Manchester Roof Bids: Ask Each Roofer Which Entrance the Trucks Use
A Manchester roof bid should name the truck stop, the curb and the lane, so you can compare each roofer's delivery answer line by line.
A roof job starts with a question many homeowners never write down: where does the shingle truck stop, and how do the bundles get from the curb to the eave? Two roofers can quote the same square count and still plan very different days around that answer. You can call Keys Roofing at (314) 220-2333 and ask the same questions this page lists, then set the replies next to the other bids you collect.
Roofer comparison
On a county lot, the truck has to reach the street, and the street has to hold it. A shingle delivery is a heavy truck with a boom or a flatbed, and it needs room to stop, unload and leave without backing across a lawn. Some Manchester lots have a drive wide enough for that. Others have a narrow approach, a shared lane, or a curb where a parked car sits on weekday afternoons. Each roofer's bid should say where the truck will stop, and each roofer should give the same answer when you ask again a week later.
Ask each roofer to mark the stop point on a simple sketch of your lot. The sketch does not need to be a survey. A rough drawing with the house, the drive, the street and the curb is enough to show whether two bids agree. If one roofer puts the truck on the street and another puts it on your lawn, those are two different jobs. The price gap between them may be the cost of protecting the grass, or the cost of carrying bundles by hand over a longer walk.
Pay attention to the approach as well as the stop. A truck that can park at the curb may still need to make a turn through a narrow gap, past a mailbox, under a low branch or over a driveway apron that is not built for its weight. Ask each roofer to describe the route from the main road to your curb in order, with each turn named. Two roofers who describe the same route in the same order have given you comparable answers. Two roofers who skip the approach have left a gap you will need to fill before the delivery date.
Blank answers count too. If a roofer writes nothing about the delivery point, note that line as empty on your comparison sheet. An empty line is not a zero. It is a question the bid left open, and you will have to ask it again before the shingles arrive, when the options are fewer and the calendar is tighter.
What it costs
The cost of the delivery route rarely appears as its own line. It usually hides inside labor, inside a material handling charge, or inside a general mobilization figure that covers the crew's trips. When one bid is lower than the others, check whether the lower bid includes hauling bundles from the stop point to the eave, or whether that work is left out and billed later as a change order.
A typical architectural shingle bundle weighs well over fifty pounds, and a square of roofing is usually three bundles. Carrying a full order from a curb to a two-story eave is physical work with a time cost, and it is priced differently by different roofers. Ask each one whether bundle handling is priced by the bundle, by the square or by the hour. Ask whether a hoist, a conveyor or a ladder carry is used, and whether that equipment is included or rented separately. Each method has its own cost and its own effect on the lawn, the gutters and the hours it takes to get the roof open.
A hoist needs a clear spot on the ground, and that spot should be named in the bid. If a roofer plans to set a hoist on the lawn near a flower bed, ask what protection goes under the base plate and who replaces any turf that is flattened. If a roofer plans to stage pallets on your driveway, ask whether the surface has been checked for weight and whether the roofer will cover it with boards or plywood. Concrete and asphalt both show marks from a loaded pallet on a warm day, and a summer delivery can soften asphalt enough to leave a track. The bid should say who pays for a mark, and the answer should match across every bid you collect.
Weather adds a cost that a bid may not name. A delivery in a St. Louis January can land on a drive that is frozen on top and soft underneath, and a truck that slides on the approach can stall the whole day. A delivery during a spring rain can leave bundles sitting in water on the curb if no one moves them under cover. Ask each roofer what happens to the order if the stop point is unusable on the delivery day, and whether a second delivery is billed separately. The answer may be as simple as a rescheduled truck, but it should be in writing.
What to ask
Put these questions to each roofer in the same order, and write down each reply with the date you received it:
- Where will the shingle truck stop, and is that spot on the street, in the drive or on the lawn?
- Describe the route from the main road to the stop point, with each turn named in order.
- How many bundles will be carried from the truck to the eave, and who carries them?
- Does your price include carrying bundles to the roof, or is that a separate charge, and at what rate?
- What equipment will be used to move bundles, and where will that equipment sit on the lot?
- If a parked car blocks the curb on delivery day, what is your plan, and who calls me?
- If the truck cannot reach the stop point, how long does the crew wait, and is that wait billed?
- Who covers a lawn mark, a driveway mark or a curb chip caused by the pallet, and where is that written?
- If the delivery falls on a freezing or wet day, what happens to the order and to the date?
Keep each reply beside the question it answers. If one roofer says the truck will stop on the street and another says it will stop in the drive, put both answers on the same row. That row is the comparison. The prices can come after, once you can see which bids plan for the same day.
Manchester lots vary in width, slope and frontage, so do not assume that a roofer who has worked nearby already knows your approach. Take a photo from the curb looking toward the house, with the drive and the street visible, and send the photo to each roofer with the same request. Ask them to describe the stop point from the photo. Then compare the descriptions. Two roofers who read the same photo differently have shown you a question to settle before you sign.
Missouri does not license roofers, so the delivery plan is one of the few places where a homeowner can check a roofer's planning directly. Ask which city or county rules apply to parking, lane closures and right-of-way on your block, and whether the roofer has dealt with those rules before. If the roofer cannot name the rule, the answer is still useful. It tells you the question was not checked, and you can decide whether to check it yourself with the city or county desk before the truck is booked.
Write the replies down before you pick a date, and bring the sketch and the photo to the second call. A roofer who answers the route question the same way twice is giving you a plan you can hold them to. A roofer who answers it differently each time is giving you a reason to keep looking.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.