How Many Crews Will Hold Your Roof Date Through a St. Louis Winter?
Ask each roofer how many crews will hold your date if a freeze, a thaw or an ice storm stalls the job, and get the answer in writing.
A roof date in St. Louis rarely runs in a straight line once the calendar moves into late fall and winter. The work depends on decking that is dry enough to nail, shingle sealant that bonds on mild afternoons, and a stretch of cold that holds off long enough for the crew to finish what it opened. Before you pick a start week, it helps to know how many crews a roofer keeps working through those months, because a company with one crew and a full calendar has less room to move your job when the weather turns.
Why the winter calendar is tight
St. Louis winters swing. A week of highs in the 40s can be followed by a hard freeze that sets the deck and the shingles against the crew, and then a thaw that leaves the roof wet by noon and iced again by dark. Freeze and thaw cycles also loosen the nails on an older deck and can keep a section of roof from taking its sealant strip. A roofer who is honest about this will tell you that some winter days are simply not roofing days, and that the calendar has to absorb them somewhere.
The question is where. Some companies build standby days into the schedule, so a weather loss moves the job by a day or two without moving the whole crew. Others keep the calendar tight and move the job when the weather stops them. Neither approach is wrong on its face, but each one changes how much of a delay you should expect and who pays for the time lost.
The permit desks add their own clock. Most St. Louis County and city permit offices keep working through winter, but inspection windows can stretch when the weather closes roads or when a crew has to wait for a re-inspection. A roof that is open and waiting on an inspector is the situation most homeowners do not plan for, and it is the one a winter crew count is meant to cover.
Roofer comparison
Put the crew count on the same page as the start date for each bid. Ask each roofer how many installation crews they will run in the months they are quoting, and whether any of those crews are also booked for emergency tarping, ice-dam calls, or storm repairs that came in after a bad week. A roofer who says one crew and no backup is not necessarily a worse choice, but you should know it before the calendar slips rather than after the deck is open.
Then ask what the roofer does when the forecast turns. Some companies pull a crew from a planned install to tarp an open roof after a wind event, which protects the house but moves your date. Others keep a standby day and a second crew for exactly that work. Either way, you want the answer written on the bid rather than remembered from a phone call three weeks later.
Compare the answers side by side. Two roofers can both promise a January start and still mean different things by it. One may mean a crew is assigned and waiting for dry weather on a day it can actually work. The other may mean a slot is open on the calendar that the crew will fill only if the deck is ready. The word is the same, but the commitment is not, and the only way to see the difference is to ask each roofer to describe what happens on a day when the start is blocked.
It also helps to ask how the crew count changes if you choose a later week. A roofer who has one crew in December may have three in March, and a bid written for a March start can look very different from one written for November. Ask each roofer to name the crew count for the week you are considering, not for the company in general.
What it costs
Winter crew count does not usually appear as a line item, but it can change the price. A roofer who runs a small winter crew may add a cold-weather labor line, a standby day charge, or a mobilization charge for a return visit when a morning start gets pushed. Some of those charges are fair, because the company is holding labor it cannot use on a bad day. Others are surprises if they were never written down. Ask each roofer which of those costs, if any, sit inside the bid total and which are billed on top.
Ask too what a delayed start costs you. If a roofer has to move your job three days because a freeze locked the deck, does the bid change, or does the same price hold? The answer tells you whether the crew count is a promise about your house or a hope about the weather. A price that holds through a delay is worth more than a lower number that opens up the moment the first freeze arrives.
Materials add a second layer. Atlas and Malarkey shingles are the only lines Keys installs, and each one has its own cold-weather handling. In a cold week the sealant strips may need hand sealing, and that labor should appear somewhere in the bid. Ask each roofer which product they will install in a cold week and whether hand sealing is part of the labor they priced or a separate line.
If you want to check a roofer's answer against your own numbers, bring the bid to the office and ask for the crew count and the standby charge in the same sentence. Keys Roofing's office line is (314) 220-2333, and the same questions can be asked on that call as on a site visit. Whatever the answer, keep it with the bid, dated, so the start week and the price are judged on the same paper.
What to ask
- How many installation crews will you run in the months between my quote date and the start week?
- Does any of those crews also serve emergency tarping, ice-dam calls or storm repairs, and how do you decide which job gets the crew first?
- What is the standby rule if weather stops work on the day we planned, and is that day inside the bid or billed on top?
- Which permit desk will pull my permit, and what has the typical inspection wait been in that office during the winter months?
- Does the bid include a cold-weather labor line, a standby day or a return trip, and what is each one priced at?
- If my start date moves, who calls me, how much notice do I get, and will the new date be written down?
Get the answers in writing on the same sheet you use for the start date. A roofer who answers the first question with a number and the second with a plan has given you something you can compare. A roofer who answers both with a general reassurance has told you something too, and it is worth writing down in the same place as the rest.
Bring the sheet back to the second visit and read each answer aloud to the roofer. If the answer changes when it is read back, that change is the thing to ask about before you sign, while the start week is still open and the decision is still yours to make.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.