
How Long Each Roofer's Sales Visit Runs, and What Should Come Out of It
A sales visit can run long or short, so compare what each roofer leaves you with before you compare the price.
A roofer's sales visit can be twenty minutes or two hours, and the length alone tells you little. What matters is what the visit leaves in your hands when it ends. A short visit that produces a measured scope, dated photos, and a written next step can be more useful than a long one spent mostly on the pitch. This page is for a St. Louis homeowner who has two or three roofers on the calendar and needs each visit to produce the same facts so the comparison rests on something solid.
What the visit is for
The sales visit has one job: to see the roof and the house well enough to write a scope you can check. That means walking the lot, looking at the gutters and fascia, reading the attic if the roofer is allowed up there, and measuring the roof. In St. Louis that also means looking at freeze-thaw damage at the eaves, ice dam history on the north side, and any hail marks from recent storm seasons. A roofer who spends most of the visit on financing or upgrades has not yet done the part of the job you are paying for.
Keys Roofing installs Atlas and Malarkey shingles, and the shingle line is one of the things a visit should name in writing. Ask which line is quoted, not just the brand, because the shingle wrapper and the written scope have to agree.
Write down the clock
Before the roofer arrives, note the time they come and the time they leave. Note who was there and who went up on the roof. This is not about distrust. It gives you a number to compare. Two visits of different lengths may cover different ground, and if you do not record the clock you will remember the longer one as the more thorough one.
Pay attention to where the time went. If forty minutes went to the roof and the attic and twenty to the kitchen table, that is a different visit from one where the walk took ten minutes and the rest was the pitch. Neither is automatically wrong, but the second one leaves you with less to check later. Being home for the whole visit helps here, because you can see which areas the roofer actually looked at.
What the visit should leave in your hands
A finished visit should leave you with four things. The first is a written scope, or a clear promise to send one by a stated date, with the roofer's name and office phone number on it. The second is photos of the roof planes, the chimney, the valleys, the penetrations, and any damage the roofer points to, each with a date. The third is the measurement, with a note on how it was taken. The fourth is a list of what the roofer could not see, such as a shaded slope, a flat section they could not reach safely, or an attic space with no access.
Ask for the photos as files you can keep, not only as texts sent to your phone. A text can disappear when a phone is replaced, and a dated file survives it. If you finish the visit and hold none of these four things, you have a conversation, not a bid. That can be a fine first step, but it means the comparison will rest on memory.
Ask what the visit did not cover
Good visits end with a short list of what is still open. Ask each roofer to name those items aloud and to write them down. For an older St. Louis house, the list often includes the condition of the decking under the old shingles, the flashing at the chimney, whether there is a second layer on the roof, and whether the gutters are part of the scope. If one roofer names five open items and another names none, the second one has either checked everything, which is rare, or has not said what they skipped.
What to ask before the roofer leaves
- When will the written scope arrive, and by what date?
- Which shingle line is quoted, and will the wrapper match the scope?
- Who will be on the crew, and will the person who visited be the one who sets the start date?
- What did you measure, and how did you measure it?
- What would change the price after the tear-off starts?
Write each answer next to the question it answers. Do not rely on the roofer's summary later. Keep the page with the rest of your notes on that roofer, in the same folder as the other paper.
How to compare two visits
Put two visits side by side and use the same four items for each: the clock, the photos, the measurement, and the open list. A roofer who took an hour and left a dated photo set, a measurement note, and a written open list has given you more to compare than one who took forty minutes and left only a price. Do not treat the longer visit as the better one by default. Treat the visit that produced the most material you can check as the one to compare first.
Season matters too. A visit in late January may find the roof frozen, wet, or partly covered with snow, and a roofer who says nothing about that has not told you what the visit could actually see. Ask whether the walk was done on a dry day and whether the shaded north slope was checked. A visit that stayed on the ground can still produce a number, but the number is only as good as the look that came before it.
If one roofer's written scope arrives late, note the date and ask why. A delay in the paperwork is not always a warning sign, but it is a fact you should have on record. The same goes for any visit that never reached the roof itself. Ask directly whether the roof was walked, and write down the answer.
Where to start
Set a date for each visit, and use the same list of questions for every roofer. Ask for the written scope, the dated photos, the measurement note, and the open list every time. If you want to talk through a visit or ask a question before one is scheduled, Keys Roofing can be reached at (314) 220-2333.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.