Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Identical Sentences in Two Roof Bids Point to a Template, So Ask Who Wrote Them

Two bids with the same wording can tell you who drafted them, so ask each roofer who wrote the scope and who checked it against your house.

When you collect two or three written bids for a St. Louis roof, the scope pages often look alike. Roofers across the metro use the same industry phrases for tear-off, underlayment, drip edge and ridge vent, so some overlap is normal. What deserves a closer look is when whole paragraphs match word for word, including an odd abbreviation, a stray capital letter or a sentence that does not fit the house it describes. That pattern usually means one template or one copied document sits behind both bids. It can also mean a bid was passed from one roofer to another, or that a sales office reuses a scope it wrote for a different job.

None of this proves anything is wrong. A template can be a good template. The point for a homeowner is simple: a scope that was not written for your roof can still get priced as if it were. This page covers how to see the overlap, what it does to the price, and which questions to put to each roofer in writing.

Roofer comparison

Put the scope sections of your bids side by side, one paragraph at a time. Mark each paragraph as identical, close, or different. Identical text is not automatically a problem. Two roofers who both specify the same ice and water shield width, or the same starter course at the eave, may simply follow the same manufacturer instructions. The useful checks are the numbers inside the matching text. If both bids say the same width, the same nail spacing and the same count of pipe boots, the match is reassuring. If the numbers differ while the sentences match, one of the documents was not updated for your house.

The differing paragraphs are where the comparison lives. Read them slowly. A bid that says the crew will remove two layers of old shingles and a bid that says one layer are describing two different jobs, even if every other sentence is the same. The same goes for a bid that mentions a chimney on the north slope when your chimney sits on the south slope. Copied text tends to carry the previous house's details, and those details are easiest to catch in the paragraphs that do not match.

Check each scope against your own measurements. Ask whether the slope count, the number of valleys and the number of penetrations match what you saw on the roof walk. A St. Louis house with a dormer, a gas flue and a plumbing vent through the back slope has a different scope than a plain ranch with one gable, even on the same street. If a bid describes a feature you do not have, that is a question for the roofer, not a detail to skip past.

Watch for drift between your bid and the contract. Some roofers send a bid, then a contract with a different scope page. Compare the two line by line. A matching bid and a mismatched contract is a bigger problem than two bids that share some text.

What it costs

Matching wording does not make a price fair, and tidy wording does not make a bid cheaper. A template can include a line item the roofer does not perform, such as a fascia paint allowance on a house with vinyl trim, or a dumpster for a job that uses a roll-off the crew does not order. If that line is in the total, you are paying for it. The price is the thing to compare, so each bid has to break its total into the lines that are actually being done on your roof.

Ask each roofer to point to the priced line that covers their own crew's work on your house. A good answer names the line and the quantity, such as the number of squares, the feet of drip edge or the count of pipe boots. A vague answer that points to the whole scope page is a signal to ask for a unit breakdown in writing before you compare totals.

Look at the materials as well. If two bids name the same shingle line but one lists a higher bundle count per square, one roofer may be pricing extra waste into the order. Ask each roofer how many bundles make a square on the product they name, and how many they are ordering for your roof. The answer should match the square count on your measurement report.

Do not choose the cheaper bid only because its scope reads cleanly. A clean scope that leaves out the ice and water membrane at the eave, the drip edge at the rake or the flashing at a sidewall will look cheaper until the crew reaches those lines and the price changes.

What to ask

Put these questions to every roofer whose bid shares text with another, and keep the replies in writing:

  • Who wrote the scope paragraph in your bid, and is it from a template? If so, which template and when was it last revised?
  • Which lines in the scope were written or edited for your house, and which were not?
  • Can you show me the roof measurement and the photo set the scope refers to, with the date each was taken?
  • How many slopes, valleys, pipe boots and roof penetrations does your scope count, and does that match what you saw on the roof walk?
  • Which paragraph in your contract differs from your bid, and why?
  • Name the three lines in your bid that your estimator wrote specifically for my house.

The last question is often the most revealing. A roofer who can name specific lines tied to your roof has a record to point to. A roofer who cannot name any may still do good work, but you will have to rely on their finished work and their written commitments rather than the bid text.

Also ask each roofer how the bid is kept on file. Some offices keep the estimator's working notes next to the scope. Others keep only the final PDF. If you cannot see the notes that produced a scope, you cannot check whether the scope was built from your house or copied from another one. That is a fair thing to ask before you sign.

When two roofers give you bids with shared text, do not ask either one to explain the other. Ask each roofer about their own paper. Keep the replies beside the bids, and compare the answers, not the sentences.

For questions about your own bid or a St. Louis roof visit, you can call Keys Roofing at (314) 220-2333. Ask for the estimator who wrote your scope, and ask them to walk you through the lines that differ from the other bid you are holding.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection