Freezer Food and Breaker Shutdowns: What Each Roof Bid Should Answer
Each roof bid should say which circuits go dark, who flips them, and what happens to the food in your freezer if the outage runs long.
A chest freezer in a St. Louis garage or a second refrigerator in the basement is easy to forget on the morning a roof crew arrives. The breaker panel is often the first thing that changes. A tear-off can call for a circuit shut off, a temporary disconnect near the meter, or a generator set to run a compressor while the work goes on. Any of those can leave a freezer dark for hours, and a roof bid may say nothing about it. This page is for the homeowner who has an appliance on a circuit the roof work could touch and wants to compare what each roofer says before the crew shows up.
How long food actually holds
The USDA food safety guidance gives a rough window. A full freezer that stays closed keeps food frozen for about 48 hours after the power goes out, and a half-full freezer for about 24 hours. A refrigerator with its door kept shut holds food at a safe temperature for about four hours. Those numbers assume the food started out cold and the appliance was not opened during the outage. A garage can run well above room temperature on a St. Louis August afternoon, and a homeowner who is worried about a dark freezer tends to open it to check, which shortens the window. In a St. Louis January the garage may stay cold enough that food keeps longer, but a homeowner should not plan around the weather.
The practical point is that the roof schedule and the food schedule become the same schedule. If the crew says the garage circuit will be off for a morning, the freezer needs a plan for that morning. If the crew says the power will be off for two days, the plan has to be a different one, with a cooler, bags of ice, and a place to move the food.
Roofer comparison
Compare three things across the bids: whether the power work is named, who does it, and what happens when the outage runs long. A bid that says electrical as needed tells you nothing you can use on the day. A bid that names the garage circuit, the time window and the person doing the shutdown gives you something to plan around. Put the answers side by side, the same way you would put two roof totals next to each other, and look for the gaps.
These are the points where bids usually differ:
- Whether the bid names the circuits, outlets or service lines the crew will touch, or only refers to power in general.
- Who flips the breaker or disconnects the service, and whether that person is a crew member, a subcontractor, or someone outside the company. Missouri does not license roofers as a class, so the bid is where you see who is doing the electrical work and who answers for it.
- Who restores power, how long the restore is expected to take, and what the crew does if it runs past the stated time.
- Whether a generator is part of the plan, where it would sit, and whether it would run outdoors and away from open windows, doors and the garage intake.
- Whether you will get written notice before any shutdown, and how far ahead that notice comes.
A generator deserves a sentence of its own. A portable generator burns fuel and gives off carbon monoxide, so it belongs outdoors, well away from doors, windows and vents. A roofer who says the generator will sit in the garage with the door cracked has given you a safety answer that is wrong on its face. Ask where it will sit before you ask anything else about it.
What it costs
The cost of a freezer outage on roof day is mostly the food and the time spent managing it. A cooler and ice cost little, but the homeowner pays for them, and a long outage can push a household toward a rented generator or a night away from home. None of those show up on a roof bid unless the bid writes them in. Before you compare totals, ask whether the bid includes any line for temporary power, a rented generator, or extra electrical labor. Many bids leave those out or fold them into a general line, which makes two totals look closer than the work behind them.
If a bid does carry a generator or a temporary power line, treat it the same way you would treat a dumpster overage: find the unit, the duration and the rate, and confirm whether the number is fixed or moves with how long the outage runs. A charge that climbs with the hours is a different number from one that stays put.
Food loss is a separate question. A roofer's written scope lists the work the crew will do, and the contents of a freezer are not part of that work unless someone writes them into the scope. Ask the question directly and get the answer in the bid. If the answer is no, you should know that before the crew arrives, so the cooler decision is made with the facts in hand.
What to ask
Ask these questions in writing and keep the replies with the bid. Keys Roofing answers questions like these at (314) 220-2333 before a crew is scheduled, and any answer that matters should appear in the written scope.
- Which circuits, outlets or service lines will the crew shut off, and on which days?
- Who performs the shutdown and the restore, and is that person named in the bid?
- What is the plan if the outage runs past a few hours, and who pays for a cooler, ice or a rented generator?
- If a generator is used, where will it sit, and how far is it from doors, windows and vents?
- Will you get written notice before any shutdown, and how far ahead will that notice arrive?
- Will the freezer and the refrigerator appear in the job photo log before the crew starts, so the starting condition is on record?
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.