask

Put these questions to each roofer in the same words, and write down each answer beside the question.

  • Who lifts each plant off the sill, and how many trips will the move take?
  • Which room will the plants go to, and what is its temperature on a cold night?
  • Who waters the plants while they are away, and who checks them each evening?
  • Who returns the plants to the sill, and will the sill and glass be wiped first?
  • Who pays if a plant is cracked, dropped, or loses its bloom because of the move?
  • Is the handling included in the written scope, or priced as a separate line?

Then compare the answers across the bids. A roofer who answers all six in the same clear way has made a plan. A roofer who answers three and says the rest will be sorted out later has left the hardest part to chance. If a question needs an answer before the bid is signed, the Best Roofers STL office can be reached at (314) 220-2333, and the answer should be written down the same day it is given.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection