
If Your Estimator Calls in Sick, Ask Each Roofer Who Answers You
When the person who measured your roof is unavailable mid-comparison, each roofer's answer shows who holds your questions and your numbers.
Most homeowners who compare roofers do it over two or three weeks. In that time a person can change jobs, take leave, or get sick. The estimator who walked your roof and wrote the number may not be the one who answers the phone when you call back with a question about the shingles, the underlayment, or the start week. That gap matters more than it sounds, because the answers you get from each roofer while the estimator is out will tell you who holds the job record and who is only holding a price.
Roofer comparison
Start by checking the file each roofer holds on your house. Ask each company for the name of the person who wrote your bid and the name of the person who will answer questions if that estimator is unavailable. A good answer is a name, a role and a way to reach them. A weak answer is "our office handles that" with no name attached. Write both replies down in the same format so you can compare them side by side.
Then ask each roofer what changes in the bid if the estimator is replaced. Two estimators can measure the same roof and round the square count differently, and a substitute who has not seen the lot may not know that your north slope holds ice into March. Ask the roofer to say, in writing, which measurements carry over from the original visit and which would need a second walk.
Keep a dated note of every call. If you phone Keys Roofing at (314) 220-2333 and reach someone other than the estimator, write down the name, the time and the question. Then ask for the same answer in writing. Two sources that agree are more useful than one sentence heard on a phone call.
What it costs
A substitute estimator does not usually change the price, but a second walk might. Ask each roofer whether a return visit to re-measure the roof is included in the bid or billed separately. Some companies absorb a second look in the first two weeks, and others charge for it. Neither answer is wrong, but the difference can add a line to the comparison that the first bid did not show.
Ask also whether the price is held while the estimator is out. If your bid has a validity date, find out whether that date moves when the person who wrote it is unavailable. A roof quote that expires during a staff absence can look fine on paper and still be a problem on the day you want to sign. Compare the expiry date on each bid against the date you expect to make a decision, and note any gap.
Finally, ask what the substitute will charge to revise the bid if you ask a question that changes the scope. A change in the number of layers to tear off, the chimney flashing, or the drip edge can move the total. Each roofer should be able to say how a revision is priced and who signs off on it.
What to ask
- Who wrote my bid, and what is their direct line?
- If that person is out, who answers my questions, and can they see my file?
- Which measurements in my bid came from the original visit, and which would need a second walk?
- Does my price hold, and until what date, if the estimator changes?
- Is a return visit to re-check the roof included, or billed separately?
- How is a revision to the scope priced, and who signs it?
- Will you put the answer to each of these questions in writing?
St. Louis conditions make some of these questions sharper. A roof that has gone through a February freeze and thaw may show soft decking or lifted tabs that the first visit did not reach, and a substitute who has not walked the eaves will not know where the ice dams formed last winter. Hail season adds its own pressure. If a storm passes through during the comparison window, a roofer with a clear answer on who handles the follow-up walk will be easier to schedule than one who is still deciding who has your file.
Older three-tab roofs raise the same issue. If the first estimator told you a three-tab roof is past the point where repair makes sense, ask the substitute to confirm that in writing, with the age and the condition they found. A repair versus replacement judgment is the kind of call that should not rest on one person's memory of a visit.
Keeping the comparison steady
When the estimator is out, you are still comparing roofers, and the comparison needs to stay on the same ground for each one. Use the same list of questions for every company, and ask each one to answer from the file rather than from memory. If a roofer cannot tell you who has the file, that answer is information too.
Permit questions belong in the same list. Many St. Louis County jurisdictions require the permit to be pulled before work starts, and the permit desk may ask about the square count or the decking. Ask each roofer who pulls the permit and whether the substitute has seen the permit application. A missing link there can delay the start by days.
If you decide to switch roofers because one of them could not answer during the estimator's absence, tell the others what you learned and give them the same question. Their replies, written down and dated, will show you whether the gap was a single bad week or a habit.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.