
Crew Cameras on Your Lot: Ask Each Roofer What Gets Recorded and Who Keeps It
Dash cams and body cams on a roof crew make a file about your house, so ask each roofer what gets recorded, who holds it and how it ends.
A roof crew on a St. Louis street may carry more recording gear than the roofer's office does. Some crews run a dash camera in the truck so the owner can settle a parking dispute. Some wear a small body camera for a safety log. Some run a phone app that stamps each photo with a time and a location. Each of these makes a file about your house, your street and sometimes your family, and the file outlives the job. Before you pick a roofer, ask what gets recorded, where it lives and who can pull it.
This page is for the homeowner who has two or three written bids and needs to know how each company handles the cameras that will be on the property for the next several days. It does not ask you to refuse cameras. It asks you to hear the answer before the first truck turns in.
Why the file matters on your lot
Recording is not the problem. A time-stamped photo of a shingle lot or a ladder set is useful, and it is often strong evidence if a dispute comes up later. The trouble starts when the recording catches things you never agreed to share: a conversation in the kitchen, the inside of a bedroom through an open door, a child's face at a window, the code on a garage keypad, or a home office with a laptop open on the desk. Once those frames sit on a phone or a cloud account owned by a company you did not vet, you have a copy you cannot recall.
Missouri is a one-party consent state for recording conversations. In plain terms, a person who is part of a conversation may record it without telling the others, so a crew member filming a talk he is in is usually not breaking the law. That fact does not answer the questions that matter to you: who holds the file, how long it is kept, whether it is shared with a third party, and whether you can ask for a copy or a deletion when the job ends.
Be specific about where a camera points. A dash camera mounted on a crew truck that faces your front window records your living room through the glass when the truck idles at the curb. A body camera worn by a crew member at your back door records whatever is inside when the door opens. Neither is wrong by default. Both should be named in the bid so you know what the crew expects to capture.
Roofer comparison
Put the three bids on one sheet and make a row called Cameras. Leave the cell blank if the bid says nothing. A blank cell is not a yes. It is a question you still have to ask, and the roofer should answer it in writing before you sign.
Look for four separate answers in each bid. The first is the device: dash camera, body camera, phone photos only, or none. The second is coverage: what the device is pointed at, whether it runs while the crew is on the roof, and whether it runs at the curb when the truck is parked. The third is storage: where the files go, who has login access, and whether the crew's personal phones are involved. The fourth is retention: how long files are kept after your final check, and how you ask for them to be deleted.
Pay attention to the difference between a company camera and a crew member's own phone. A company system usually has an owner, a written retention rule and a named person whose login opens the account. A personal phone belongs to the worker. If a bid says photos are taken on crew phones and nothing else, ask whether those phones sync to a personal cloud account, and who at the company can see what is on them.
Ask each roofer whether the camera rule is the same for every crew. A company with one approved setup will say so. A company that changes its answer from crew to crew, or from week to week, is telling you that the rule is not settled yet.
What it costs
Cameras are usually not a line on a roof bid, so the cost is hidden in the crew's equipment and in the office time needed to manage the files. Ask whether any camera fee, subscription or storage charge is included in the price, and whether a charge is billed to you if you later request a copy or a deletion. Some companies bill for a records pull after the job closes. That bill should be listed before the job starts, not discovered on the final invoice.
The other cost is time. If you want a deletion, a written confirmation and a copy of the retention rule, expect a short wait while the office confirms what it holds. Ask each roofer how long a records request takes, and get the answer in a sentence you can keep. A roofer who says it can be done the same day is making a promise, and that promise belongs in the writing too.
If a camera is part of a safety program, such as a body camera that logs a fall or an injury, ask who pays for that program and whether the footage becomes part of an injury file. That footage can matter to your household if a worker is hurt on your lot. Who owns the camera and who pays for an injury on your property are separate questions, and each bid should answer both.
What to ask
Send each roofer the same list in the same order, and keep the replies in one folder. The questions are short on purpose.
- Which devices will run on my property, including dash cameras, body cameras and crew phones?
- Where will each camera point while the crew is on my lot, inside the house and at the curb?
- Will any camera record audio, and could that audio capture conversations inside my home?
- Who owns the account where the files are stored, and who on your staff can open them?
- How long are files kept after my final check, and who approves a deletion?
- Can I get a copy of any file that shows my home, and how many days does that take?
- Is any camera, storage or records fee included in my price, or billed later?
- Do crew members use personal phones for photos, and do those photos sync to a personal account?
- If a camera captures something we did not agree to share, what is your written process for pulling and removing it?
Ask for the answers in writing, with the name of the person who wrote them. If a roofer gives you a verbal answer on the phone, send a short email that repeats it and ask for a reply. A reply that says yes is an answer. A reply that says we will see is not one yet.
Before the crew arrives, tell the household that cameras will be running. Tell them where the truck will park and which windows face the curb. If someone in the home would rather not appear on a crew file, such as a teenager, a home health aide or a person in a protective arrangement, ask the roofer to keep that person out of frame and to route the crew's entry away from their room. Write the request into the job file so the crew lead sees it on the first morning.
If the answers stay vague, you have already made the comparison. A roofer who is clear about cameras, storage and deletion is giving you the same plain information you would want about the crew's insurance or its ladder plan. Call the office at (314) 220-2333 and ask for the written camera rule before you choose.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.