
Each Roof Quote Rests on Assumptions Nobody Printed, So Ask for Them
A roof bid rests on assumptions about access, weather and materials. Ask each roofer to write them down before you compare totals.
A roof bid is a set of numbers, and every number rests on a list of things the roofer took for granted when writing it. The crew will have access to the yard. The weather will hold long enough to finish. The shingle truck will arrive on the day it was promised. The tear-off will reveal the deck you expected. Most of these are never printed. When two quotes come in at different totals, the gap is often a difference in what each roofer assumed, not a difference in the roof itself.
This page is for a St. Louis homeowner part way through the decision, with two or three quotes in hand, who wants to know what to ask before choosing. The fastest way to compare fairly is to get each roofer to write down the assumptions behind the price, then read those side by side. A roofer who will not write them down is telling you something too, and it is useful to know that early.
Roofer comparison
Start by checking that the quotes cover the same scope. If one bid includes a full tear-off and the other is an overlay, the totals are not comparable no matter what the assumptions say. Once the scope matches, list the assumptions on a single sheet with one column per roofer. Rows that commonly differ include how many layers come off, whether the deck is replaced where it has rotted, how much ice and water shield goes at the eaves and valleys, how much waste is added to the shingle order, and how many days the job is expected to take.
Ask each roofer which of these numbers came from a site visit and which came from an estimate. A measured roof and an estimated roof can produce the same total, and the homeowner should know which one they are paying for. The difference usually shows up later, when the crew finds an extra layer under the first slope they open.
Weather is an assumption too. In St. Louis, freeze and thaw cycles in late winter loosen shingles and leave the deck slick in the mornings, and summer thunderstorms can arrive with little warning. A bid that assumes steady dry weather across three weeks in April carries a different risk from one that builds in a rain allowance. Neither approach is wrong, but the difference should be visible on paper so you can judge it.
What it costs
Each assumption carries a cost, even when the bid does not show it as a separate line. Extra labor days cost money. A smaller waste allowance saves money on the first delivery and can cost more on a second delivery if the crew runs short on a hip or a valley. A quote that assumes the existing decking is sound avoids the cost of a decking survey, but if sheets must be replaced once the old roof comes off, the homeowner pays for that work by the sheet through a change order.
Hail season adds its own pricing question. Many St. Louis roofs are replaced after a storm, and a crew may be booked for weeks. A roofer who assumes an open calendar may quote a faster start than the crew can actually keep. Ask each roofer how far out the next available start is, and whether the quoted price holds until that start. The gap between the quote date and the start date is an assumption worth writing down.
Ice damming at the eave is another place where bids differ without saying so. One roofer may assume that ice and water shield runs only along the eaves, while another runs it higher up the slope to cover the first few feet where meltwater backs up during a hard freeze. Both approaches can be defensible. The homeowner should see which one each bid includes, because the difference is real material and real labor.
Municipal permit desks across St. Louis County also differ in how quickly they schedule inspections and whether a re-roof needs a separate trade permit. A bid that assumes a same-week inspection may be planning around a desk that is running behind. Ask who pulls the permit, and ask what inspection window the roofer assumed when setting the schedule.
Older roofs raise the question of repair versus replacement in a different way. A three-tab roof that has lost many granules and cracks at the tab cutouts may not be worth repairing, and a roofer who assumes a spot repair will hold is making a bet about the shingles around the repair. Ask each roofer what condition they assumed for the remaining shingles, and what they would do if the repair failed within a season.
What to ask
Put these questions to each roofer in writing, and ask for the answers back in writing:
- How many layers do you expect to remove, and what did you see that told you so?
- What did you assume about the decking, and what is your unit price if sheets need replacing?
- How much waste is included in the shingle count, and how did you arrive at that percentage?
- How many working days does your schedule assume, and which weather days are built in?
- When is your earliest start, and does the price hold until then?
- Where does ice and water shield run on my roof, and why that far up the slope?
- Who pulls the permit, and what inspection window did you assume?
Expect some roofers to answer quickly and others to need a day. A short delay is normal when a roofer is checking a number against the site visit. A long silence, or an answer that simply repeats the bid without explanation, is worth weighing in your comparison.
Reading the answers side by side
Once the answers are in, look for the assumptions that differ and check whether each difference is explained. A difference in waste allowance with a clear reason is easier to live with than a difference with no reason at all. Where one roofer's assumption is more conservative, that bid may be higher for good reason, and the lower bid may be quietly counting on conditions that will not appear.
If two bids still differ after the assumptions are on paper, ask each roofer what the other bid gets wrong, and write down the answer. Then read those answers against your own notes from the visit. If you have questions about how a bid was built before you compare it, Keys Roofing can be reached at (314) 220-2333.
Keys installs Atlas and Malarkey shingles, so if a bid names a shingle, confirm the product name in writing before you compare it to another. A bid that names a product only as architectural shingle leaves open the same assumption you are trying to close, which is what the material will actually be on the roof.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.