Damp Decking Is a Start-Time Question, Not a Weather Guess
A wet deck can look dry from the driveway, so compare who calls the start, what test they run, and what a held morning costs before the crew arrives.
A deck can look dry from the driveway and still hold enough water to swell plywood, make a crew member slip, or keep a shingle sealing strip from bonding. In St. Louis the damp morning shows up in several forms: a night of rain that stopped around 3 a.m., heavy dew in October, frost that burns off by ten and leaves the north slope wet, and the shoulder-season fog that sits in the river bottoms. Each roofer's answer to the question of when they start nailing shows how they make that call, and almost every answer sounds reasonable on paper.
This page is for the homeowner who has two or three written bids and one question left: who decides whether the deck is dry enough to start, and what happens to the day if the answer is no. It does not rank roofers. It gives you the questions that separate a roofer who has a rule from one who has a feeling.
Why a damp deck is a schedule problem
Asphalt shingles go down onto a deck made of plywood or OSB. Wood that has taken on moisture swells, and nails driven into it can pull out or raise a ridge of sheathing that shows through the finished roof for years. Wet decking also makes the footing unsafe. A crew working a sloped surface on damp boards moves more slowly and risks more falls, so the crew's own safety rules often hold the work before the homeowner sees any sign of trouble.
Shingle sealant is the second issue. Self-sealing strips need warmth and dry surfaces to bond. A cool, damp morning can leave the strips unsealed until the afternoon sun reaches the roof, which is why some crews wait until both the deck and the shingle surface are dry before they lay the first course in a section. The rule is not about crew comfort. It is about whether the roof you paid for will hold in the first high wind.
None of this means a roof has to wait for perfect weather. Many crews start on a damp morning once the deck is checked and the first sections are known to be dry. The question is not whether the sky is clear. The question is who checks, how they check, and what they write down when they decide to wait.
Roofer comparison
When you compare roofers on this point, look past the phrase "we start when it is dry." Nearly every contractor says it. Ask instead for the specific test and the person who runs it. A useful answer names a method, such as a hand touch on the decking, a moisture meter reading taken at set spots, or a check of the sealing strip. It names a role, such as the foreman on the roof, the job lead, or the office. It also says when the check happens: before the crew climbs, at the first ladder, or after the first section is opened.
Compare the answers side by side in these categories:
- The test they use on the deck, and whether it is the same test every day.
- Who makes the call on a given morning, and whether you can reach that person.
- Whether a hold is logged in writing with the time and the reason.
- What the crew does with the rest of the day when the start is held: moves to another slope, works a different task, or goes home.
- Whether a hold changes the completion date, and who tells you when it does.
A roofer who answers all five with the same level of detail is describing a process. A roofer who answers one with a sentence and the other four with shrugs is describing a habit. Habits do not show up on a bid, but they do show up on the third day of a roof.
Keys Roofing installs Atlas and Malarkey shingles, and the same questions apply whichever line you choose. Manufacturer instructions set the sealing and temperature conditions for each product, so ask every roofer which instruction sheet they follow on the morning of the job, and ask whether a copy can go in your file.
What it costs
A held morning costs something even when no one is paid for a day that did not start. Some bids carry a standby line for days the crew is on site but cannot work. Others say nothing, which means the cost is either absorbed or appears later in a change order. Neither is wrong on its face, but you should know which one you are looking at.
Ask each roofer three questions about cost. First, is a held morning billed, and at what rate, or is it inside the bid? Second, if the crew loses a full day to a damp deck, does the price change, and does it change only after a written change order? Third, how many standby days does the schedule already assume? A bid that assumes three standby days has priced the weather. A bid that assumes none has not, and that gap matters in a St. Louis spring when a wet week can stack up.
Also check whether the price holds if the deck fails the check and needs repair. Soft or swollen decking found on a damp start is a separate line, and the unit price for replacing sheathing should be on paper before the tear-off begins, not worked out afterward. A roofer who writes that rate into the bid is telling you how a damp deck will be priced.
What to ask
Put these questions to each roofer in writing, using the same wording for every one so the answers can be compared:
- What check decides that the deck is dry enough to start, and what is the threshold?
- Who runs the check on a given morning, and what number do I call if I cannot reach that person?
- Do you check each slope separately, or once for the whole house?
- What happens if the check fails at 7 a.m. with the crew already on the truck?
- Is a held morning written into the daily log, and can I see that log?
- Is a held day billed, and does it move the completion date?
- Which manufacturer sheet sets the sealing and temperature rule for the shingle on my roof?
Read the answers against each other. A good answer usually has a name, a number, and a written record attached. If a roofer says the foreman will "use judgment," ask what the judgment is based on and whether it is written down. Judgment is acceptable when a crew can explain it. It is not a test you can check later.
Once you have the answers, keep them in the same folder as the bid and the contract, with the wording unchanged. On the morning of the job you can then ask whether the crew followed the rule it gave you, and you will have something on paper to compare the answer against.
If you want to hear how a roofer answers these questions before you choose, call the office at (314) 220-2333 and ask for the written version of their rule. Get it on paper before the trucks arrive, not on the driveway.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.